SAP ABAP Data Element AWBRK (Priority of Valuation with Alternative Material Cost Est)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element | AWBRK |
Short Description | Priority of Valuation with Alternative Material Cost Est |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AWBRF | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prod.cost. |
Medium | 17 | Prio. AltMatCost |
Long | 22 | Priority AltMatCostEst |
Heading | 2 | MC |
Documentation
Definition
Controls the priority with which the valuation with an alternative material cost estimate should be made.
An alternative material cost estimate is a material cost estimate that is not the standard cost estimate for the material used to calculate the standard price.
Use
Your entry here controls the valuation of work in process and scrap.
Procedure
- Enter "1" if you prefer to valuate the work in process and scrap with an alternative material cost estimate.
- Enter "2" if valuating the work in process and scrap using an alternative material cost estimate is the second-best option for you.
- Enter "3" if valuating the work in process and scrap using an alternative material cost estimate is the third-best option for you.
Dependencies
If you want to valuate work in process and scrap using an alternative material cost estimate, create the material cost estimate in the Product Cost Planning application component.
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |