SAP ABAP Data Element AWKUS (Variances: Cost Overrun/Underrun)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element | AWKUS |
Short Description | Variances: Cost Overrun/Underrun |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AWKUS | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Over/under |
Medium | 15 | Over/Underrun |
Long | 20 | Overrun/underrun |
Heading | 1 | C |
Documentation
Definition
Determines that the calculated variances are written to the variance object in the form of cost overruns and cost underruns.
Use
If more than one object is summarized, the amounts might cancel each other out. To avoid this, set the indicator.
Examples
The actual costs on an order are USD 10 higher than planned. On a second order for a product in the same product groups, the actual costs are USD 10 lower than planned. If the indicator was set and the variances for this product group are summarized, you can still see the individual variances as a cost overrun (+10) and cost underrun (-10).
History
Last changed by/on | SAP | 19971109 |
SAP Release Created in |