SAP ABAP Data Element CCMEH (Unit of Measure)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KBAS (Package) Overhead Cost Controlling
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KBAS (Package) Overhead Cost Controlling
Basic Data
Data Element | CCMEH |
Short Description | Unit of Measure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CCMEH | |
Data Type | CHAR | Character String |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | U.of Meas. |
Medium | 15 | Unit of Measure |
Long | 20 | Unit of Measure |
Heading | 3 | UM |
Documentation
Definition
Unit for posted activity quantities.
Supplementary Documentation - CCMEH 0001
Use
- Master data
Consumption quantities for the cost element should be recorded in this consumption unit or one convertible to this consumption unit.
You can change the cost element master data only if the cost element has not been assigned or planned.
- Planning
In planning you can change the unit to a convertible unit on the cost element/cost center level. You can enter any unit when planning for the first time, provided no consumption unit is defined in the cost element master.
Dependencies
- If no consumption unit is defined in the cost element master and different quantity units were determined for cost center/cost element, quantity recording in actual/plan distribution is not possible.
- In Product Cost Controlling, you may have to carry out quantity controlling for important materials although materials with different quantity units are recorded under the same cost element. You can thus record these materials in CO individually, not on the cost element level. If this is the case, the material unit and not the cost element is updated in costing and in actual.
Note
Field changes
You can change this field for each fiscal year. For example, you can change the field content for a new fiscal year.
Time dependency
The data in this field is always time-based.
History
Last changed by/on | SAP | 19931130 |
SAP Release Created in |