Where Used List (Program) for SAP ABAP Table/Structure Field MBEW-KALKL (MBEW)
SAP ABAP Table/Structure Field
MBEW - KALKL (MBEW) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | LKKBW_PCP_ITEMSF15 | Include LKKBW_PCP_ITEMSF15 | ||||
| 2 | LKKBW_PCP_ITEMSF16 | Include LKKBW_PCP_ITEMSF16 | ||||
| 3 | LKS07TOP | Include LKS07TOP | ||||
| 4 | LMALHBEW | FORM Routine MBEW | ||||
| 5 | LMG07F00 | MEPO_KNT_ENDE | ||||
| 6 | LMGD1I3L | MBEW-VPRSV | ||||
| 7 | LMGD1I3N | MBEW-STPRS | ||||
| 8 | LMV02F02 | Generated: Query for "No Data" in Material Master IDoc Segments | ||||
| 9 | MM03MFSQ_LESEN_KALKL_BME | LESEN_KALKL_BME | ||||
| 10 | MM03MI01_MBEW-VPRSV | MBEW-VPRSV | ||||
| 11 | MVBWBF01 | MVBWBF01 | ||||
| 12 | MVBWBI01 | Include UPX_WEB_MODEL_V2 | ||||
| 13 | MVBWBO01 | MVBWBO01 | ||||
| 14 | ONE_MAT_MBEW_ML_COMPARISON | Comparison of Matl Valuation Record with ML Data and Their Display | ||||
| 15 | RBDSECOP | Send Cost Component Split via ALE | ||||
| 16 | RCK50TOP | Daten | ||||
| 17 | RCKM2_NEUF01 | Include RCKM2_NEUF01 | ||||
| 18 | RCKM2_NEUF03 | Include RCKM2_NEUF03 | ||||
| 19 | RCKM2_NEUTOP | Include RCKM2_NEUTOP | ||||
| 20 | RM07KODA | Include RM07KODA: Datendeklaration | ||||
| 21 | RM07KODA_ALV | Include RM07KODA_ALV | ||||
| 22 | SAPLMGD1 | SAPLMGD1 | ||||
| 23 | SAPLMGD1 | SAPLMGD1 | ||||
| 24 | SAPLMGD2 | SAPLMGD2 | ||||
| 25 | SAPLMGD2 | SAPLMGD2 | ||||
| 26 | SAPMM03M | Material Master Maintenance | ||||
| 27 | SAPRCKM2 | Change Price Determination for Material Ledger | ||||
| 28 | SAPRCKMBEW3 | Correction: Inconsistency Between Material Master and Cost Estimate | ||||
| 29 | SAPRCKMBEW9 | Analysis: Inconsistent Cost Est. Numbers - Material Master/Cost Est. | ||||
| 30 | SAPRCKMU | Consistency Check Between Material Master and Material Ledger | ||||
| 31 | SAPRCK_CHECK_ANCHOR | Program SAPRCK_CHECK_ANCHOR | ||||
| 32 | SAPRCK_KALNR_CKMI1 | Inconsistent Cost Estimate Numbers: Material Master/Cost Estimate | ||||
| 33 | SAPRCK_SHIFT_CURR_STD_CE | Shifting the current to the previous standard cost estimate |