Table/Structure Field list used by SAP ABAP Program L0C20F00 (L0C20F00)
SAP ABAP Program
L0C20F00 (L0C20F00) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
E071K - OBJNAME | Table Name | |
2 | ![]() |
E071K - TABKEY | Object Name in Object List | |
3 | ![]() |
PLSC - PLSCN | Planning Scenario of Long-Term Planning | |
4 | ![]() |
PLSC - PLSCT | Planning scenario description | |
5 | ![]() |
SYST - LANGU | ABAP System Field: Language Key of Text Environment | |
6 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
7 | ![]() |
T001W - NAME1 | Name | |
8 | ![]() |
T001W - WERKS | Plant | |
9 | ![]() |
T003O - AUART | Order Type | |
10 | ![]() |
T003O - AUTYP | Order category | |
11 | ![]() |
T024F - FEVOR | Production Supervisor | |
12 | ![]() |
T024F - MANDT | Client | |
13 | ![]() |
T024F - SFCPF | Production Scheduling Profile | |
14 | ![]() |
T024F - TXT | Description of production scheduler | |
15 | ![]() |
T024F - WERKS | Plant | |
16 | ![]() |
T482 - ECK_UHRZT | Basic dates with time of day | |
17 | ![]() |
T482 - MANDT | Client | |
18 | ![]() |
T482 - NTERM | Only calculate capacity requirements | |
19 | ![]() |
T482 - RUEKT | Backward scheduling | |
20 | ![]() |
T482 - TAGDT | Schedule from current date | |
21 | ![]() |
T482 - TERMKZ | Scheduling type | |
22 | ![]() |
T482 - VORWT | Forward scheduling | |
23 | ![]() |
T482T - MANDT | Client | |
24 | ![]() |
T482T - SPRAS | Language Key | |
25 | ![]() |
T482T - TERMKZ | Scheduling type | |
26 | ![]() |
T482T - TXT | Description of scheduling type | |
27 | ![]() |
T499P - MANDT | Client | |
28 | ![]() |
T499P - RSTRA | Reduction strategy per operation/activity | |
29 | ![]() |
T499P - SPRAS | Language Key | |
30 | ![]() |
T499P - TXT | Description of reduction strategy | |
31 | ![]() |
T499P - WERKS | Plant | |
32 | ![]() |
T499Q - MANDT | Client | |
33 | ![]() |
T499Q - RSTRA | Reduction strategy per operation/activity | |
34 | ![]() |
T499Q - WERKS | Plant | |
35 | ![]() |
T499R - MANDT | Client | |
36 | ![]() |
T499R - NOTVAL_PP | Entry not valid for operations with time segments | |
37 | ![]() |
T499R - NOTVAL_PS | Entry not valid for operations with a time segment | |
38 | ![]() |
T499R - RDAUN | Reduction in activity duration (%) | |
39 | ![]() |
T499R - REDST | Reduction level | |
40 | ![]() |
T499R - RSPLI | Indicator: Reduction by splitting | |
41 | ![]() |
T499R - RSTRA | Reduction strategy per operation/activity | |
42 | ![]() |
T499R - RTRAN | Indicator: Reduction of move time | |
43 | ![]() |
T499R - RUEBL | Indicator: Reduction by overlapping | |
44 | ![]() |
T499R - RWART | Reduction in queue time (%) | |
45 | ![]() |
T499R - WERKS | Plant | |
46 | ![]() |
TCO43 - CO_PRODPRF | Production Scheduling Profile | |
47 | ![]() |
TCO43 - WERKS | Plant | |
48 | ![]() |
TCO43T - CO_PRODPRF | Production Scheduling Profile | |
49 | ![]() |
TCO43T - PRODPRF_TX | Description of production scheduler profile | |
50 | ![]() |
TCO43T - SPRAS | Language Key | |
51 | ![]() |
TCO43T - WERKS | Plant | |
52 | ![]() |
TCX00 - APLS1 | Selection ID (detailed planning) | |
53 | ![]() |
TCX00 - APLS1_2 | Selection ID for routing (detailed planning, medium term) | |
54 | ![]() |
TCX00 - APLS1_3 | Selection ID for routing (detailed planning, long term) | |
55 | ![]() |
TCX00 - APLS2 | Selection ID (rate-based planning) | |
56 | ![]() |
TCX00 - APLS3 | Selection ID (rough-cut planning) | |
57 | ![]() |
TCX00 - AUFTA | Order type in capacity planning | |
58 | ![]() |
TCX00 - AUFTG | Order group for capacity planning | |
59 | ![]() |
TCX00 - AUF_SHIFT | Indicator: Shift order/network | |
60 | ![]() |
TCX00 - BREAKS | Indicator: Scheduling allowing for breaks | |
61 | ![]() |
TCX00 - CMACT | Assignment Material Staging Operation Segment | |
62 | ![]() |
TCX00 - DADJ1 | Scheduling level for adjusting basic dates | |
63 | ![]() |
TCX00 - DADJ2 | Adjust dates in lead time scheduling | |
64 | ![]() |
TCX00 - DADJ3 | Adjusting dates when dispatching planned orders | |
65 | ![]() |
TCX00 - GROHR | Rough-cut planning horizon | |
66 | ![]() |
TCX00 - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | |
67 | ![]() |
TCX00 - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | |
68 | ![]() |
TCX00 - KAPK1_3 | Create capacity requirements (detailed planning, long term) | |
69 | ![]() |
TCX00 - KAPK2 | Create capacity requirements (rate-based planning) | |
70 | ![]() |
TCX00 - KAPK3 | Create capacity requirements (rough-cut planning) | |
71 | ![]() |
TCX00 - LINE_TERM | Takt time-/rate-based scheduling of planned order | |
72 | ![]() |
TCX00 - MANDT | Client | |
73 | ![]() |
