Table/Structure Field list used by SAP ABAP Program RCNDATFS (Project Info System: Data Declarations on Filter)
SAP ABAP Program RCNDATFS (Project Info System: Data Declarations on Filter) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | ACTR - ARBPL | Work center | |
2 | Table/Structure Field | ACTR - VGTYP | Activity or element category | |
3 | Table/Structure Field | AFKO - DISPO | MRP controller for the order | |
4 | Table/Structure Field | AFKO - FEVOR | Production Supervisor | |
5 | Table/Structure Field | AFKO_INC - DISPO | MRP controller for the order | |
6 | Table/Structure Field | AFKO_INC - FEVOR | Production Supervisor | |
7 | Table/Structure Field | AFVGD - MLSTN | Usage | |
8 | Table/Structure Field | AFVGI - MLSTN | Usage | |
9 | Table/Structure Field | CRHD - ARBPL | Work center | |
10 | Table/Structure Field | CRHD - OBJID | Object ID of the resource | |
11 | Table/Structure Field | CRHD - WERKS | Plant | |
12 | Table/Structure Field | CRHH - NAME | Name of hierarchy | |
13 | Table/Structure Field | CRHH - WERKS | Plant | |
14 | Table/Structure Field | CRID - OBJID | Object ID of the resource | |
15 | Table/Structure Field | DFIES - SCRTEXT_L | Long Field Label | |
16 | Table/Structure Field | FILTR - ECKENR | Basic finish date (relative to today's date) | |
17 | Table/Structure Field | FILTR - ECKSTR | Basic start date (relative to today's date) | |
18 | Table/Structure Field | FILTR - FLG_CRIT | Indicator: Activity is critical | |
19 | Table/Structure Field | FILTR - FLG_SUBCRT | Indicator: Activity is sub-critical | |
20 | Table/Structure Field | FILTR - ISTENR | Actual finish date (relative to today's date) | |
21 | Table/Structure Field | FILTR - PROGENR | Forecast finish date (relative to today's date) | |
22 | Table/Structure Field | FILTR - PROGSTR | Forecast start date (relative to today's date) | |
23 | Table/Structure Field | FILTR - TEENFRR | Earliest scheduled finish (basic; relative to today's date) | |
24 | Table/Structure Field | FILTR - TEENSPR | Latest scheduled finish (basic; relative to today's date) | |
25 | Table/Structure Field | FILTR - TESTFRR | Earliest scheduled start (Basic; relative to today's date) | |
26 | Table/Structure Field | FILTR - TESTSPR | Latest scheduled start (basic; relative to today's date) | |
27 | Table/Structure Field | FILTR - TPENFRR | Earliest scheduled finish (Fcst; relative to today's date) | |
28 | Table/Structure Field | FILTR - TPENSPR | Latest scheduled finish (Fcst; relative to today's date) | |
29 | Table/Structure Field | FILTR - TPSTFRR | Earliest scheduled start (Fcst; relative to today's date) | |
30 | Table/Structure Field | FILTR - TPSTSPR | Latest scheduled start (Forecast; relative to today's date) | |
31 | Table/Structure Field | FILTR - VORLENR | Tentative finish date (relative to today's date) | |
32 | Table/Structure Field | FILTR - VORLSTR | Tentative start date (relative to today's date) | |
33 | Table/Structure Field | JESTD - ITX04 | Individual status of an object (short form) | |
34 | Table/Structure Field | PROJ - VBUKR | Company code for the project | |
35 | Table/Structure Field | PROJ - VERNA | Name of responsible person (Project manager) | |
36 | Table/Structure Field | PROJ - VERNR | Number of the responsible person (project manager) | |
37 | Table/Structure Field | PROJ2_INC - VBUKR | Company code for the project | |
38 | Table/Structure Field | PROJ2_INC - VERNA | Name of responsible person (Project manager) | |
39 | Table/Structure Field | PROJ2_INC - VERNR | Number of the responsible person (project manager) | |
40 | Table/Structure Field | PROJ_INC - VBUKR | Company code for the project | |
41 | Table/Structure Field | PROJ_INC - VERNA | Name of responsible person (Project manager) | |
42 | Table/Structure Field | PROJ_INC - VERNR | Number of the responsible person (project manager) | |
43 | Table/Structure Field | PRPS - FKOKR | Controlling area of responsible cost center | |
