Table/Structure Field list used by SAP ABAP Program RCNDATFS (Project Info System: Data Declarations on Filter)
SAP ABAP Program RCNDATFS (Project Info System: Data Declarations on Filter) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  ACTR - ARBPL Work center
2 Table/Structure Field  ACTR - VGTYP Activity or element category
3 Table/Structure Field  AFKO - DISPO MRP controller for the order
4 Table/Structure Field  AFKO - FEVOR Production Supervisor
5 Table/Structure Field  AFKO_INC - DISPO MRP controller for the order
6 Table/Structure Field  AFKO_INC - FEVOR Production Supervisor
7 Table/Structure Field  AFVGD - MLSTN Usage
8 Table/Structure Field  AFVGI - MLSTN Usage
9 Table/Structure Field  CRHD - ARBPL Work center
10 Table/Structure Field  CRHD - OBJID Object ID of the resource
11 Table/Structure Field  CRHD - WERKS Plant
12 Table/Structure Field  CRHH - NAME Name of hierarchy
13 Table/Structure Field  CRHH - WERKS Plant
14 Table/Structure Field  CRID - OBJID Object ID of the resource
15 Table/Structure Field  DFIES - SCRTEXT_L Long Field Label
16 Table/Structure Field  FILTR - ECKENR Basic finish date (relative to today's date)
17 Table/Structure Field  FILTR - ECKSTR Basic start date (relative to today's date)
18 Table/Structure Field  FILTR - FLG_CRIT Indicator: Activity is critical
19 Table/Structure Field  FILTR - FLG_SUBCRT Indicator: Activity is sub-critical
20 Table/Structure Field  FILTR - ISTENR Actual finish date (relative to today's date)
21 Table/Structure Field  FILTR - PROGENR Forecast finish date (relative to today's date)
22 Table/Structure Field  FILTR - PROGSTR Forecast start date (relative to today's date)
23 Table/Structure Field  FILTR - TEENFRR Earliest scheduled finish (basic; relative to today's date)
24 Table/Structure Field  FILTR - TEENSPR Latest scheduled finish (basic; relative to today's date)
25 Table/Structure Field  FILTR - TESTFRR Earliest scheduled start (Basic; relative to today's date)
26 Table/Structure Field  FILTR - TESTSPR Latest scheduled start (basic; relative to today's date)
27 Table/Structure Field  FILTR - TPENFRR Earliest scheduled finish (Fcst; relative to today's date)
28 Table/Structure Field  FILTR - TPENSPR Latest scheduled finish (Fcst; relative to today's date)
29 Table/Structure Field  FILTR - TPSTFRR Earliest scheduled start (Fcst; relative to today's date)
30 Table/Structure Field  FILTR - TPSTSPR Latest scheduled start (Forecast; relative to today's date)
31 Table/Structure Field  FILTR - VORLENR Tentative finish date (relative to today's date)
32 Table/Structure Field  FILTR - VORLSTR Tentative start date (relative to today's date)
33 Table/Structure Field  JESTD - ITX04 Individual status of an object (short form)
34 Table/Structure Field  PROJ - VBUKR Company code for the project
35 Table/Structure Field  PROJ - VERNA Name of responsible person (Project manager)
36 Table/Structure Field  PROJ - VERNR Number of the responsible person (project manager)
37 Table/Structure Field  PROJ2_INC - VBUKR Company code for the project
38 Table/Structure Field  PROJ2_INC - VERNA Name of responsible person (Project manager)
39 Table/Structure Field  PROJ2_INC - VERNR Number of the responsible person (project manager)
40 Table/Structure Field  PROJ_INC - VBUKR Company code for the project
41 Table/Structure Field  PROJ_INC - VERNA Name of responsible person (Project manager)
42 Table/Structure Field  PROJ_INC - VERNR Number of the responsible person (project manager)
43 Table/Structure Field  PRPS - FKOKR Controlling area of responsible cost center
