SAP ABAP Data Element AWEKF (Variances: Remaining Input Variance, Fixed)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element AWEKF
Short Description Variances: Remaining Input Variance, Fixed  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 RIV Fixed 
Medium 15 RIV Fixed 
Long 20 Remain InputVar. Fxd 
Heading 21 Remain InputVar., Fxd 
Documentation

Definition

Variance category on the input side

Difference between target costs and control costs that cannot be assigned to one of the following categories:

Use

The variance calculation process calculates the remaining input variances by period and cost element.

Dependencies

If you specified in the variance variant that you do not want to calculate input price variances, input quantity variances, or resource-usage variances, the system will only calculate remaining input variances.

Examples

Suppose that in Cost Object Controlling more materials were withdrawn from stock for a production order than were planned. In addition, more activities were charged to the order than were planned. This means that the actual input quantities for the materials and activities actually consumed differ from the target input quantities.

This situation will result in an increase in the calculated overhead rates because the input quantity variance increased the basis for overhead calculation. The variances that arise from the difference between the planned overhead rate and the actual overhead rate due to the changed basis are assigned to the category of remaining input variances.

Note

See also:

Calculation accuracy

History
Last changed by/on SAP  19970902 
SAP Release Created in