Where Used List (Program) for SAP ABAP Table/Structure Field EMBEW-VERS2 (EMBEW)
SAP ABAP Table/Structure Field
EMBEW - VERS2 (EMBEW) is used by
# | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
||
1 | ![]() |
LKS07TOP | Include LKS07TOP | ![]() |
![]() |
![]() |
2 | ![]() |
LMALHBEW | FORM Routine MBEW | ![]() |
![]() |
![]() |
3 | ![]() |
LMV02F02 | Generated: Query for "No Data" in Material Master IDoc Segments | ![]() |
![]() |
![]() |
4 | ![]() |
ONE_MAT_MBEW_ML_COMPARISON | Comparison of Matl Valuation Record with ML Data and Their Display | ![]() |
![]() |
![]() |
5 | ![]() |
RM07KODA | Include RM07KODA: Datendeklaration | ![]() |
![]() |
![]() |
6 | ![]() |
RM07KODA_ALV | Include RM07KODA_ALV | ![]() |
![]() |
![]() |
7 | ![]() |
SAPRCKMBEW3 | Correction: Inconsistency Between Material Master and Cost Estimate | ![]() |
![]() |
![]() |
8 | ![]() |
SAPRCKMBEW9 | Analysis: Inconsistent Cost Est. Numbers - Material Master/Cost Est. | ![]() |
![]() |
![]() |
9 | ![]() |
SAPRCKMU | Consistency Check Between Material Master and Material Ledger | ![]() |
![]() |
![]() |
10 | ![]() |
SAPRCK_CHECK_ANCHOR | Program SAPRCK_CHECK_ANCHOR | ![]() |
![]() |
![]() |
11 | ![]() |
SAPRCK_KALNR_CKMI1 | Inconsistent Cost Estimate Numbers: Material Master/Cost Estimate | ![]() |
![]() |
![]() |
12 | ![]() |
SAPRCK_SHIFT_CURR_STD_CE | Shifting the current to the previous standard cost estimate | ![]() |
![]() |
![]() |