SAP ABAP Data Element CO_GSBTR (Overall commitment date)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element CO_GSBTR
Short Description Overall commitment date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ov.commit. 
Medium 15 Ov.commitment 
Long 20 Overall commitment 
Heading 10 Committed 
Documentation

Definition

The overall commitment date is determined by the material availability check (only if ATP logic is used for the check).

It specifies the earliest date by which the complete order is to be produced (depending on the availability situation at the time of the last availability check).

The overall commitment date is calculated by calculating for all material components that were checked how many days they will be available after their requirements date. The overall commitment date is calculated from these delays and from the basic finish date of the order.

History
Last changed by/on SAP  19981210 
SAP Release Created in