SAP ABAP Data Element AWBRS (Priority of Valuation with Current Standard Cost Estimate)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element | AWBRS |
Short Description | Priority of Valuation with Current Standard Cost Estimate |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AWBRF | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | StdCostEst |
Medium | 15 | Prio StdCostEst |
Long | 20 | Priority StdCostEst |
Heading | 2 | CE |
Documentation
Definition
Controls the priority with which a material is valuated using a current standard cost estimate for the material.
Use
Your entry here controls the valuation of work in process and scrap.
Procedure
- Enter "1" if you prefer to valuate the work in process and scrap with a current standard cost estimate.
- Enter "2" if valuating the work in process and scrap using a current standard cost estimate is the second-best option for you.
- Enter "3" if valuating the work in process and scrap using a current standard cost estimate is the third-best option for you.
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |