Table/Structure Field list used by SAP ABAP Program LM61DTOP (Data Declarations for Capacity Leveling)
SAP ABAP Program
LM61DTOP (Data Declarations for Capacity Leveling) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AF61Q - ICDN1 | Number of the following screen | ||
| 2 | AM61R - DYNNR | Number of the following screen | ||
| 3 | CYBED_GRU - INDEX | Index to related object (e.g. index to capacity) | ||
| 4 | CYBED_GRU - GRUPPE | Requirements group | ||
| 5 | CYBED_GRU - KOMBI | Combination within a requirements group | ||
| 6 | CYCRHD_TAB - FUNKTION1 | Function to be carried for object "work center" | ||
| 7 | CYCRHD_TAB - INDEX | Index for object "work center" | ||
| 8 | CYCRHD_TAB - MANDT | Client | ||
| 9 | CYCRHD_TAB - OBJID | Object ID of the resource | ||
| 10 | CYCRHD_TAB - OBJTY | Object types of the CIM resource | ||
| 11 | CYPER_BED - GRUPPE | Requirements group | ||
| 12 | CYPER_BED - INDPER_TAB | Index to period table "PER_TAB" | ||
| 13 | CYPER_BED - KOMBI | Combination within a requirements group | ||
| 14 | CYPER_EIN - INDEX_BED | Index referring to pegged requirement | ||
| 15 | CYPER_EIN - STRUKTUR | Structure which have caused the requirement (e.g.KBED) | ||
| 16 | CYPER_EIN - KOMBI | Combination within a requirements group | ||
| 17 | CYPER_EIN - INDPER_TAB | Index to period table "PER_TAB" | ||
| 18 | CYPER_EIN - GRUPPE | Requirements group | ||
| 19 | CYPLAF_TAB - FUNKTION1 | Function to be carried out for object "planned order" | ||
| 20 | CYPLAF_TAB - FUNKTION2 | Function to be carried out for object "planned order" | ||
| 21 | CYPLAF_TAB - MANDT | Client | ||
| 22 | CYPLAF_TAB - PLNUM | Planned order number | ||
| 23 | KAKO - NAME | Capacity name | ||
| 24 | KAKO - KAPAR | Capacity category | ||
| 25 | KAKO - KALID | Factory calendar ID | ||
| 26 | KAKO - MEINS | Base Unit of Measurement for Capacity | ||
| 27 | MDFE - DAT04 | Start date for production | ||
| 28 | MDFE - DAT05 | Finish date for production | ||
| 29 | MDFE - MNG01 | Quantity received or quantity required | ||
| 30 | MDFE - ZEITB | Time | ||
| 31 | MDFE - ZEITV | Time | ||
| 32 | MT61D - MATNR | Material Number | ||
| 33 | MT61D - MRPPP | PPC planning calendar | ||
| 34 | PLAF - GSMNG | Total planned order quantity | ||
| 35 | PLAF - TRMER | Scheduling error | ||
| 36 | PLAF - PSTTR | Order start date in planned order | ||
| 37 | PLAF - PLWRK | Planning Plant | ||
| 38 | PLAF - PLNUM | Planned order number | ||
| 39 | PLAF - PEDTR | Order finish date in the planned order | ||
| 40 | PLAF - MEINS | Base Unit of Measure | ||
| 41 | PLAF - MATNR | Planning material | ||
| 42 | PLAF - KAPFX | Indicator: capacity for planned order dispatched | ||
| 43 | PLAF - AUFFX | Firming indicator for planned order data | ||
| 44 | PLSC - PLSCN | Planning Scenario of Long-Term Planning | ||
| 45 | PLSC - VERSA | Active version of available capacity | ||
| 46 | RC65K - SCHIV | Shift number of the available capacity | ||
| 47 | RC65K - ZEITB | Time | ||
| 48 | RC65K - ZEITV | Time | ||
| 49 | RF61D - RADIO | Checkbox | ||
| 50 | RF61D - UNITB | Base Unit of Measure | ||
| 51 | RF61D - TOTQT | Total order quantity | ||
| 52 | RF61D - STYPE | Scheduling level | ||
| 53 | RF61D - RQTOT | Capacity requirements of the planning period | ||
| 54 | RF61D - RQPLA | Capacity requirements caused by planned order | ||
| 55 | RF61D - RQMAT | Capacity requirements caused by material | ||
| 56 | RF61D - PERIO | Period | ||
| 57 | RF61D - PDATV | Start of planning period | ||
| 58 | RF61D - PDATE | Order finish date | ||
| 59 | RF61D - PDATB | End of planning period | ||
| 60 | RF61D - PCTOT | Capacity utilization of the planning period (as percentage) | ||
| 61 | RF61D - PCMAT | Capacity utilization by mateiral (as percentage) | ||
| 62 | RF61D - OVLOAD_ICON | Carrier field for icons | ||
| 63 | RF61D - ORDTP | Order group abbreviation | ||
| 64 | RF61D - ORDID | Order number | ||
| 65 | RF61D - OLTOT | Total capacity overload check | ||
| 66 | RF61D - OLPLA | Overload check for planned order | ||
| 67 | RF61D - OLMAT | Overload check for material | ||
| 68 | RF61D - KBMAT | Material Number | ||
| 69 | RF61D - DTEXT | Explanatory short text | ||
| 70 | RF61D - CAPRQ | Capacity requirements for the order in the selected period | ||
| 71 | RF61D - AVAIL | Available capacity in a period | ||
| 72 | RF61D - PCPLA | Capacity utilization by planned order (as percentage) | ||
| 73 | RKAKO_A - KAPAR | Capacity category | ||
| 74 | RKAKO_A - NAME | Capacity name | ||
| 75 | RKAKO_A - MEINS | Base Unit of Measurement for Capacity | ||
| 76 | RKAKO_A - KTEXT | Capacity short text | ||
| 77 | RKAKO_A - KALID | Factory calendar ID | ||
| 78 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 79 | SYST - PFKEY | ABAP System Field: Current GUI Status | ||
| 80 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 81 | SYST - TCODE | ABAP System Field: Current Transaction Code | ||
| 82 | SYST - TITLE | ABAP System Field: Title Line Content of Current Dynpro | ||
| 83 | T001W - FABKL | Factory calendar key | ||
| 84 | T001W - WERKS | Plant | ||
| 85 | T437A - KMIMA | Minimum/maximum number of personnel in REM planning table | ||
| 86 | TC26T - TXT | Description of the capacity category | ||
| 87 | TCY30 - PROFILE_ID | Overall profile for capacity leveling |