Table/Structure Field list used by SAP ABAP Program RCNSOFST (Project info system: Form routines data selection, structure table)
SAP ABAP Program
RCNSOFST (Project info system: Form routines data selection, structure table) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ACT01 - SUMNR | Node number of the superior operation | ||
| 2 | ACTR - ABARBA | Confirmation: Degree of processing | ||
| 3 | ACTR - ABARBD | Confirmation: Degree of processing | ||
| 4 | ACTR - ARBEH | Unit for work | ||
| 5 | ACTR - ARBEI | Work involved in the activity | ||
| 6 | ACTR - AUFNR | Order/Network number | ||
| 7 | ACTR - DAUNE | Normal duration/unit | ||
| 8 | ACTR - DAUNO | Normal duration of the activity | ||
| 9 | ACTR - EVGEW | Aggregation weight for POC (PS progress) | ||
| 10 | ACTR - EWDAN | Normal duration (from forecast) of activity | ||
| 11 | ACTR - EWDNE | Unit for forecast normal duration | ||
| 12 | ACTR - EWEND | Forecast finish date | ||
| 13 | ACTR - EWSTD | Forecasted start date for the activity | ||
| 14 | ACTR - FPAVD | Earliest scheduled start date (forecast) | ||
| 15 | ACTR - FPEDD | Earliest scheduled finish date (forecast) | ||
| 16 | ACTR - FSAVD | Earliest scheduled start: Execution (date) | ||
| 17 | ACTR - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 18 | ACTR - IDAUE | Unit for actual duration | ||
| 19 | ACTR - IDAUR | Actual duration for confirmation | ||
| 20 | ACTR - IEDD | Actual finish: Execution (date) | ||
| 21 | ACTR - ISDD | Actual start: Execution (date) | ||
| 22 | ACTR - ISMNW | Actual work | ||
| 23 | ACTR - LTXA1 | Operation short text | ||
| 24 | ACTR - NPRIO | Priority | ||
| 25 | ACTR - NTANF | Constraint for activity start (Basic) | ||
| 26 | ACTR - NTEND | Constraint for finish of activity (Basic) | ||
| 27 | ACTR - ODAUE | Unit for remaining duration | ||
| 28 | ACTR - ODAUR | Remaining duration of activity | ||
| 29 | ACTR - OFMNW | Forecasted work (actual + remaining) | ||
| 30 | ACTR - PEDD | Forecast finish date of operation from confirmation | ||
| 31 | ACTR - REMNE | Unit for work | ||
| 32 | ACTR - REMNW | Remaining Work | ||
| 33 | ACTR - SPAVD | Latest scheduled start date (forecast) | ||
| 34 | ACTR - SPEDD | Latest scheduled finish date (forecast) | ||
| 35 | ACTR - SSAVD | Latest scheduled start: Execution (date) | ||
| 36 | ACTR - SSEDD | Latest scheduled finish: Execution (date) | ||
| 37 | ACTR - UVORN | Activity element number (work/external/general costs) | ||
| 38 | ACTR - VGTYP | Activity or element category | ||
| 39 | ACTR - VORNR | Activity number in network and standard network | ||
| 40 | AFABR - AUFNR2 | Order/Network number | ||
| 41 | AFABR - FEABD | Earliest finish date for the relationship | ||
| 42 | AFABR - FSABD | Earliest start date for the relationship | ||
| 43 | AFABR - LTXA12 | Operation short text | ||
| 44 | AFABR - NCH | Single-Character Flag | ||
| 45 | AFABR - SEABD | Latest finish date of the relationship | ||
| 46 | AFABR - SSABD | Latest start date of the relationship | ||
| 47 | AFABR - VORNR2 | Activity number in network and standard network | ||
| 48 | AFFH - PSNFH | Item Number for Production Resource/Tool | ||
| 49 | AFFHR - FEFHD | Earliest scheduled finish (date) of PRT usage | ||
| 50 | AFFHR - FHKTX | Description of the production resource/tool | ||
| 51 | AFFHR - FHMAR | Production resources/tools category | ||
| 52 | AFFHR - FHMNR | Production resource/tool number | ||
| 53 | AFFHR - FHWRK | Production resources/tools in plant | ||
| 54 | AFFHR - FSFHD | Earliest scheduled start (date) for PRT usage | ||
| 55 | AFFHR - IEFHD | Actual finish (date) of PRT usage | ||
| 56 | AFFHR - ISFHD | Actual start (date) of PRT usage | ||
| 57 | AFFHR - PSNFH | Item Number for Production Resource/Tool | ||
| 58 | AFFHR - SEFHD | Latest scheduled finish (date) of PRT usage | ||
| 59 | AFFHR - SSFHD | Latest scheduled start (date) for PRT usage | ||
| 60 | AFFH_INC - PSNFH | Item Number for Production Resource/Tool | ||
| 61 | AFKO - GETRI | Confirmed Order Finish Date | ||
| 62 | AFKO - GLTRI | Actual finish date | ||
| 63 | AFKO_INC - GETRI | Confirmed Order Finish Date | ||
| 64 | AFKO_INC - GLTRI | Actual finish date | ||
| 65 | AFRU - ARBID | Object ID | ||
| 66 | AFRU - MANDT | Client | ||
| 67 | AFRU01 - ARBID | Object ID | ||
| 68 | AFRU01 - MANDT | Client | ||
| 69 | AFRUR - ABARB | Confirmation: Degree of processing | ||
| 70 | AFRUR - AUFNR | Order/Network number | ||
| 71 | AFRUR - IEDD | Actual finish: Execution (date) | ||
| 72 | AFRUR - IEDZ | Actual finish: Execution (time) | ||
| 73 | AFRUR - ISDD | Actual start: Execution (date) | ||
| 74 | AFRUR - ISDZ | Actual start: Execution/setup (time) | ||
| 75 | AFRUR - ISMNE | Unit for work | ||
| 76 | AFRUR - ISMNW | Actual work | ||
| 77 | AFRUR - LTXA1 | Confirmation text | ||
| 78 | AFRUR - ODAUE | Unit for remaining duration | ||
| 79 | AFRUR - ODAUR | Remaining duration | ||
| 80 | AFRUR - OFMNE | Unit for work | ||
| 81 | AFRUR - OFMNW | Remaining work | ||
| 82 | AFRUR - PEDD | Forecast finish date of operation from confirmation | ||
| 83 | AFRUR - RMZHL | Confirmation counter | ||
| 84 | AFRUR - SPLIT | Split number | ||
| 85 | AFRUR - STZHL | Confirmation counter of cancelled confirmation | ||
| 86 | AFRUR - UVORN | Activity element number (work/external/general costs) | ||
| 87 | AFRUR - VORNR | Activity number in network and standard network | ||
| 88 | AFVGD - SUMNR | Node number of the superior operation | ||
| 89 | AFVGI - SUMNR | Node number of the superior operation | ||
| 90 | AUFK - AUTYP | Order category | ||
| 91 | AUFKR - APRIO | Order priority | ||
| 92 | AUFKR - AUFNR | Order Number | ||
| 93 | AUFKR - DISPO | MRP controller for the order | ||
| 94 | AUFKR - DSNAM | Name of MRP controller | ||
| 95 | AUFKR - GLTPP | Finish date (forecast) | ||
| 96 | AUFKR - GLTPS | Scheduled forecast finish | ||
| 97 | AUFKR - GLTRI | Actual finish date | ||
| 98 | AUFKR - GLTRP | Basic finish date | ||
| 99 | AUFKR - GLTRS | Scheduled finish | ||
| 100 | AUFKR - GSTPP | Forecast start date | ||
| 101 | AUFKR - GSTPS | Scheduled forecast start | ||
| 102 | AUFKR - GSTRI | Actual start date | ||
| 103 | AUFKR - GSTRP | Basic start date | ||
| 104 | AUFKR - GSTRS | Scheduled start | ||
| 105 | AUFKR - KTEXT | Description | ||
| 106 | AUFKR - LTEXT | Long Text Exists | ||
| 107 | AUFKR - MATNR | Material Number for Order | ||
| 108 | CRHD - OBJID | Object ID of the resource | ||
| 109 | DRAD - DOKAR | Document Type | ||
| 110 | DRAD - DOKNR | Document number | ||
| 111 | DRAD - DOKTL | Document part | ||
| 112 | DRAD - DOKVR | Document version | ||
| 113 | DRAT - DKTXT | Document description | ||
| 114 | ELM_PS - KOKRS | Controlling Area | ||
| 115 | ELM_PS - KOSTL | Cost Center | ||
| 116 | ELM_PS - KTEXT | Description | ||
| 117 | ELM_PS - OBJNR | Object number | ||
| 118 | ELM_PS - OBTYP | Node type | ||
| 119 | ELM_PS - PRCTR | Profit Center | ||
| 120 | IMPR - OBJNR | CO object number for inv. prog. position | ||
| 121 | IMPR - POSID | Identification for an investment program position | ||
| 122 | IMTP - PRNAM | Investment program name | ||
| 123 | KBED - CANUMF | Counter for the main capacity requirements record | ||
| 124 | KBED01 - CANUMF | Counter for the main capacity requirements record | ||
| 125 | KBEDI - CANUMF | Counter for the main capacity requirements record | ||
| 126 | KBEDR - ABARBA | Confirmation: Degree of processing | ||
| 127 | KBEDR - ABARBD | Confirmation: Degree of processing | ||
| 128 | KBEDR - ARBEH | Unit for work | ||
| 129 | KBEDR - ARBEI | Work involved in the activity | ||
| 130 | KBEDR - ARBPL | Work center | ||
| 131 | KBEDR - DAUNE | Normal duration/unit | ||
| 132 | KBEDR - DAUNO | Normal duration of the activity | ||
| 133 | KBEDR - FENDD | Earliest finish /date | ||
| 134 | KBEDR - FRUEHER | Actual start is before earliest scheduled start | ||
| 135 | KBEDR - FSTAD | Earliest start / date | ||
| 136 | KBEDR - IDAUE | Unit for actual duration | ||
| 137 | KBEDR - IDAUR | Actual duration for confirmation | ||
| 138 | KBEDR - IENDD | Actual finish / date | ||
| 139 | KBEDR - ISMNW | Actual work | ||
| 140 | KBEDR - ISTAD | Actual start / date | ||
| 141 | KBEDR - KAPAR | Capacity category | ||
| 142 | KBEDR - KAPTXT | Capacity short text | ||
| 143 | KBEDR - ODAUE | Unit for remaining duration | ||
| 144 | KBEDR - ODAUR | Remaining duration of activity | ||
| 145 | KBEDR - OFMNW | Forecasted work (actual + remaining) | ||
| 146 | KBEDR - PDAE | Unit of the forecasted duration from the confirmation | ||
| 147 | KBEDR - PDAU | Forecasted duration of activity from confirmation | ||
| 148 | KBEDR - PENDD | Forecast finish / date | ||
| 149 | KBEDR - PERNR | Personnel Number | ||
| 150 | KBEDR - PLNUM | Planned order number | ||
| 151 | KBEDR - REMNE | Unit for work | ||
| 152 | KBEDR - REMNW | Remaining work | ||
| 153 | KBEDR - SENDD | Latest finish / date | ||
| 154 | KBEDR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
| 155 | KBEDR - SPLIT | Split number | ||
| 156 | KBEDR - SSTAD | Latest start / date | ||
| 157 | KBEDR - USE04 | User field: Unit for quantity fields | ||
| 158 | KBEDR - USE05 | User field: Unit for quantity fields | ||
| 159 | KBEDR - USR04 | User field for quantity (length 10.3) | ||