44 | Table/Structure Field | PRPS - FKSTL | Responsible cost center | |
45 | Table/Structure Field | PRPS - PSPRI | Priority | |
46 | Table/Structure Field | PRPS - USR00 | 1st user field for 20 characters - WBS element- | |
47 | Table/Structure Field | PRPS - USR01 | 2nd user field 20 digits - WBS element | |
48 | Table/Structure Field | PRPS - USR02 | 3rd user-defined field 10 digits -WBS element | |
49 | Table/Structure Field | PRPS - USR03 | 4th user-defined field 10 digits -WBS element | |
50 | Table/Structure Field | PRPS - USR04 | 1st user-defined field for quantity(length 10,3) WBS element | |
51 | Table/Structure Field | PRPS - USR05 | 2nd use field for quantity (length 10,3) WBS element | |
52 | Table/Structure Field | PRPS - USR06 | 1st user field for values (length 10,3) WBS element | |
53 | Table/Structure Field | PRPS - USR07 | 2nd user field for values (length 10,3) -WBS element | |
54 | Table/Structure Field | PRPS - USR08 | 1st user field for date -WBS element | |
55 | Table/Structure Field | PRPS - USR09 | 2nd user field for date -WBS element | |
56 | Table/Structure Field | PRPS - USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | |
57 | Table/Structure Field | PRPS - USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | |
58 | Table/Structure Field | PRPS2_INC - FKOKR | Controlling area of responsible cost center | |
59 | Table/Structure Field | PRPS2_INC - FKSTL | Responsible cost center | |
60 | Table/Structure Field | PRPS2_INC - PSPRI | Priority | |
61 | Table/Structure Field | PRPS2_INC - USR00 | 1st user field for 20 characters - WBS element- | |
62 | Table/Structure Field | PRPS2_INC - USR01 | 2nd user field 20 digits - WBS element | |
63 | Table/Structure Field | PRPS2_INC - USR02 | 3rd user-defined field 10 digits -WBS element | |
64 | Table/Structure Field | PRPS2_INC - USR03 | 4th user-defined field 10 digits -WBS element | |
65 | Table/Structure Field | PRPS2_INC - USR04 | 1st user-defined field for quantity(length 10,3) WBS element | |
66 | Table/Structure Field | PRPS2_INC - USR05 | 2nd use field for quantity (length 10,3) WBS element | |
67 | Table/Structure Field | PRPS2_INC - USR06 | 1st user field for values (length 10,3) WBS element | |
68 | Table/Structure Field | PRPS2_INC - USR07 | 2nd user field for values (length 10,3) -WBS element | |
69 | Table/Structure Field | PRPS2_INC - USR08 | 1st user field for date -WBS element | |
70 | Table/Structure Field | PRPS2_INC - USR09 | 2nd user field for date -WBS element | |
71 | Table/Structure Field | PRPS2_INC - USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | |
72 | Table/Structure Field | PRPS2_INC - USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | |
73 | Table/Structure Field | PRPS_INC - FKOKR | Controlling area of responsible cost center | |
74 | Table/Structure Field | PRPS_INC - FKSTL | Responsible cost center | |
75 | Table/Structure Field | PRPS_INC - PSPRI | Priority | |
76 | Table/Structure Field | PRPS_INC - USR00 | 1st user field for 20 characters - WBS element- | |
77 | Table/Structure Field | PRPS_INC - USR01 | 2nd user field 20 digits - WBS element | |
78 | Table/Structure Field | PRPS_INC - USR02 | 3rd user-defined field 10 digits -WBS element | |
79 | Table/Structure Field | PRPS_INC - USR03 | 4th user-defined field 10 digits -WBS element | |
80 | Table/Structure Field | PRPS_INC - USR04 | 1st user-defined field for quantity(length 10,3) WBS element | |
81 | Table/Structure Field | PRPS_INC - USR05 | 2nd use field for quantity (length 10,3) WBS element | |
82 | Table/Structure Field | PRPS_INC - USR06 | 1st user field for values (length 10,3) WBS element | |
83 | Table/Structure Field | PRPS_INC - USR07 | 2nd user field for values (length 10,3) -WBS element | |
84 | Table/Structure Field | PRPS_INC - USR08 | 1st user field for date -WBS element | |
85 | Table/Structure Field | PRPS_INC - USR09 | 2nd user field for date -WBS element | |
86 | Table/Structure Field | PRPS_INC - USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | |
87 | Table/Structure Field | PRPS_INC - USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | |
88 | Table/Structure Field | RC68H - LEVELS | Number of levels | |
89 | Table/Structure Field | RCJ_RPSCO_LIS - AUFERLPLAN | Current order revenue plan | |
90 | Table/Structure Field | RCJ_RPSCO_LIS - AUFERLPLN2 | Order revenue plan (version 2) | |
91 | Table/Structure Field | RCJ_RPSCO_LIS - AUFKSTPLAN | Current order cost plan | |
92 | Table/Structure Field | RCJ_RPSCO_LIS - AUFKSTPLN2 | Order cost plan (version 2) | |
93 | Table/Structure Field | RCJ_RPSCO_LIS - AUFTRANF | Residual order plan | |
94 | Table/Structure Field | RCJ_RPSCO_LIS - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
95 | Table/Structure Field | RCJ_RPSCO_LIS - DEBFINPLN | Current cash budget, debit side | |
96 | Table/Structure Field | RCJ_RPSCO_LIS - DZHLNG | Total debit side payments (down payments and payments) | |
97 | Table/Structure Field | RCJ_RPSCO_LIS - FESTPROBL | Fixed price commitment | |
98 | Table/Structure Field | RCJ_RPSCO_LIS - FREIGABE | Release | |
99 | Table/Structure Field | RCJ_RPSCO_LIS - ISTERLOESE | Actual revenues | |
100 | Table/Structure Field | RCJ_RPSCO_LIS - ISTKOSTEN | Actual costs | |
101 | Table/Structure Field | RCJ_RPSCO_LIS - KREDFINPLN | Current financial budget, credit side | |
102 | Table/Structure Field | RCJ_RPSCO_LIS - KSTOBLGES | Total cost commitment | |
103 | Table/Structure Field | RCJ_RPSCO_LIS - KZHLNG | Total credit side payments (down payments and payments) | |
104 | Table/Structure Field | RCJ_RPSCO_LIS - PROERLPLAN | Current project revenue plan | |
105 | Table/Structure Field | RCJ_RPSCO_LIS - PROERLPLN2 | Project revenue plan (version 2) | |
106 | Table/Structure Field | RCJ_RPSCO_LIS - PROKSTPLAN | Current project cost plan | |
107 | Table/Structure Field | RCJ_RPSCO_LIS - PROKSTPLN2 | Project cost plan (version 2) | |
108 | Table/Structure Field | RPSCO_LISC - AUFERLPLAN | Current order revenue plan | |
109 | Table/Structure Field | RPSCO_LISC - AUFERLPLN2 | Order revenue plan (version 2) | |
110 | Table/Structure Field | RPSCO_LISC - AUFKSTPLAN | Current order cost plan | |
111 | Table/Structure Field | RPSCO_LISC - AUFKSTPLN2 | Order cost plan (version 2) | |
112 | Table/Structure Field | RPSCO_LISC - AUFTRANF | Residual order plan | |
113 | Table/Structure Field | RPSCO_LISC - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
114 | Table/Structure Field | RPSCO_LISC - DEBFINPLN | Current cash budget, debit side | |
115 | Table/Structure Field | RPSCO_LISC - DZHLNG | Total debit side payments (down payments and payments) | |
116 | Table/Structure Field | RPSCO_LISC - FESTPROBL | Fixed price commitment | |
117 | Table/Structure Field | RPSCO_LISC - FREIGABE | Release | |
118 | Table/Structure Field | RPSCO_LISC - ISTERLOESE | Actual revenues | |
119 | Table/Structure Field | RPSCO_LISC - ISTKOSTEN | Actual costs | |
120 | Table/Structure Field | RPSCO_LISC - KREDFINPLN | Current financial budget, credit side | |
121 | Table/Structure Field | RPSCO_LISC - KSTOBLGES | Total cost commitment | |
122 | Table/Structure Field | RPSCO_LISC - KZHLNG | Total credit side payments (down payments and payments) | |
123 | Table/Structure Field | RPSCO_LISC - PROERLPLAN | Current project revenue plan | |
124 | Table/Structure Field | RPSCO_LISC - PROERLPLN2 | Project revenue plan (version 2) | |
125 | Table/Structure Field | RPSCO_LISC - PROKSTPLAN | Current project cost plan | |
126 | Table/Structure Field | RPSCO_LISC - PROKSTPLN2 | Project cost plan (version 2) | |
127 | Table/Structure Field | RS38L - NAME | Name of Function Module | |
128 | Table/Structure Field | RSPARAMS - SELNAME | ABAP/4: Name of SELECT-OPTION / PARAMETER | |
129 | Table/Structure Field | RVART - VARIANT | CHAR14 for SYST | |
130 | Table/Structure Field | STRUCR - ABARBA | Percent of completion for work | |
131 | Table/Structure Field | STRUCR - ABARBD | Processing % of duration | |
132 | Table/Structure Field | STRUCR - AUFERLPLAN | Current order revenue plan | |
133 | Table/Structure Field | STRUCR - AUFERLPLN2 | Order revenue plan (version 2) | |
134 | Table/Structure Field | STRUCR - AUFKSTPLAN | Current order cost plan | |
135 | Table/Structure Field | STRUCR - AUFKSTPLN2 | Order cost plan (version 2) | |
136 | Table/Structure Field | STRUCR - AUFTRANF | Residual order plan | |
137 | Table/Structure Field | STRUCR - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
138 | Table/Structure Field | STRUCR - DEBFINPLN | Current cash budget, debit side | |
139 | Table/Structure Field | STRUCR - DZHLNG | Total debit side payments (down payments and payments) | |
140 | Table/Structure Field | STRUCR - EARBEI | Work | |
141 | Table/Structure Field | STRUCR - ECKEN | Finish date (from basic dates) | |
142 | Table/Structure Field | STRUCR - ECKST | Basic start date | |
143 | Table/Structure Field | STRUCR - EDAUER | Duration | |
144 | Table/Structure Field | STRUCR - FESTPROBL | Fixed price commitment | |
145 | Table/Structure Field | STRUCR - FREIGABE | Release | |
146 | Table/Structure Field | STRUCR - FRUEHER | Actual start is before earliest scheduled start | |
147 | Table/Structure Field | STRUCR - IARBEI | Actual work | |
148 | Table/Structure Field | STRUCR - IDAUER | Actual duration | |
149 | Table/Structure Field | STRUCR - ISTEN | Actual finish date | |
150 | Table/Structure Field | STRUCR - ISTERLOESE | Actual revenues | |
151 | Table/Structure Field | STRUCR - ISTKOSTEN | Actual costs | |
152 | Table/Structure Field | STRUCR - ISTST | Actual start date | |
153 | Table/Structure Field | STRUCR - KREDFINPLN | Current financial budget, credit side | |
154 | Table/Structure Field | STRUCR - KSTOBLGES | Total cost commitment | |
155 | Table/Structure Field | STRUCR - KZHLNG | Total credit side payments (down payments and payments) | |
156 | Table/Structure Field | STRUCR - PARBEI | Forecast work | |
157 | Table/Structure Field | STRUCR - PDAUER | Forecast duration | |
158 | Table/Structure Field | STRUCR - PROERLPLAN | Current project revenue plan | |
159 | Table/Structure Field | STRUCR - PROERLPLN2 | Project revenue plan (version 2) | |
160 | Table/Structure Field | STRUCR - PROGEN | Forecast finish date | |
161 | Table/Structure Field | STRUCR - PROGST | Forecast start date | |
162 | Table/Structure Field | STRUCR - PROKSTPLAN | Current project cost plan | |
163 | Table/Structure Field | STRUCR - PROKSTPLN2 | Project cost plan (version 2) | |
164 | Table/Structure Field | STRUCR - RARBEI | Remaining work | |
165 | Table/Structure Field | STRUCR - RDAUER | Remaining duration | |
166 | Table/Structure Field | STRUCR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
167 | Table/Structure Field | STRUCR - TEENFR | Earliest scheduled finish (from basic dates) | |
168 | Table/Structure Field | STRUCR - TEENSP | Latest scheduled finish (from basic dates) | |
169 | Table/Structure Field | STRUCR - TESTFR | Earliest scheduled start (from basic dates) | |
170 | Table/Structure Field | STRUCR - TESTSP | Latest scheduled start (from basic dates) | |
171 | Table/Structure Field | STRUCR - TPENFR | Earliest scheduled finish (from forecast dates) | |
172 | Table/Structure Field | STRUCR - TPENSP | Latest scheduled finish (from forecast dates) | |
173 | Table/Structure Field | STRUCR - TPSTFR | Earliest scheduled start (from forecast dates) | |
174 | Table/Structure Field | STRUCR - TPSTSP | Latest scheduled start (from forecast dates) | |
175 | Table/Structure Field | STRUCR - VARBEI | Tentative work | |
176 | Table/Structure Field | STRUCR - VDAUER | Tentative duration | |
177 | Table/Structure Field | STRUCR - VERZUG | Duration After Latest Scheduled Finish | |
178 | Table/Structure Field | STRUCR - VORBEI | Duration After Earliest Scheduled Start | |
179 | Table/Structure Field | STRUCR - VORLEN | Tentative finish date | |
180 | Table/Structure Field | STRUCR - VORLST | Tentative start date | |
181 | Table/Structure Field | STRUCR_BEFORE_RPSCO - FRUEHER | Actual start is before earliest scheduled start | |
182 | Table/Structure Field | STRUCR_BEFORE_RPSCO - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
183 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VERZUG | Duration After Latest Scheduled Finish | |
184 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VORBEI | Duration After Earliest Scheduled Start | |
185 | Table/Structure Field | STRUCR_BEFORE_USER - ABARBA | Percent of completion for work | |
186 | Table/Structure Field | STRUCR_BEFORE_WORK - ABARBD | Processing % of duration | |
187 | Table/Structure Field | STRUCR_BEFORE_WORK - EDAUER | Duration | |
188 | Table/Structure Field | STRUCR_BEFORE_WORK - IDAUER | Actual duration | |
189 | Table/Structure Field | STRUCR_BEFORE_WORK - PDAUER | Forecast duration | |
190 | Table/Structure Field | STRUCR_BEFORE_WORK - RDAUER | Remaining duration | |
191 | Table/Structure Field | STRUCR_BEFORE_WORK - VDAUER | Tentative duration | |
192 | Table/Structure Field | STRUCR_DATES - ECKEN | Finish date (from basic dates) | |
193 | Table/Structure Field | STRUCR_DATES - ECKST | Basic start date | |
194 | Table/Structure Field | STRUCR_DATES - ISTEN | Actual finish date | |
195 | Table/Structure Field | STRUCR_DATES - ISTST | Actual start date | |
196 | Table/Structure Field | STRUCR_DATES - PROGEN | Forecast finish date | |
197 | Table/Structure Field | STRUCR_DATES - PROGST | Forecast start date | |
198 | Table/Structure Field | STRUCR_DATES - TEENFR | Earliest scheduled finish (from basic dates) | |
199 | Table/Structure Field | STRUCR_DATES - TEENSP | Latest scheduled finish (from basic dates) | |
200 | Table/Structure Field | STRUCR_DATES - TESTFR | Earliest scheduled start (from basic dates) | |
201 | Table/Structure Field | STRUCR_DATES - TESTSP | Latest scheduled start (from basic dates) | |
202 | Table/Structure Field | STRUCR_DATES - TPENFR | Earliest scheduled finish (from forecast dates) | |
203 | Table/Structure Field | STRUCR_DATES - TPENSP | Latest scheduled finish (from forecast dates) | |
204 | Table/Structure Field | STRUCR_DATES - TPSTFR | Earliest scheduled start (from forecast dates) | |
205 | Table/Structure Field | STRUCR_DATES - TPSTSP | Latest scheduled start (from forecast dates) | |
206 | Table/Structure Field | STRUCR_DATES - VORLEN | Tentative finish date | |
207 | Table/Structure Field | STRUCR_DATES - VORLST | Tentative start date | |
208 | Table/Structure Field | STRUCR_WORK - EARBEI | Work | |
209 | Table/Structure Field | STRUCR_WORK - IARBEI | Actual work | |
210 | Table/Structure Field | STRUCR_WORK - PARBEI | Forecast work | |
211 | Table/Structure Field | STRUCR_WORK - RARBEI | Remaining work | |
212 | Table/Structure Field | STRUCR_WORK - VARBEI | Tentative work | |
213 | Table/Structure Field | SYST - DYNNR | ABAP System Field: Current Dynpro Number | |
214 | Table/Structure Field | SYST - PFKEY | ABAP System Field: Current GUI Status | |
215 | Table/Structure Field | SYST - SCOLS | ABAP System Field: Number of Columns on Screen | |
216 | Table/Structure Field | SYST - SROWS | ABAP System Field: Number of Screen Rows | |
217 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
218 | Table/Structure Field | SYST - TITLE | ABAP System Field: Title Line Content of Current Dynpro | |
219 | Table/Structure Field | TCN00 - SLWID | Key word ID for user-defined fields | |
220 | Table/Structure Field | TCNDB - AOBKZ | Key: View of relationships | |
221 | Table/Structure Field | TCNDB - INCVG | Selection with network activities for WBS (Project System) | |
222 | Table/Structure Field | VSKOPF - VSGRUPPE | Group for a project version |