Hierarchy

⤷

⤷

IMG Activity
ID | APOCIF_TCX00V | Assign Components to an Operation Segment |
Transaction Code | S_AXA_22000049 | (empty) |
Created on | 20030327 | |
Customizing Attributes | APOCIF_TCX00V | Assign Components to an Operation Segment |
Customizing Activity | APOCIF_TCX00V | Assign Components to an Operation Segment |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | APOCIF_TCX00V |
Use
The ERP system determines the requirements date of the component using the first operation segment of the assigned operation. In the ERP production order, this is the Start Setup date. For receipt elements (co/by-products), the system adopts the end date of the assigned operation. However, in SAP APO you can assign a component to any desired activity. An assignment to the Setup activity when you are using setup matrices or sequence-dependent setup activities leads to a significant reduction in performance when optimizing the setup time. Also, the components in production are usually only required for the first time at the Start Processing date.
You can use this IMG activity for the integration of production orders to control from which operation segment (Setup, Process, or Teardown) the requirements date of the associated components of an order is determined (that is, to which activity of an operation in SAP APO the components are assigned).
You can avoid a strictly defined assignment to the Setup operation segment, as well as enabling a uniform component assignment in both systems and a significant increase in performance for setup time optimization in SAP APO.
For the integration of the production process model (PPM), this setting determines to which activity of the operation the components are assigned when the PPM is generated.
These settings only relate to requirement elements (reservations) of a production order or of the assigned PPM. They do not relate to the receipt elements or to process orders.
Requirements
In ERP Customizing for scheduling, it is defined that an operation date should be used as the requirements date of the components.
Standard settings
Recommendation
Activities
Double-click the relevant entry and make the required settings.
Further notes
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | APOCIF_TCX00V | 0 | HLA0009520 | Production Planning and Control |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
CFO3 | T - Individual transaction object | CFO3 |
History
Last changed by/on | SAP | 20031127 |
SAP Release Created in |