| 160 | KBEDR - USR05 | User field for quantity (length 10.3) | ||
| 161 | KBEDR - VEINH | Unit for Duration of the Delay | ||
| 162 | KBEDR - VERZUG | Duration After Latest Scheduled Finish | ||
| 163 | KBEDR - VORBEI | Duration After Earliest Scheduled Start | ||
| 164 | KBEDR - WERKS | Plant | ||
| 165 | KKHIE - STUFE | CO-PC Hierarchy Level | ||
| 166 | KKRVDCOOBJ - OBJNR | Object number | ||
| 167 | KKRVDCOOBJ - VARHIEBG | Variable hierarchy code (CO object summarization) | ||
| 168 | MLSTR - EDATU | Fixed milestone date (basic) | ||
| 169 | MLSTR - KTEXT | Description | ||
| 170 | MLSTR - LST_ACTDT | Actual date (Milestone met) | ||
| 171 | MLSTR - LTXSP | Language: The long text was stored in this language | ||
| 172 | MLSTR - MLST_ZAEHL | Number of milestone | ||
| 173 | MLSTR - PDATU | Fixed milestone date (F) | ||
| 174 | MLSTR - TEDAT | Scheduled milestone date (Basic) | ||
| 175 | MLSTR - TPDAT | Scheduled milestone date (Forecast) | ||
| 176 | NETZR - APRIO | Order priority | ||
| 177 | NETZR - AUFNR | Network number | ||
| 178 | NETZR - DISPO | MRP controller for the order | ||
| 179 | NETZR - DSNAM | Name of MRP controller | ||
| 180 | NETZR - GETRI | Confirmed Order Finish Date | ||
| 181 | NETZR - GLTPP | Finish date (forecast) | ||
| 182 | NETZR - GLTPS | Scheduled forecast finish | ||
| 183 | NETZR - GLTRP | Basic finish date | ||
| 184 | NETZR - GLTRS | Scheduled finish | ||
| 185 | NETZR - GSTPP | Forecast start date | ||
| 186 | NETZR - GSTPS | Scheduled forecast start | ||
| 187 | NETZR - GSTRI | Actual start date | ||
| 188 | NETZR - GSTRP | Basic start date | ||
| 189 | NETZR - GSTRS | Scheduled start | ||
| 190 | NETZR - KTEXT | Description | ||
| 191 | NETZR - LTEXT | Long Text Exists | ||
| 192 | PLAF - PLNUM | Planned order number | ||
| 193 | PLAFR - MTEXT | Material description | ||
| 194 | PLAFR - PEDTR | Order finish date in the planned order | ||
| 195 | PLAFR - PLNUM | Planned order number | ||
| 196 | PLAFR - PLWRK | Planning Plant | ||
| 197 | PLAFR - PSTTR | Order start date in planned order | ||
| 198 | PLAFR - PWWRK | Production plant in planned order | ||
| 199 | PROJR - KALID | Factory calendar key | ||
| 200 | PROJR - PLFAZ | Project planned start date | ||
| 201 | PROJR - PLSEZ | Project planned finish date | ||
| 202 | PROJR - POST1 | PS: Short description (first text line) | ||
| 203 | PROJR - PSPID | Project definition | ||
| 204 | PROJR - PWHIE | WBS currency (project definition) | ||
| 205 | PROJR - VBUKR | Company code for the project | ||
| 206 | PROJR - VGSBR | Business area for the project | ||
| 207 | PROJR - VKOKR | Controlling area for the project | ||
| 208 | PRPSR - EDAUR | Duration | ||
| 209 | PRPSR - EEINH | Unit for the length (duration) of the WBS element | ||
| 210 | PRPSR - EENDE | Forecasted finish date of the WBS element | ||
| 211 | PRPSR - EETRM | Scheduled finish date (Forecast) | ||
| 212 | PRPSR - ESTRM | Scheduled start date (Forecast) | ||
| 213 | PRPSR - ESTRT | Forecasted start date of the WBS element | ||
| 214 | PRPSR - EVGEW | Aggregation weight for POC (PS progress) | ||
| 215 | PRPSR - FABKL | Calendar for the dates in the WBS element | ||
| 216 | PRPSR - IDAUR | Actual duration | ||
| 217 | PRPSR - IEINH | Unit for the length (duration) of the WBS element | ||
| 218 | PRPSR - IENDE | Actual finish date of the WBS element | ||
| 219 | PRPSR - ISTRT | Actual start date for the WBS element | ||
| 220 | PRPSR - PBUKR | Company code for WBS element | ||
| 221 | PRPSR - PDAUR | Forecast duration | ||
| 222 | PRPSR - PEINH | Unit for the length (duration) of the WBS element | ||
| 223 | PRPSR - PENDE | WBS element: Basic finish date | ||
| 224 | PRPSR - PGSBR | Business area for WBS element | ||
| 225 | PRPSR - PKOKR | Controlling area for WBS element | ||
| 226 | PRPSR - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 227 | PRPSR - POST1 | PS: Short description (first text line) | ||
| 228 | PRPSR - PSTRM | Scheduled start (Basic) | ||
| 229 | PRPSR - PSTRT | WBS element: Basic start date | ||
| 230 | PRPSR - PWPOS | WBS element currency | ||
| 231 | PRPSR - STUFE | Level in project hierarchy | ||
| 232 | PRPSR - VIEND | Tentative actual finish date for WBS element | ||
| 233 | PRPSR - VISTR | Tentative actual start date for WBS element | ||
| 234 | PRTE - EETRF | Earliest scheduled finish date (forecast) | ||
| 235 | PRTE - ESTRS | Latest scheduled start date (forecast) | ||
| 236 | PRTE - PETRF | Earliest scheduled finish date (basic) | ||
| 237 | PRTE - PETRM | Scheduled finish (Basic) | ||
| 238 | PRTE - PSTRS | Latest scheduled start date (basic) | ||
| 239 | PRTEINC - EETRF | PRTEINC-EETRF | ||
| 240 | PRTEINC - ESTRS | PRTEINC-ESTRS | ||
| 241 | PRTEINC - PETRF | PRTEINC-PETRF | ||
| 242 | PRTEINC - PETRM | Scheduled finish (Basic) | ||
| 243 | PRTEINC - PSTRS | PRTEINC-PSTRS | ||
| 244 | PSTXR - TXTAR | Text type | ||
| 245 | PSTXR - TXTTI | PS text description | ||
| 246 | RCRKK - KALID | Factory Calendar | ||
| 247 | RESBR - APOSN | BOM item number | ||
| 248 | RESBR - AUFNR | Order/Network number | ||
| 249 | RESBR - BANFNR | Purchase requisition number | ||
| 250 | RESBR - BANFPO | Item number of purchase requisition | ||
| 251 | RESBR - BDTER | Requirements date for the component | ||
| 252 | RESBR - KZBWS | Valuation of Special Stock | ||
| 253 | RESBR - MATNR | Material Number | ||
| 254 | RESBR - MTEXT | Material description | ||
| 255 | RESBR - PLNUM | Planned order number | ||
| 256 | RESBR - POSTP | Item category (bill of material) | ||
| 257 | RESBR - POTX1 | BOM Item Text (Line 1) | ||
| 258 | RESBR - RSNUM | Number of reservation/dependent requirements | ||
| 259 | RESBR - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 260 | RESBR - VORNR | Activity number in network and standard network | ||
| 261 | RSTHIE - ID | Internal: Node ID | ||
| 262 | RSTHIE - NAME | Name of a Hierarchy Object | ||
| 263 | RSTHIE - TLEVEL | Node level | ||
| 264 | RSTHIE - TYPE | Node type | ||
| 265 | STRUCR - ABARBA | Percent of completion for work | ||
| 266 | STRUCR - ABARBD | Processing % of duration | ||
| 267 | STRUCR - BUKRS | Company Code | ||
| 268 | STRUCR - DATFS | Earliest start date | ||
| 269 | STRUCR - DATSE | Latest finish date | ||
| 270 | STRUCR - EARBEH | Unit for work | ||
| 271 | STRUCR - EARBEI | Work | ||
| 272 | STRUCR - ECKEN | Finish date (from basic dates) | ||
| 273 | STRUCR - ECKST | Basic start date | ||
| 274 | STRUCR - EDAUEH | Actual duration unit | ||
| 275 | STRUCR - EDAUER | Duration | ||
| 276 | STRUCR - EVGEW | Aggregation weight for POC (PS progress) | ||
| 277 | STRUCR - FRUEHER | Actual start is before earliest scheduled start | ||
| 278 | STRUCR - GSBER | Business Area | ||
| 279 | STRUCR - IARBEH | Unit for work | ||
| 280 | STRUCR - IARBEI | Actual work | ||
| 281 | STRUCR - IDAUEH | Actual duration unit | ||
| 282 | STRUCR - IDAUER | Actual duration | ||
| 283 | STRUCR - ISTEN | Actual finish date | ||
| 284 | STRUCR - ISTST | Actual start date | ||
| 285 | STRUCR - KALID | Factory Calendar | ||
| 286 | STRUCR - KOKRS | Controlling Area | ||
| 287 | STRUCR - KURZTEXT | Short text/description of the object | ||
| 288 | STRUCR - OBJEKTID | ID/Object key | ||
| 289 | STRUCR - OBJEKTTYP | Object Type Text | ||
| 290 | STRUCR - PARBEH | Unit for work | ||
| 291 | STRUCR - PARBEI | Forecast work | ||
| 292 | STRUCR - PDAUEH | Actual duration unit | ||
| 293 | STRUCR - PDAUER | Forecast duration | ||
| 294 | STRUCR - PROGEN | Forecast finish date | ||
| 295 | STRUCR - PROGST | Forecast start date | ||
| 296 | STRUCR - PSPRI | Priority | ||
| 297 | STRUCR - RARBEH | Unit for work | ||
| 298 | STRUCR - RARBEI | Remaining work | ||
| 299 | STRUCR - RDAUEH | Actual duration unit | ||
| 300 | STRUCR - RDAUER | Remaining duration | ||
| 301 | STRUCR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
| 302 | STRUCR - STATXT | Edited status text | ||
| 303 | STRUCR - TEENFR | Earliest scheduled finish (from basic dates) | ||
| 304 | STRUCR - TEENSP | Latest scheduled finish (from basic dates) | ||
| 305 | STRUCR - TESTFR | Earliest scheduled start (from basic dates) | ||
| 306 | STRUCR - TESTSP | Latest scheduled start (from basic dates) | ||
| 307 | STRUCR - TPENFR | Earliest scheduled finish (from forecast dates) | ||
| 308 | STRUCR - TPENSP | Latest scheduled finish (from forecast dates) | ||
| 309 | STRUCR - TPSTFR | Earliest scheduled start (from forecast dates) | ||
| 310 | STRUCR - TPSTSP | Latest scheduled start (from forecast dates) | ||
| 311 | STRUCR - TXTSP | Language: The long text was stored in this language | ||
| 312 | STRUCR - USE04 | User field: Unit for quantity fields | ||
| 313 | STRUCR - USE05 | User field: Unit for quantity fields | ||
| 314 | STRUCR - USR04 | User field for quantity (length 10.3) | ||
| 315 | STRUCR - USR05 | User field for quantity (length 10.3) | ||
| 316 | STRUCR - VARBEH | Unit for work | ||
| 317 | STRUCR - VARBEI | Tentative work | ||
| 318 | STRUCR - VDAUEH | Actual duration unit | ||
| 319 | STRUCR - VDAUER | Tentative duration | ||
| 320 | STRUCR - VEINH | Unit for Duration of the Delay | ||
| 321 | STRUCR - VERNA | Name of responsible person (Project manager) | ||
| 322 | STRUCR - VERNR | Number of responsible person (project mgr)/MRP controller | ||
| 323 | STRUCR - VERZUG | Duration After Latest Scheduled Finish | ||
| 324 | STRUCR - VORBEI | Duration After Earliest Scheduled Start | ||
| 325 | STRUCR - VORLEN | Tentative finish date | ||
| 326 | STRUCR - VORLST | Tentative start date | ||
| 327 | STRUCR - WAERS | Currency Key | ||
| 328 | STRUCR - WERKS | Plant | ||
| 329 | STRUCR_AFTER_RPSCO - EVGEW | Aggregation weight for POC (PS progress) | ||
| 330 | STRUCR_BEFORE_DATES - KURZTEXT | Short text/description of the object | ||
| 331 | STRUCR_BEFORE_DATES - OBJEKTID | ID/Object key | ||
| 332 | STRUCR_BEFORE_DATES - OBJEKTTYP | Object Type Text | ||
| 333 | STRUCR_BEFORE_RPSCO - BUKRS | Company Code | ||
| 334 | STRUCR_BEFORE_RPSCO - FRUEHER | Actual start is before earliest scheduled start | ||
| 335 | STRUCR_BEFORE_RPSCO - GSBER | Business Area | ||
| 336 | STRUCR_BEFORE_RPSCO - KALID | Factory Calendar | ||
| 337 | STRUCR_BEFORE_RPSCO - KOKRS | Controlling Area | ||
| 338 | STRUCR_BEFORE_RPSCO - PSPRI | Priority | ||
| 339 | STRUCR_BEFORE_RPSCO - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
| 340 | STRUCR_BEFORE_RPSCO - STATXT | Edited status text | ||
| 341 | STRUCR_BEFORE_RPSCO - TXTSP | Language: The long text was stored in this language | ||
| 342 | STRUCR_BEFORE_RPSCO - VEINH | Unit for Duration of the Delay | ||
| 343 | STRUCR_BEFORE_RPSCO - VERNA | Name of responsible person (Project manager) | ||
| 344 | STRUCR_BEFORE_RPSCO - VERNR | Number of responsible person (project mgr)/MRP controller | ||
| 345 | STRUCR_BEFORE_RPSCO - VERZUG | Duration After Latest Scheduled Finish | ||
| 346 | STRUCR_BEFORE_RPSCO - VORBEI | Duration After Earliest Scheduled Start | ||
| 347 | STRUCR_BEFORE_RPSCO - WAERS | Currency Key | ||
| 348 | STRUCR_BEFORE_RPSCO - WERKS | Plant | ||
| 349 | STRUCR_BEFORE_USER - ABARBA | Percent of completion for work | ||
| 350 | STRUCR_BEFORE_WORK - ABARBD | Processing % of duration | ||
| 351 | STRUCR_BEFORE_WORK - EDAUEH | Actual duration unit | ||
| 352 | STRUCR_BEFORE_WORK - EDAUER | Duration | ||
| 353 | STRUCR_BEFORE_WORK - IDAUEH | Actual duration unit | ||
| 354 | STRUCR_BEFORE_WORK - IDAUER | Actual duration | ||
| 355 | STRUCR_BEFORE_WORK - PDAUEH | Actual duration unit | ||
| 356 | STRUCR_BEFORE_WORK - PDAUER | Forecast duration | ||
| 357 | STRUCR_BEFORE_WORK - RDAUEH | Actual duration unit | ||
| 358 | STRUCR_BEFORE_WORK - RDAUER | Remaining duration | ||
| 359 | STRUCR_BEFORE_WORK - VDAUEH | Actual duration unit | ||
| 360 | STRUCR_BEFORE_WORK - VDAUER | Tentative duration | ||
| 361 | STRUCR_DATES - DATFS | Earliest start date | ||
| 362 | STRUCR_DATES - DATSE | Latest finish date | ||
| 363 | STRUCR_DATES - ECKEN | Finish date (from basic dates) | ||
| 364 | STRUCR_DATES - ECKST | Basic start date | ||
| 365 | STRUCR_DATES - ISTEN | Actual finish date | ||
| 366 | STRUCR_DATES - ISTST | Actual start date | ||
| 367 | STRUCR_DATES - PROGEN | Forecast finish date | ||
| 368 | STRUCR_DATES - PROGST | Forecast start date | ||
| 369 | STRUCR_DATES - TEENFR | Earliest scheduled finish (from basic dates) | ||
