Data Element list used by SAP ABAP Table AFKO (Order Header Data PP Orders)
SAP ABAP Table AFKO (Order Header Data PP Orders) is using
# Object Type Object Name Object Description Note
     
1 Data Element  ADCOMPARE PM/PS Reference Element
2 Data Element  AENNR Change Number
3 Data Element  AENNR Change Number
4 Data Element  AENNR Change Number
5 Data Element  ATRKZ Request ID
6 Data Element  AUFNR Order Number
7 Data Element  BASMN Base quantity
8 Data Element  BEDID ID of the capacity requirements record
9 Data Element  BEDID ID of the capacity requirements record
10 Data Element  BEDID ID of the capacity requirements record
11 Data Element  BREAKS Indicator: Scheduling allowing for breaks
12 Data Element  CC_CONF_KEY Identical object
13 Data Element  CFB_ADTDAYS Additional Days
14 Data Element  CFB_BBD_PPPI Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED)
15 Data Element  CFB_DATOFM Date of Manufacture
16 Data Element  CIM_COUNT Internal counter
17 Data Element  CIM_COUNT Internal counter
18 Data Element  CIM_COUNT Internal counter
19 Data Element  CN_COSTUPD Costs are updated
20 Data Element  COMP_CALC Indicator: Components will not be costed
21 Data Element  CO_ABARB Confirmation: Degree of processing
22 Data Element  CO_APLZL General counter for order
23 Data Element  CO_APRIO Order priority
24 Data Element  CO_AUFLD Date of BOM Explosion/Routing Transfer
25 Data Element  CO_AUFPL Routing number of operations in the order
26 Data Element  CO_AUFPL Routing number of operations in the order
27 Data Element  CO_COLORDPRC Collective order with/without automatic goods movement
28 Data Element  CO_DISPO MRP controller for the order
29 Data Element  CO_FTRMI Actual release date
30 Data Element  CO_FTRMP Planned release date
31 Data Element  CO_FTRMS Scheduled release date
32 Data Element  CO_FTRPS Scheduled release date (forecast)
33 Data Element  CO_GETRI Confirmed Order Finish Date
34 Data Element  CO_GEUZI Confirmed order finish (time)
35 Data Element  CO_GLTPP Finish date (forecast)
36 Data Element  CO_GLTPS Scheduled forecast finish
37 Data Element  CO_GLTRI Actual finish date
38 Data Element  CO_GLTRP Basic finish date
39 Data Element  CO_GLTRS Scheduled finish
40 Data Element  CO_GLUPP Forecast finish (time)
41 Data Element  CO_GLUPS Scheduled forecast finish time
42 Data Element  CO_GLUZP Basic finish (time)
43 Data Element  CO_GLUZS Scheduled finish time
44 Data Element  CO_GSBTR Overall commitment date
45 Data Element  CO_GSTPP Forecast start date
46 Data Element  CO_GSTPS Scheduled forecast start
47 Data Element  CO_GSTRI Actual start date
48 Data Element  CO_GSTRS Scheduled start
49 Data Element  CO_GSUPP Forecast start (time)
50 Data Element  CO_GSUPS Scheduled start time (Forecast)
51 Data Element  CO_GSUZI Actual start time
52 Data Element  CO_GSUZP Basic start time
53 Data Element  CO_GSUZS Scheduled Start (Time)
54 Data Element  CO_IASMG Scrap confirmed for order
55 Data Element  CO_IGMNG Yield confirmed from order confirmation
56 Data Element  CO_LAUFNR Leading order in current processing
57 Data Element  CO_LKNOT Left node in collective order
58 Data Element  CO_MES_INT_ROUTINGID Key of a Routing from an ME System
59 Data Element  CO_MES_MAX_GAMNG Maximum Value of Total Order Quantity After Distribution
60 Data Element  CO_NAUCOST Indicator: Do not cost automatically
61 Data Element  CO_NAUTERM Indicator: Do not schedule automatically
62 Data Element  CO_NOPCOST Do not calculate planned costs for order
63 Data Element  CO_PENDD Outline finish of collective order (date)
64 Data Element  CO_PENDT Outline finish time
65 Data Element  CO_PLAUF Date for routing transfer
66 Data Element  CO_POSNR Order item number
67 Data Element  CO_PRODNET Indicator: Order is part of collective order
68 Data Element  CO_PRODPRF Production Scheduling Profile
69 Data Element  CO_PSTARTD Outline start of collective network (date)
70 Data Element  CO_PSTARTT Start time of a collective order
71 Data Element  CO_RGEKZ Indicator: Backflushing for order
72 Data Element  CO_RKNOT Right node of a collective order
73 Data Element  CO_RUECK Completion confirmation number for the operation
74 Data Element  CO_TEILNET Number of superior network
75 Data Element  CO_UPTER Indicator: Change to Scheduled Dates
76 Data Element  CO_VFMNG Committed quantity for order acc. to ATP check components
77 Data Element  CR_OBJID Object ID of the resource
