SAP ABAP Data Element AWBRP (Priority of Valuation at Planned Costs)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
KV (Package) Variance analysis RK-S/RK-K
⤷
⤷
⤷
Basic Data
| Data Element | AWBRP |
| Short Description | Priority of Valuation at Planned Costs |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | AWBRF | |
| Data Type | NUMC | Character string with only digits |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Plan costs |
| Medium | 15 | Prio. PlanCosts |
| Long | 20 | Priority plan costs |
| Heading | 2 | PC |
Documentation
Definition
Controls the priority with which the valuation at planned costs is made. Planned costs are calculated using a preliminary costing for the product cost collector or for the manufacturing order.
Use
Your entry here controls the valuation of work in process and scrap.
Procedure
- Enter 1 if you prefer to valuate the work in process and scrap with the planned costs.
- Enter 2 if valuating the work in process and scrap at planned costs is the second-best option for you.
- Enter 3 if valuating the work in process and scrap at planned costs is the third-best option for you.