Data Element list used by SAP ABAP Table RCPTM (I/O fields for scheduling task lists (SAPLCP03))
SAP ABAP Table
RCPTM (I/O fields for scheduling task lists (SAPLCP03)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CP_REDKZ | Reduction level for task lists | ||
| 2 | CP_RSTRA | Reduction strategy per operation | ||
| 3 | ENDE_TERM | Finish date for scheduling | ||
| 4 | LOSGR_TERM | Lot size | ||
| 5 | LOSME_TERM | Unit of the lot size used in scheduling | ||
| 6 | PLNAL | Group Counter | ||
| 7 | PLNNR | Key for Task List Group | ||
| 8 | PLNTY | Task List Type | ||
| 9 | REDVS_S1 | Red. of floats before and after production (%) | ||
| 10 | REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 11 | REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 12 | REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 13 | REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 14 | REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 15 | RED_ART | Reduction type | ||
| 16 | SICHZ | Float after production (in days) | ||
| 17 | START_TERM | Start date for scheduling | ||
| 18 | TERMKZ | Scheduling type | ||
| 19 | VORGZ | Float before production (in days) | ||
| 20 | WERKS_D | Plant |