78 Data Element  CR_OBJID Object ID of the resource
79 Data Element  CR_OBJTY Object types of the CIM resource
80 Data Element  CR_OBJTY Object types of the CIM resource
81 Data Element  CSPLIT Apportionment structure
82 Data Element  CUOBJ Configuration (internal object number)
83 Data Element  CY_SEQNR Seq. number order
84 Data Element  DATUV Valid-From Date
85 Data Element  DATUV Valid-From Date
86 Data Element  DZKRIZ Counter for additional criteria
87 Data Element  FEVOR Production Supervisor
88 Data Element  FHORI Scheduling Margin Key for Floats
89 Data Element  FLG_AOB Indicator: relationships
90 Data Element  FLG_ARBEI Indicator: Default value work is relevant
91 Data Element  FREIZ Release period (in days)
92 Data Element  GAMNG Total order quantity
93 Data Element  GASMG Total scrap quantity in the order
94 Data Element  HISTU Level (in Multi-Level BOM Explosions)
95 Data Element  KALKVARIST Costing variant for actual costs
96 Data Element  KALKVARPLN Costing variant for planned costs
97 Data Element  KALSMA_CH Search procedure for batch determination
98 Data Element  KAPT_SICHZ Remaining float after finite scheduling
99 Data Element  KAPT_VORGZ Float (bef. production) remaining after finite scheduling
100 Data Element  KAPVERSA Version of Available Capacity
101 Data Element  KBED_D Ind: do not create capacity requirements
102 Data Element  LOSBS To Lot Size
103 Data Element  LOSDIV Lot size divisor
104 Data Element  LOSGRBIS To lot size
105 Data Element  LOSGRVON From Lot Size
106 Data Element  LOSVN From Lot Size
107 Data Element  LZEIH Unit for maximum storage period
108 Data Element  MANDT Client
109 Data Element  MATNR Material Number
110 Data Element  MATNR Material Number
111 Data Element  MAUFNR Number of superior order
112 Data Element  MAXLZ Maximum storage period
113 Data Element  MEINS Base Unit of Measure
114 Data Element  MEINS Base Unit of Measure
115 Data Element  NETZKONT Indicator for the account assignment of a network(hdr/act.)
116 Data Element  NETZ_UEBER Superior network number
117 Data Element  NO_DISP_PLUS Effective for Materials Planning
118 Data Element  OBJEKTID Object ID
119 Data Element  OCM_CH_PROC Process that has lead to the change of an object
120 Data Element  OCM_OBJ_TYPE Change indicator
121 Data Element  OIH_HANTYP Excise Duty Handling Type
122 Data Element  PLNAL Group Counter
123 Data Element  PLNAW Application of the task list
124 Data Element  PLNME Task list unit of measure
125 Data Element  PLNNR Key for Task List Group
126 Data Element  PLNTY Task List Type
127 Data Element  PLN_VERWE Task list usage
128 Data Element  PM_ORDGSTRP Basic Start Date
129 Data Element  POSNR Item number of the SD document
130 Data Element  POSNR Item number of the SD document
131 Data Element  PROFIDNZPL Network profile
132 Data Element  PS_KZERB Indicator: Project summarization
133 Data Element  PS_PLART Basis for scheduling
134 Data Element  PS_PSP_PRO Project definition
135 Data Element  QPLOS Inspection Lot Number
136 Data Element  REDKZ Reduction indicator for scheduling
137 Data Element  REDKZP Reduction indicator for scheduling (forecast)
138 Data Element  REVLV Revision level
139 Data Element  RMNGA Total confirmed rework quantity
140 Data Element  RSNUM Number of reservation/dependent requirements
141 Data Element  RSNUM Number of reservation/dependent requirements
142 Data Element  SICHZ Float after production (in days)
143 Data Element  SICHZ_TRM Scheduled float after production in days
144 Data Element  SPLIT_STAT Status of an order in a split hierarchy
145 Data Element  STALT Alternative BOM
146 Data Element  STLAN BOM Usage
147 Data Element  STLST BOM Statuses
148 Data Element  STLTY BOM Category
149 Data Element  STNUM Bill of Material
150 Data Element  TERHW Scheduling note from order scheduling
151 Data Element  TERMKZ Scheduling type
152 Data Element  TERMKZP Scheduling type (forecast)
153 Data Element  TRMDT Date of the last scheduling
154 Data Element  VAGRP Responsible planner group/department
155 Data Element  VBELN Sales and Distribution Document Number
156 Data Element  VORGZ Float before production (in days)
157 Data Element  VORGZ_TRM Scheduled float before production in days
158 Data Element  VORG_UEBER Superior activity
159 Data Element  VSNMR_V Sales document version number
160 Data Element  WEGXX Path (for Multi-Level BOM Explosions)
161 Data Element  WEGXX Path (for Multi-Level BOM Explosions)