SAP ABAP Table PSIS_GEN_NEKO (Generated structure for LDB PSJ. Do not modify manually.)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-IS (Application Component) Information System
     CNIS (Package) Application development R/3 PS information system
Basic Data
Table Category INTTAB    Structure 
Structure PSIS_GEN_NEKO   Table Relationship Diagram
Short Description Generated structure for LDB PSJ. Do not modify manually.    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 .INCLUDE       0   0   Generated structure for LDB PSJ. Do not modify manually.  
2 AUFNR AUFNR AUFNR CHAR 12   0   Order Number *
3 AUFPL CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
4 RSNUM RSNUM RSNUM NUMC 10   0   Number of reservation/dependent requirements *
5 NETZKONT NETZKONT NETZKONT CHAR 1   0   Indicator for the account assignment of a network(hdr/act.)  
6 MANDT MANDT MANDT CLNT 3   0   Client *
7 GLTRP CO_GLTRP DATUM DATS 8   0   Basic finish date  
8 GSTRP CO_GSTRP DATUM DATS 8   0   Basic start date  
9 FTRMS CO_FTRMS DATUM DATS 8   0   Scheduled release date  
10 GLTRS CO_GLTRS DATUM DATS 8   0   Scheduled finish  
11 GSTRS CO_GSTRS DATUM DATS 8   0   Scheduled start  
12 GSTRI CO_GSTRI DATUM DATS 8   0   Actual start date  
13 GETRI CO_GETRI DATUM DATS 8   0   Confirmed Order Finish Date  
14 GLTRI CO_GLTRI DATUM DATS 8   0   Actual finish date  
15 FTRMI CO_FTRMI DATUM DATS 8   0   Actual release date  
16 FTRMP CO_FTRMP DATUM DATS 8   0   Planned release date  
17 GASMG GASMG MENG13 QUAN 13   3   Total scrap quantity in the order  
18 GAMNG GAMNG MENG13 QUAN 13   3   Total order quantity  
19 GMEIN MEINS MEINS UNIT 3   0   Base Unit of Measure *
20 PLNBEZ MATNR MATNR CHAR 18   0   Material Number *
21 PLNTY PLNTY PLNTY CHAR 1   0   Task List Type *
22 PLNNR PLNNR PLNNR CHAR 8   0   Key for Task List Group  
23 PLNAW PLNAW PLNAW CHAR 1   0   Application of the task list *
24 PLNAL PLNAL ALTNR CHAR 2   0   Group Counter  
25 PVERW PLN_VERWE PLN_VERWE CHAR 3   0   Task list usage *
26 PLAUF CO_PLAUF DATUM DATS 8   0   Date for routing transfer  
27 PLSVB LOSGRBIS MENG13 QUAN 13   3   To lot size  
28 PLNME PLNME MEINS UNIT 3   0   Task list unit of measure *
29 PLSVN LOSGRVON MENG13 QUAN 13   3   From Lot Size  
30 PDATV DATUV DATUM DATS 8   0   Valid-From Date  
31 PAENR AENNR AENNR CHAR 12   0   Change Number *
32 PLGRP VAGRP VAGRP CHAR 3   0   Responsible planner group/department *
33 LODIV LOSDIV MENG13 QUAN 13   3   Lot size divisor  
34 STLTY STLTY STLTY CHAR 1   0   BOM Category  
35 STLBEZ MATNR MATNR CHAR 18   0   Material Number *
36 STLST STLST STLST NUMC 2   0   BOM Statuses *
37 STLNR STNUM STNUM CHAR 8   0   Bill of Material  
38 SDATV DATUV DATUM DATS 8   0   Valid-From Date  
39 SBMNG BASMN MENG13 QUAN 13   3   Base quantity  
40 SBMEH MEINS MEINS UNIT 3   0   Base Unit of Measure *
41 SAENR AENNR AENNR CHAR 12   0   Change Number *
42 STLAL STALT ALTNR CHAR 2   0   Alternative BOM  
43 STLAN STLAN STLAN CHAR 1   0   BOM Usage *
44 SLSVN LOSVN MENG13 QUAN 13   3   From Lot Size  
45 SLSBS LOSBS MENG13 QUAN 13   3   To Lot Size  
46 AUFLD CO_AUFLD DATUM DATS 8   0   Date of BOM Explosion/Routing Transfer  
47 DISPO CO_DISPO DISPO CHAR 3   0   MRP controller for the order *
48 FEVOR FEVOR FEVOR CHAR 3   0   Production Supervisor *
49 FHORI FHORI FHORI CHAR 3   0   Scheduling Margin Key for Floats *
50 TERKZ TERMKZ TERART CHAR 1   0   Scheduling type *
51 REDKZ REDKZ REDKZ CHAR 1   0   Reduction indicator for scheduling  
52 APRIO CO_APRIO CHAR1 CHAR 1   0   Order priority  
53 NTZUE NETZ_UEBER AUFNR CHAR 12   0   Superior network number *
54 VORUE VORG_UEBER VORNR CHAR 4   0   Superior activity  
55 PROFID PROFIDNZPL PROFILID CHAR 7   0   Network profile *
56 VORGZ VORGZ NUM3 NUMC 3   0   Float before production (in days)  
57 SICHZ SICHZ NUM3 NUMC 3   0   Float after production (in days)  
58 FREIZ FREIZ NUM3 NUMC 3   0   Release period (in days)  
59 UPTER CO_UPTER CHAR1 CHAR 1   0   Indicator: Change to Scheduled Dates  
60 BEDID BEDID BEDID NUMC 12   0   ID of the capacity requirements record *
61 PRONR PS_PSP_PRO PS_PSPNR NUMC 8   0   Project definition *
62 ZAEHL CIM_COUNT CIM_COUNT NUMC 8   0   Internal counter  
63 MZAEHL CIM_COUNT CIM_COUNT NUMC 8   0   Internal counter  
64 ZKRIZ DZKRIZ ZKRIZ NUMC 7   0   Counter for additional criteria  
65 PRUEFLOS QPLOS QPLOS NUMC 12   0   Inspection Lot Number *
66 KLVARP KALKVARPLN KLVAR CHAR 4   0   Costing variant for planned costs *
67 KLVARI KALKVARIST KLVAR CHAR 4   0   Costing variant for actual costs *
68 RGEKZ CO_RGEKZ CO_RGEKZ CHAR 1   0   Indicator: Backflushing for order  
69 PLART PS_PLART PS_PLART CHAR 1   0   Basis for scheduling  
70 FLG_AOB FLG_AOB FLAG CHAR 1   0   Indicator: relationships  
71 FLG_ARBEI FLG_ARBEI FLAG CHAR 1   0   Indicator: Default value work is relevant  
72 GLTPP CO_GLTPP DATUM DATS 8   0   Finish date (forecast)  
73 GSTPP CO_GSTPP DATUM DATS 8   0   Forecast start date  
74 GLTPS CO_GLTPS DATUM DATS 8   0   Scheduled forecast finish  
75 GSTPS CO_GSTPS DATUM DATS 8   0   Scheduled forecast start  
76 FTRPS CO_FTRPS DATUM DATS 8   0   Scheduled release date (forecast)  
77 RDKZP REDKZP REDKZ CHAR 1   0   Reduction indicator for scheduling (forecast)  
78 TRKZP TERMKZP TERART CHAR 1   0   Scheduling type (forecast) *
79 RUECK CO_RUECK CO_RUECK NUMC 10   0   Completion confirmation number for the operation  
80 RMZHL CIM_COUNT CIM_COUNT NUMC 8   0   Internal counter  
81 IGMNG CO_IGMNG MENG13 QUAN 13   3   Yield confirmed from order confirmation  
82 RATID BEDID BEDID NUMC 12   0   ID of the capacity requirements record *
83 GROID BEDID BEDID NUMC 12   0   ID of the capacity requirements record *
84 CUOBJ CUOBJ CUOBJ NUMC 18   0   Configuration (internal object number)  
85 GLUZS CO_GLUZS UHRZT TIMS 6   0   Scheduled finish time  
86 GSUZS CO_GSUZS ATIME TIMS 6   0   Scheduled Start (Time)  
87 REVLV REVLV REVLV CHAR 2   0   Revision level  
88 RSHTY CR_OBJTY CR_OBJTY CHAR 2   0   Object types of the CIM resource  
89 RSHID CR_OBJID CR_OBJID NUMC 8   0   Object ID of the resource *
90 RSNTY CR_OBJTY CR_OBJTY CHAR 2   0   Object types of the CIM resource  
91 RSNID CR_OBJID CR_OBJID NUMC 8   0   Object ID of the resource *
92 NAUTERM CO_NAUTERM KREUZ CHAR 1   0   Indicator: Do not schedule automatically  
93 NAUCOST CO_NAUCOST KREUZ CHAR 1   0   Indicator: Do not cost automatically  
94 STUFE HISTU DEC2 DEC 2   0   Level (in Multi-Level BOM Explosions)  
95 WEGXX WEGXX DEC4 DEC 4   0   Path (for Multi-Level BOM Explosions)  
96 VWEGX WEGXX DEC4 DEC 4   0   Path (for Multi-Level BOM Explosions)  
97 ARSNR RSNUM RSNUM NUMC 10   0   Number of reservation/dependent requirements *
98 ARSPS CO_POSNR CO_POSNR NUMC 4   0   Order item number  
99 MAUFNR MAUFNR AUFNR CHAR 12   0   Number of superior order *
100 LKNOT CO_LKNOT AUFNR CHAR 12   0   Left node in collective order *
101 RKNOT CO_RKNOT AUFNR CHAR 12   0   Right node of a collective order *
102 PRODNET CO_PRODNET KREUZ CHAR 1   0   Indicator: Order is part of collective order  
103 IASMG CO_IASMG MENG13 QUAN 13   3   Scrap confirmed for order  
104 ABARB CO_ABARB CO_ABARB NUMC 3   0   Confirmation: Degree of processing  
105 AUFNT CO_TEILNET AUFNR CHAR 12   0   Number of superior network *
106 AUFPT CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
