Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ INSC (Package) Application Development R/3 Plant Maintenance Customizing
IMG Activity
ID | OLIA_OICV_IMGDUMMY | Check Consistency of Value Category Assignment |
Transaction Code | S_ALR_87000780 | IMG Activity: OLIA_OICV_IMGDUMMY |
Created on | 19981222 | |
Customizing Attributes | OLIA_OICV_IMGDUMMY | Check consistency of value category assignment |
Customizing Activity | OLIA_OICV_IMGDUMMY | Check Consistency of Value Category Assignment |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OLIA_OICV_IMGDUMMY |
In this activity, you check the correct assignment of cost elements to value categories.
When you call the report, you specify the controlling area for which you want to run the consistency check.
Once the consistency check has run, the system issues a list containing information about the assignment of value categories for each controlling area.
The traffic lights at the end of a node help you to find errors.
Green traffic light:
No incorrect assignments exist below this hierarchy level.
Yellow traffic light:
Cost elements exist that were not assigned, or the cost element to which the value category points does not exist in the system. Value category contains cost elements with non-convertible units of measure.
Red traffic light: Critical assignment errors exist.
Critical assignment errors exist. For example, a cost element was assigned to several categories or a category was assigned to cost element with different debit types (costs/revenues).
The traffic light status is inherited up the hierarchy.
Furthermore, the cost elements are displayed in different colors, according to category.
The following cost element categories are in different colors:
- Costs and credit-side payments
- Revenues and debit-side payments
- Undefined
In correct assignments, each value category should only have cost elements of the same category. In addition, the category of the value category must match the category of the cost elements.
You can go directly to cost element maintenance from the log. To do this, choose the Display or Change icon.
The changes are displayed directly in the log after you have chosen the Refresh icon.
Further notes
If you change value categories subsequently, you must set up files PMCO and PMCOQT again. To do this, use program RIPMCO00.
You can also change value categories if records have already been saved to the files.
Furthermore, you must set up the information structures in the plant maintenance information system again, if you update cost and quantity quantity key figures depending on value categories.
You can use report 'RIPMS001' to set up the information structures again.
Business Attributes
ASAP Roadmap ID | 105 | Define functions and processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OLIA_OICV_IMGDUMMY | 0 | HLA0006648 O HLA0009595 O | |
SIMG | OLIA_OICV_IMGDUMMY | 1 | KA50000043 | Construction Equipment Management |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
IMGDUMMY | D - Dummy object | OIVC | OLIAOICVPA | Check Report for Value Categories |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |