SAP ABAP Data Element AVMKZ (Long-term planning: Do not calculate scrap quantity)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element AVMKZ
Short Description Long-term planning: Do not calculate scrap quantity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 w/o scrap 
Medium 15 Without scrap 
Long 34 Switch off scrap calculation 
Heading  
Documentation

Definition

The selection means that no scrap is calculated in the planning run of long-term planning. Therefore:

  • No assembly scrap is planned in the net requirements calculation
  • The component scrap or the operation scrap is not planned during the BOM explosion

Use

Deactivating the scrap calculation is particularly useful for gross requirements planning as you would like to plan the pure requirements due to cost evaluation and budgeting purposes.

History
Last changed by/on SAP  19980414 
SAP Release Created in