107 APLZT CO_APLZL CO_APLZL NUMC 8   0   General counter for order *
108 NO_DISP NO_DISP_PLUS NO_DISP_PLUS CHAR 1   0   Effective for Materials Planning  
109 CSPLIT CSPLIT CSPLIT CHAR 4   0   Apportionment structure *
110 AENNR AENNR AENNR CHAR 12   0   Change Number *
111 CY_SEQNR CY_SEQNR CY_SEQNR NUMC 14   0   Seq. number order  
112 BREAKS BREAKS XFELD CHAR 1   0   Indicator: Scheduling allowing for breaks  
113 VORGZ_TRM VORGZ_TRM PUFFER_TRM DEC 6   3   Scheduled float before production in days  
114 SICHZ_TRM SICHZ_TRM PUFFER_TRM DEC 6   3   Scheduled float after production in days  
115 TRMDT TRMDT DATUM DATS 8   0   Date of the last scheduling  
116 GLUZP CO_GLUZP UHRZT TIMS 6   0   Basic finish (time)  
117 GSUZP CO_GSUZP UHRZT TIMS 6   0   Basic start time  
118 GSUZI CO_GSUZI UHRZT TIMS 6   0   Actual start time  
119 GEUZI CO_GEUZI UHRZT TIMS 6   0   Confirmed order finish (time)  
120 GLUPP CO_GLUPP UHRZT TIMS 6   0   Forecast finish (time)  
121 GSUPP CO_GSUPP UHRZT TIMS 6   0   Forecast start (time)  
122 GLUPS CO_GLUPS UHRZT TIMS 6   0   Scheduled forecast finish time  
123 GSUPS CO_GSUPS UHRZT TIMS 6   0   Scheduled start time (Forecast)  
124 CHSCH KALSMA_CH KALSM CHAR 6   0   Search procedure for batch determination *
125 KAPT_VORGZ KAPT_VORGZ NUM3 NUMC 3   0   Float (bef. production) remaining after finite scheduling  
126 KAPT_SICHZ KAPT_SICHZ NUM3 NUMC 3   0   Remaining float after finite scheduling  
127 LEAD_AUFNR CO_LAUFNR AUFNR CHAR 12   0   Leading order in current processing *
128 PNETSTARTD CO_PSTARTD DATUM DATS 8   0   Outline start of collective network (date)  
129 PNETSTARTT CO_PSTARTT ATIME TIMS 6   0   Start time of a collective order  
130 PNETENDD CO_PENDD DATUM DATS 8   0   Outline finish of collective order (date)  
131 PNETENDT CO_PENDT ATIME TIMS 6   0   Outline finish time  
132 KBED KBED_D XFELD CHAR 1   0   Ind: do not create capacity requirements  
133 KKALKR COMP_CALC XFELD CHAR 1   0   Indicator: Components will not be costed  
134 SFCPF CO_PRODPRF CO_PRODPRF CHAR 6   0   Production Scheduling Profile *
135 RMNGA RMNGA MENGV13 QUAN 13   3   Total confirmed rework quantity  
136 GSBTR CO_GSBTR DATUM DATS 8   0   Overall commitment date  
137 VFMNG CO_VFMNG MENG13 QUAN 13   3   Committed quantity for order acc. to ATP check components  
138 NOPCOST CO_NOPCOST XFELD CHAR 1   0   Do not calculate planned costs for order  
139 ATRKZ ATRKZ ATRKZ CHAR 1   0   Request ID  
140 OBJTYPE OCM_OBJ_TYPE OCM_OBJ_TYPE CHAR 1   0   Change indicator  
141 CH_PROC OCM_CH_PROC OCM_CH_PROC CHAR 1   0   Process that has lead to the change of an object  
142 KAPVERSA KAPVERSA KAPVERSION NUMC 2   0   Version of Available Capacity *
143 COLORDPROC CO_COLORDPRC CO_COLORDPRC CHAR 1   0   Collective order with/without automatic goods movement  
144 KZERB PS_KZERB XFELD CHAR 1   0   Indicator: Project summarization  
145 CONF_KEY CC_CONF_KEY CC_NUMC8 NUMC 8   0   Identical object  
146 ST_ARBID OBJEKTID NUM08 NUMC 8   0   Object ID  
147 VSNMR_V VSNMR_V VSNMR CHAR 12   0   Sales document version number  
148 TERHW TERHW TERHW CHAR 1   0   Scheduling note from order scheduling  
149 SPLSTAT SPLIT_STAT SPLIT_STAT CHAR 1   0   Status of an order in a split hierarchy  
150 COSTUPD CN_COSTUPD XFELD CHAR 1   0   Costs are updated  
151 RMANR VBELN VBELN CHAR 10   0   Sales and Distribution Document Number *
152 POSNR_RMA POSNR POSNR NUMC 6   0   Item number of the SD document *
153 POSNV_RMA POSNR POSNR NUMC 6   0   Item number of the SD document *
154 OIHANTYP OIH_HANTYP OIH_HANTYP CHAR 2   0   Excise Duty Handling Type *
History
Last changed by/on SAP  20130529 
SAP Release Created in