SAP ABAP Data Element AWMEGPLA (Variances: Planned Quantity of Output Side)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element | AWMEGPLA |
Short Description | Variances: Planned Quantity of Output Side |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENGV8 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 15 | |
Decimal Places | 3 | |
Output Length | 20 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan Qty |
Medium | 15 | Plan Quantity |
Long | 20 | Planned Quantity |
Heading | 20 | Planned Quantity |
Documentation
Definition
Planned quantity on the output side used to calculate the variances.
- In Overhead Cost Controlling, this quantity is the activity planned for the activity type of a cost center, or for the business process.
- In Cost Object Controlling, this quantity depends on the target cost version:
- Target cost version 000: Costing lot size of the standard cost estimate
- Target cost version 001: Planned quantity of the preliminary cost estimate
- Target cost version 002: Costing lot size of the standard cost estimate
- Target cost version 003: Costing lot size of alternative material cost estimate
History
Last changed by/on | SAP | 19971020 |
SAP Release Created in |