44 Table/Structure Field  PRPS - FKSTL Responsible cost center
45 Table/Structure Field  PRPS - PSPRI Priority
46 Table/Structure Field  PRPS - USR00 1st user field for 20 characters - WBS element-
47 Table/Structure Field  PRPS - USR01 2nd user field 20 digits - WBS element
48 Table/Structure Field  PRPS - USR02 3rd user-defined field 10 digits -WBS element
49 Table/Structure Field  PRPS - USR03 4th user-defined field 10 digits -WBS element
50 Table/Structure Field  PRPS - USR04 1st user-defined field for quantity(length 10,3) WBS element
51 Table/Structure Field  PRPS - USR05 2nd use field for quantity (length 10,3) WBS element
52 Table/Structure Field  PRPS - USR06 1st user field for values (length 10,3) WBS element
53 Table/Structure Field  PRPS - USR07 2nd user field for values (length 10,3) -WBS element
54 Table/Structure Field  PRPS - USR08 1st user field for date -WBS element
55 Table/Structure Field  PRPS - USR09 2nd user field for date -WBS element
56 Table/Structure Field  PRPS - USR10 1st user field for 'Ind. for evaluations' WBS elem.
57 Table/Structure Field  PRPS - USR11 2nd user field for 'Indicator for eval.s' WBS elemnt
58 Table/Structure Field  PRPS2_INC - FKOKR Controlling area of responsible cost center
59 Table/Structure Field  PRPS2_INC - FKSTL Responsible cost center
60 Table/Structure Field  PRPS2_INC - PSPRI Priority
61 Table/Structure Field  PRPS2_INC - USR00 1st user field for 20 characters - WBS element-
62 Table/Structure Field  PRPS2_INC - USR01 2nd user field 20 digits - WBS element
63 Table/Structure Field  PRPS2_INC - USR02 3rd user-defined field 10 digits -WBS element
64 Table/Structure Field  PRPS2_INC - USR03 4th user-defined field 10 digits -WBS element
65 Table/Structure Field  PRPS2_INC - USR04 1st user-defined field for quantity(length 10,3) WBS element
66 Table/Structure Field  PRPS2_INC - USR05 2nd use field for quantity (length 10,3) WBS element
67 Table/Structure Field  PRPS2_INC - USR06 1st user field for values (length 10,3) WBS element
68 Table/Structure Field  PRPS2_INC - USR07 2nd user field for values (length 10,3) -WBS element
69 Table/Structure Field  PRPS2_INC - USR08 1st user field for date -WBS element
70 Table/Structure Field  PRPS2_INC - USR09 2nd user field for date -WBS element
71 Table/Structure Field  PRPS2_INC - USR10 1st user field for 'Ind. for evaluations' WBS elem.
72 Table/Structure Field  PRPS2_INC - USR11 2nd user field for 'Indicator for eval.s' WBS elemnt
73 Table/Structure Field  PRPS_INC - FKOKR Controlling area of responsible cost center
74 Table/Structure Field  PRPS_INC - FKSTL Responsible cost center
75 Table/Structure Field  PRPS_INC - PSPRI Priority
76 Table/Structure Field  PRPS_INC - USR00 1st user field for 20 characters - WBS element-
77 Table/Structure Field  PRPS_INC - USR01 2nd user field 20 digits - WBS element
78 Table/Structure Field  PRPS_INC - USR02 3rd user-defined field 10 digits -WBS element
79 Table/Structure Field  PRPS_INC - USR03 4th user-defined field 10 digits -WBS element
80 Table/Structure Field  PRPS_INC - USR04 1st user-defined field for quantity(length 10,3) WBS element
81 Table/Structure Field  PRPS_INC - USR05 2nd use field for quantity (length 10,3) WBS element
82 Table/Structure Field  PRPS_INC - USR06 1st user field for values (length 10,3) WBS element
83 Table/Structure Field  PRPS_INC - USR07 2nd user field for values (length 10,3) -WBS element
84 Table/Structure Field  PRPS_INC - USR08 1st user field for date -WBS element
85 Table/Structure Field  PRPS_INC - USR09 2nd user field for date -WBS element
86 Table/Structure Field  PRPS_INC - USR10 1st user field for 'Ind. for evaluations' WBS elem.
87 Table/Structure Field  PRPS_INC - USR11 2nd user field for 'Indicator for eval.s' WBS elemnt
88 Table/Structure Field  RC68H - LEVELS Number of levels
89 Table/Structure Field  RCJ_RPSCO_LIS - AUFERLPLAN Current order revenue plan
90 Table/Structure Field  RCJ_RPSCO_LIS - AUFERLPLN2 Order revenue plan (version 2)
91 Table/Structure Field  RCJ_RPSCO_LIS - AUFKSTPLAN Current order cost plan
92 Table/Structure Field  RCJ_RPSCO_LIS - AUFKSTPLN2 Order cost plan (version 2)
93 Table/Structure Field  RCJ_RPSCO_LIS - AUFTRANF Residual order plan
94 Table/Structure Field  RCJ_RPSCO_LIS - BUDGET Budget of a Measure (App. Request Variant Was Replaced)
95 Table/Structure Field  RCJ_RPSCO_LIS - DEBFINPLN Current cash budget, debit side
96 Table/Structure Field  RCJ_RPSCO_LIS - DZHLNG Total debit side payments (down payments and payments)
97 Table/Structure Field  RCJ_RPSCO_LIS - FESTPROBL Fixed price commitment
98 Table/Structure Field  RCJ_RPSCO_LIS - FREIGABE Release
99 Table/Structure Field  RCJ_RPSCO_LIS - ISTERLOESE Actual revenues
100 Table/Structure Field  RCJ_RPSCO_LIS - ISTKOSTEN Actual costs
101 Table/Structure Field  RCJ_RPSCO_LIS - KREDFINPLN Current financial budget, credit side
102 Table/Structure Field  RCJ_RPSCO_LIS - KSTOBLGES Total cost commitment
103 Table/Structure Field  RCJ_RPSCO_LIS - KZHLNG Total credit side payments (down payments and payments)
104 Table/Structure Field  RCJ_RPSCO_LIS - PROERLPLAN Current project revenue plan
105 Table/Structure Field  RCJ_RPSCO_LIS - PROERLPLN2 Project revenue plan (version 2)
106 Table/Structure Field  RCJ_RPSCO_LIS - PROKSTPLAN Current project cost plan
107 Table/Structure Field  RCJ_RPSCO_LIS - PROKSTPLN2 Project cost plan (version 2)
108 Table/Structure Field  RPSCO_LISC - AUFERLPLAN Current order revenue plan
109 Table/Structure Field  RPSCO_LISC - AUFERLPLN2 Order revenue plan (version 2)
110 Table/Structure Field  RPSCO_LISC - AUFKSTPLAN Current order cost plan
111 Table/Structure Field  RPSCO_LISC - AUFKSTPLN2 Order cost plan (version 2)
112 Table/Structure Field  RPSCO_LISC - AUFTRANF Residual order plan
113 Table/Structure Field  RPSCO_LISC - BUDGET Budget of a Measure (App. Request Variant Was Replaced)
114 Table/Structure Field  RPSCO_LISC - DEBFINPLN Current cash budget, debit side
115 Table/Structure Field  RPSCO_LISC - DZHLNG Total debit side payments (down payments and payments)
116 Table/Structure Field  RPSCO_LISC - FESTPROBL Fixed price commitment
117 Table/Structure Field  RPSCO_LISC - FREIGABE Release
118 Table/Structure Field  RPSCO_LISC - ISTERLOESE Actual revenues
119 Table/Structure Field  RPSCO_LISC - ISTKOSTEN Actual costs
120 Table/Structure Field  RPSCO_LISC - KREDFINPLN Current financial budget, credit side
121 Table/Structure Field  RPSCO_LISC - KSTOBLGES Total cost commitment
122 Table/Structure Field  RPSCO_LISC - KZHLNG Total credit side payments (down payments and payments)
123 Table/Structure Field  RPSCO_LISC - PROERLPLAN Current project revenue plan
124 Table/Structure Field  RPSCO_LISC - PROERLPLN2 Project revenue plan (version 2)
125 Table/Structure Field  RPSCO_LISC - PROKSTPLAN Current project cost plan
126 Table/Structure Field  RPSCO_LISC - PROKSTPLN2 Project cost plan (version 2)
127 Table/Structure Field  RS38L - NAME Name of Function Module
128 Table/Structure Field  RSPARAMS - SELNAME ABAP/4: Name of SELECT-OPTION / PARAMETER
129 Table/Structure Field  RVART - VARIANT CHAR14 for SYST
130 Table/Structure Field  STRUCR - ABARBA Percent of completion for work
131 Table/Structure Field  STRUCR - ABARBD Processing % of duration
132 Table/Structure Field  STRUCR - AUFERLPLAN Current order revenue plan
133 Table/Structure Field  STRUCR - AUFERLPLN2 Order revenue plan (version 2)
134 Table/Structure Field  STRUCR - AUFKSTPLAN Current order cost plan
135 Table/Structure Field  STRUCR - AUFKSTPLN2 Order cost plan (version 2)
136 Table/Structure Field  STRUCR - AUFTRANF Residual order plan
137 Table/Structure Field  STRUCR - BUDGET Budget of a Measure (App. Request Variant Was Replaced)
138 Table/Structure Field  STRUCR - DEBFINPLN Current cash budget, debit side
139 Table/Structure Field  STRUCR - DZHLNG Total debit side payments (down payments and payments)
140 Table/Structure Field  STRUCR - EARBEI Work
141 Table/Structure Field  STRUCR - ECKEN Finish date (from basic dates)
142 Table/Structure Field  STRUCR - ECKST Basic start date
143 Table/Structure Field  STRUCR - EDAUER Duration
144 Table/Structure Field  STRUCR - FESTPROBL Fixed price commitment
145 Table/Structure Field  STRUCR - FREIGABE Release
146 Table/Structure Field  STRUCR - FRUEHER Actual start is before earliest scheduled start
147 Table/Structure Field  STRUCR - IARBEI Actual work
148 Table/Structure Field  STRUCR - IDAUER Actual duration
149 Table/Structure Field  STRUCR - ISTEN Actual finish date
150 Table/Structure Field  STRUCR - ISTERLOESE Actual revenues
151 Table/Structure Field  STRUCR - ISTKOSTEN Actual costs
152 Table/Structure Field  STRUCR - ISTST Actual start date
153 Table/Structure Field  STRUCR - KREDFINPLN Current financial budget, credit side
154 Table/Structure Field  STRUCR - KSTOBLGES Total cost commitment
155 Table/Structure Field  STRUCR - KZHLNG Total credit side payments (down payments and payments)
156 Table/Structure Field  STRUCR - PARBEI Forecast work
157 Table/Structure Field  STRUCR - PDAUER Forecast duration
158 Table/Structure Field  STRUCR - PROERLPLAN Current project revenue plan
159 Table/Structure Field  STRUCR - PROERLPLN2 Project revenue plan (version 2)
160 Table/Structure Field  STRUCR - PROGEN Forecast finish date
161 Table/Structure Field  STRUCR - PROGST Forecast start date
162 Table/Structure Field  STRUCR - PROKSTPLAN Current project cost plan
163 Table/Structure Field  STRUCR - PROKSTPLN2 Project cost plan (version 2)
164 Table/Structure Field  STRUCR - RARBEI Remaining work
165 Table/Structure Field  STRUCR - RDAUER Remaining duration
166 Table/Structure Field  STRUCR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
167 Table/Structure Field  STRUCR - TEENFR Earliest scheduled finish (from basic dates)
168 Table/Structure Field  STRUCR - TEENSP Latest scheduled finish (from basic dates)
169 Table/Structure Field  STRUCR - TESTFR Earliest scheduled start (from basic dates)
170 Table/Structure Field  STRUCR - TESTSP Latest scheduled start (from basic dates)
171 Table/Structure Field  STRUCR - TPENFR Earliest scheduled finish (from forecast dates)
172 Table/Structure Field  STRUCR - TPENSP Latest scheduled finish (from forecast dates)
173 Table/Structure Field  STRUCR - TPSTFR Earliest scheduled start (from forecast dates)
174 Table/Structure Field  STRUCR - TPSTSP Latest scheduled start (from forecast dates)
175 Table/Structure Field  STRUCR - VARBEI Tentative work
176 Table/Structure Field  STRUCR - VDAUER Tentative duration
177 Table/Structure Field  STRUCR - VERZUG Duration After Latest Scheduled Finish
178 Table/Structure Field  STRUCR - VORBEI Duration After Earliest Scheduled Start
179 Table/Structure Field  STRUCR - VORLEN Tentative finish date
180 Table/Structure Field  STRUCR - VORLST Tentative start date
181 Table/Structure Field  STRUCR_BEFORE_RPSCO - FRUEHER Actual start is before earliest scheduled start
182 Table/Structure Field  STRUCR_BEFORE_RPSCO - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
183 Table/Structure Field  STRUCR_BEFORE_RPSCO - VERZUG Duration After Latest Scheduled Finish
184 Table/Structure Field  STRUCR_BEFORE_RPSCO - VORBEI Duration After Earliest Scheduled Start
185 Table/Structure Field  STRUCR_BEFORE_USER - ABARBA Percent of completion for work
186 Table/Structure Field  STRUCR_BEFORE_WORK - ABARBD Processing % of duration
187 Table/Structure Field  STRUCR_BEFORE_WORK - EDAUER Duration
188 Table/Structure Field  STRUCR_BEFORE_WORK - IDAUER Actual duration
189 Table/Structure Field  STRUCR_BEFORE_WORK - PDAUER Forecast duration
190 Table/Structure Field  STRUCR_BEFORE_WORK - RDAUER Remaining duration
191 Table/Structure Field  STRUCR_BEFORE_WORK - VDAUER Tentative duration
192 Table/Structure Field  STRUCR_DATES - ECKEN Finish date (from basic dates)
193 Table/Structure Field  STRUCR_DATES - ECKST Basic start date
194 Table/Structure Field  STRUCR_DATES - ISTEN Actual finish date
195 Table/Structure Field  STRUCR_DATES - ISTST Actual start date
196 Table/Structure Field  STRUCR_DATES - PROGEN Forecast finish date
197 Table/Structure Field  STRUCR_DATES - PROGST Forecast start date
198 Table/Structure Field  STRUCR_DATES - TEENFR Earliest scheduled finish (from basic dates)
199 Table/Structure Field  STRUCR_DATES - TEENSP Latest scheduled finish (from basic dates)
200 Table/Structure Field  STRUCR_DATES - TESTFR Earliest scheduled start (from basic dates)
201 Table/Structure Field  STRUCR_DATES - TESTSP Latest scheduled start (from basic dates)
202 Table/Structure Field  STRUCR_DATES - TPENFR Earliest scheduled finish (from forecast dates)
203 Table/Structure Field  STRUCR_DATES - TPENSP Latest scheduled finish (from forecast dates)
204 Table/Structure Field  STRUCR_DATES - TPSTFR Earliest scheduled start (from forecast dates)
205 Table/Structure Field  STRUCR_DATES - TPSTSP Latest scheduled start (from forecast dates)
206 Table/Structure Field  STRUCR_DATES - VORLEN Tentative finish date
207 Table/Structure Field  STRUCR_DATES - VORLST Tentative start date
208 Table/Structure Field  STRUCR_WORK - EARBEI Work
209 Table/Structure Field  STRUCR_WORK - IARBEI Actual work
210 Table/Structure Field  STRUCR_WORK - PARBEI Forecast work
211 Table/Structure Field  STRUCR_WORK - RARBEI Remaining work
212 Table/Structure Field  STRUCR_WORK - VARBEI Tentative work
213 Table/Structure Field  SYST - DYNNR ABAP System Field: Current Dynpro Number
214 Table/Structure Field  SYST - PFKEY ABAP System Field: Current GUI Status
215 Table/Structure Field  SYST - SCOLS ABAP System Field: Number of Columns on Screen
216 Table/Structure Field  SYST - SROWS ABAP System Field: Number of Screen Rows
217 Table/Structure Field  SYST - TABIX ABAP System Field: Row Index of Internal Tables
218 Table/Structure Field  SYST - TITLE ABAP System Field: Title Line Content of Current Dynpro
219 Table/Structure Field  TCN00 - SLWID Key word ID for user-defined fields
220 Table/Structure Field  TCNDB - AOBKZ Key: View of relationships
221 Table/Structure Field  TCNDB - INCVG Selection with network activities for WBS (Project System)
222 Table/Structure Field  VSKOPF - VSGRUPPE Group for a project version