SAP ABAP Data Element CO_ATPSAVEKZ (Check material availability when saving order (network))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | CO_ATPSAVEKZ |
Short Description | Check material availability when saving order (network) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Check save |
Medium | 20 | Check avail.save |
Long | 40 | Check availability when saving order |
Heading | 48 | Check material availability when saving order |
Documentation
Definition
Defines per plant, order type and business transaction whether an automatic material availability check is to take place when an order (network) is saved.
An automatic material availability check is called up when an order (network) is saved, if the following changes have been made to components:
- Changes to fields: Requirements date, requirements quantity, unit of measure, material number, plant, storage location, batch, bulk material indicator, final issue indicator, lead-time offset, lead-time offset for operation, time unit, indicator quantity is fixed
- Changes to alternative data: Alternative item group, ranking order, strategy, usage probability
- Changes to discontinuation data: Discontinuation group, successor group, discontinuation indicator
- Add component
- Delete component
- Reassign component
In addition, the automatic availability check is called up if changes have been made to the order header that would also trigger automatic scheduling (for example, changes to dates or order quantities, sequence exchange and so on).
History
Last changed by/on | SAP | 19990310 |
SAP Release Created in |