TCX00 - MATFRUEH | Latest date for material staging | |
74 | ![]() |
TCX00 - PHORI | Scheduling horizon (detailed planning) | |
75 | ![]() |
TCX00 - PHORI_2 | Scheduling horizon (detailed planning, medium term) | |
76 | ![]() |
TCX00 - PHORI_3 | Scheduling horizon (detailed planning, long term) | |
77 | ![]() |
TCX00 - PROD_DATES | Scheduling based on production dates | |
78 | ![]() |
TCX00 - PROT_AUTO | Display scheduling log automatically | |
79 | ![]() |
TCX00 - RATHR | Rate-based planning horizon | |
80 | ![]() |
TCX00 - REDST_MAX | Maximum reduction level | |
81 | ![]() |
TCX00 - REDVS_S1 | Red. of floats before and after production (%) | |
82 | ![]() |
TCX00 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
83 | ![]() |
TCX00 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
84 | ![]() |
TCX00 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
85 | ![]() |
TCX00 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
86 | ![]() |
TCX00 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
87 | ![]() |
TCX00 - RED_ART | Reduction type | |
88 | ![]() |
TCX00 - STVERG | Maximum number of days start date can be in the past | |
89 | ![]() |
TCX00 - TERM1 | Lead time scheduling (detailed planning) | |
90 | ![]() |
TCX00 - TERM1_2 | Lead time scheduling (detailed planning, medium term) | |
91 | ![]() |
TCX00 - TERM1_3 | Lead time scheduling (detailed planning, long term) | |
92 | ![]() |
TCX00 - TERM2 | Lead time scheduling (rate-based planning) | |
93 | ![]() |
TCX00 - TERM3 | Lead time scheduling (rough-cut planning) | |
94 | ![]() |
TCX00 - TERMKZ | Scheduling type | |
95 | ![]() |
TCX00 - TERM_AUTO | Indicator: Calculate dates automatically during saving | |
96 | ![]() |
TCX00 - TERM_KPER | Rescheduling in Workforce Planning | |
97 | ![]() |
TCX00 - VAGRP | Production Supervisor | |
98 | ![]() |
TCX00 - WERKS | Plant | |
99 | ![]() |
TCX01 - AUART | Order Type | |
100 | ![]() |
TCX01 - AUF_SHIFT | Indicator: Shift order/network | |
101 | ![]() |
TCX01 - BREAKS | Indicator: Scheduling allowing for breaks | |
102 | ![]() |
TCX01 - ECKTM_UPD | Indicator: Adjust Basic Dates | |
103 | ![]() |
TCX01 - MANDT | Client | |
104 | ![]() |
TCX01 - MATFRUEH | Latest date for material staging | |
105 | ![]() |
TCX01 - PROT_AUTO | Display scheduling log automatically | |
106 | ![]() |
TCX01 - REDST_MAX | Maximum reduction level | |
107 | ![]() |
TCX01 - REDVS_S1 | Red. of floats before and after production (%) | |
108 | ![]() |
TCX01 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
109 | ![]() |
TCX01 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
110 | ![]() |
TCX01 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
111 | ![]() |
TCX01 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
112 | ![]() |
TCX01 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
113 | ![]() |
TCX01 - STVERG | Maximum number of days start date can be in the past | |
114 | ![]() |
TCX01 - TERMKZ | Scheduling type | |
115 | ![]() |
TCX01 - TERM_AUTO | Indicator: Calculate dates automatically during saving | |
116 | ![]() |
TCX01 - VAGRP | Production Supervisor | |
117 | ![]() |
TCX01 - WERKS | Plant | |
118 | ![]() |
TCX0L - APLS1_LTP | Selection ID for routing (long term planning) | |
119 | ![]() |
TCX0L - AUFTA | Order type in capacity planning | |
120 | ![]() |
TCX0L - AUFTG | Order group for capacity planning | |
121 | ![]() |
TCX0L - BREAKS | Indicator: Scheduling allowing for breaks | |
122 | ![]() |
TCX0L - DADJ2 | Adjust dates in lead time scheduling | |
123 | ![]() |
TCX0L - DADJ3 | Adjusting dates when dispatching planned orders | |
124 | ![]() |
TCX0L - KAPK1_LTP | Create capacity requirements (long term planning) | |
125 | ![]() |
TCX0L - MANDT | Client | |
126 | ![]() |
TCX0L - MATFRUEH | Latest date for material staging | |
127 | ![]() |
TCX0L - PLSCN | Planning Scenario of Long-Term Planning | |
128 | ![]() |
TCX0L - PROD_DATES | Scheduling based on production dates | |
129 | ![]() |
TCX0L - REDST_MAX | Maximum reduction level | |
130 | ![]() |
TCX0L - REDVS_S1 | Red. of floats before and after production (%) | |
131 | ![]() |
TCX0L - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
132 | ![]() |
TCX0L - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
133 | ![]() |
TCX0L - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
134 | ![]() |
TCX0L - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
135 | ![]() |
TCX0L - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
136 | ![]() |
TCX0L - SCHED_TYPE | Scheduling level | |
137 | ![]() |
TCX0L - STVERG | Maximum number of days start date can be in the past | |
138 | ![]() |
TCX0L - TERM1_LTP | