SAP ABAP IMG Activity SIMG_CFMENUORK11KEM (Copy Cost Center Groups)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KE1C (Package) Customizing for Profit Center Accounting
IMG Activity
ID SIMG_CFMENUORK11KEM Copy Cost Center Groups  
Transaction Code S_ALR_87004270   IMG Activity: SIMG_CFMENUORK11KEM 
Created on 19981222    
Customizing Attributes SIMG_CFMENUORK11KEM   Copy Cost Center Groups 
Customizing Activity SIMG_CFMENUORK11KEM   Copy cost center groups 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUORK11KEM    

If your standard cost center hierarchy is similar to your standard profit center hierarchy, you can use this step to copy the cost center hierarchy to a profit center hierarchy. Once you have done this, you can then change the profit center groups as desired.

It is also possible to copy alternative cost center groups to alternative profit center groups. Note, however, that it is not possible to copy the standard cost center hierarchy to an alternative profit center group, or to copy an alternative cost center hierarchy to the standard profit center hierarchy.

You use the same number for corresponding cost centers and profit centers as well as for corresponding cost center groups and profit center groups.

You have set the desired controlling area.

If you want to copy the standard hierarchy, its name must already be entered in the controlling area settings, but the hierarchy structure itself cannot already exist. An existing profit center hierarchy cannot be overwritten, since this could lead to inconsistencies.

Activities

  1. If you want to copy the standard hierarchy, select the corresponding field and enter the name of the cost center standard hierarchy. All the nodes of the standard hierarchy will be copied. However, the profit centers will not be assigned to the end nodes of the hierarchy. You need to do this when you create the profit cetner master records.
  2. If you want to copy an alternative cost center group, leave the field "Copy standard hierarchy" blank and choose the desired cost center hierarchy. In this case the system will copy the end nodes with the corresponding profit center numbers.
  3. After copying, change the profit center hierarchy as desired.
  4. Save your standard hierarchy or profit center group.

Notes on transporting

You can transport the Customizing settings for Profit Center Accounting under Transport Connection.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUORK11KEM 0 HLA0009461 Basic Settings 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
2KEU T - Individual transaction object 2KEU 1 Copy cost center hierarchy 
History
Last changed by/on SAP  19981222 
SAP Release Created in