| 370 | STRUCR_DATES - TEENSP | Latest scheduled finish (from basic dates) | ||
| 371 | STRUCR_DATES - TESTFR | Earliest scheduled start (from basic dates) | ||
| 372 | STRUCR_DATES - TESTSP | Latest scheduled start (from basic dates) | ||
| 373 | STRUCR_DATES - TPENFR | Earliest scheduled finish (from forecast dates) | ||
| 374 | STRUCR_DATES - TPENSP | Latest scheduled finish (from forecast dates) | ||
| 375 | STRUCR_DATES - TPSTFR | Earliest scheduled start (from forecast dates) | ||
| 376 | STRUCR_DATES - TPSTSP | Latest scheduled start (from forecast dates) | ||
| 377 | STRUCR_DATES - VORLEN | Tentative finish date | ||
| 378 | STRUCR_DATES - VORLST | Tentative start date | ||
| 379 | STRUCR_USER - USE04 | User field: Unit for quantity fields | ||
| 380 | STRUCR_USER - USE05 | User field: Unit for quantity fields | ||
| 381 | STRUCR_USER - USR04 | User field for quantity (length 10.3) | ||
| 382 | STRUCR_USER - USR05 | User field for quantity (length 10.3) | ||
| 383 | STRUCR_WORK - EARBEH | Unit for work | ||
| 384 | STRUCR_WORK - EARBEI | Work | ||
| 385 | STRUCR_WORK - IARBEH | Unit for work | ||
| 386 | STRUCR_WORK - IARBEI | Actual work | ||
| 387 | STRUCR_WORK - PARBEH | Unit for work | ||
| 388 | STRUCR_WORK - PARBEI | Forecast work | ||
| 389 | STRUCR_WORK - RARBEH | Unit for work | ||
| 390 | STRUCR_WORK - RARBEI | Remaining work | ||
| 391 | STRUCR_WORK - VARBEH | Unit for work | ||
| 392 | STRUCR_WORK - VARBEI | Tentative work | ||
| 393 | SYST - FDPOS | ABAP System Field: Occurrence in Byte or Character String | ||
| 394 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 395 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 396 | SYST - MANDT | ABAP System Field: Client ID of Current User | ||
| 397 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 398 | SYST - TFILL | ABAP System Field: Number of Rows in Internal Tables | ||
| 399 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 400 | T001W - FABKL | Factory calendar key | ||
| 401 | T006 - MSEHI | Unit of Measurement | ||
| 402 | TCN04 - SPRAS | Language Key | ||
| 403 | TCN04 - TXT08 | Description for PS text type (8 characters) | ||
| 404 | TCN04 - TXTAR | Text type | ||
| 405 | TCNDS - HIERAR | Hierarchy Type | ||
| 406 | TCNDS - HIERID | Hierarchy ID | ||
| 407 | TKKR1 - FLENGTH | Length of Hierarchy Field | ||
| 408 | TKKR1 - HIART | Hierarchy Type | ||
| 409 | TKKR1 - IDENT | Hierarchy ID | ||
| 410 | TKKR1 - OFFSET | Offset of Hierarchy Field | ||
| 411 | TKKR1 - STUFE | Number of Hierarchy Level | ||
| 412 | VBAK - OBJNR | Object number at header level | ||
| 413 | VBAKR - BUKRS_VF | Company code to be billed | ||
| 414 | VBAKR - GUEBG | Valid-from date (outline agreements, product proposals) | ||
| 415 | VBAKR - GUEEN | Valid-to date (outline agreements, product proposals) | ||
| 416 | VBAKR - KDAUF | Sales Document | ||
| 417 | VBAKR - KTEXT | Search term for product proposal | ||
| 418 | VBAPR - ARKTX | Short text for sales order item | ||
| 419 | VBAPR - KDAUF | Sales Document | ||
| 420 | VBAPR - KDPOS | Sales Document Item |