Data Element list used by SAP ABAP Table MDSTATUSTYP (BADI structure for Status Table of Materials)
SAP ABAP Table
MDSTATUSTYP (BADI structure for Status Table of Materials) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ARBPT | MRP run: Time to read routing | ||
| 2 | BERID | MRP Area | ||
| 3 | DISPO | MRP controller | ||
| 4 | EINZT | MRP run: Time for evaluating the operating time | ||
| 5 | EXPLT | MRP run: Time for BOM explosion | ||
| 6 | INT4 | Natural number | ||
| 7 | INT4 | Natural number | ||
| 8 | INT4 | Natural number | ||
| 9 | INT4 | Natural number | ||
| 10 | INT4 | Natural number | ||
| 11 | INT4 | Natural number | ||
| 12 | INT4 | Natural number | ||
| 13 | INT4 | Natural number | ||
| 14 | INT4 | Natural number | ||
| 15 | INT4 | Natural number | ||
| 16 | INT4 | Natural number | ||
| 17 | INT4 | Natural number | ||
| 18 | INT4 | Natural number | ||
| 19 | INT4 | Natural number | ||
| 20 | INT4 | Natural number | ||
| 21 | INT4 | Natural number | ||
| 22 | INT4 | Natural number | ||
| 23 | INT4 | Natural number | ||
| 24 | INT4 | Natural number | ||
| 25 | INT4 | Natural number | ||
| 26 | INT4 | Natural number | ||
| 27 | INT4 | Natural number | ||
| 28 | INT4 | Natural number | ||
| 29 | INT4 | Natural number | ||
| 30 | INT4 | Natural number | ||
| 31 | INT4 | Natural number | ||
| 32 | LOTST | MRP run: Time for calculating net requirements and lot-size | ||
| 33 | MATNR | Material Number | ||
| 34 | MDRTIME | MRP run: Total duration for each material | ||
| 35 | MDTBT | MRP run: Time for deleting/saving MRP list | ||
| 36 | MDZUSATZ | Additional Field | ||
| 37 | MD_MATSTATUS | Material Status After Planning Run | ||
| 38 | MSGID | Message identification | ||
| 39 | MSGNR | Message number | ||
| 40 | MSGTX | Message text | ||
| 41 | POSTT | MRP run: Time for posting | ||
| 42 | READT | MRP run: Time required for reading the initial situation | ||
| 43 | RESBT | MRP run: Time required for saving dependent requirements | ||
| 44 | RQITT | MRP run: Time required for saving total requirements | ||
| 45 | SCHET | MRP run: Time required for lead time scheduling | ||
| 46 | WERKS_D | Plant |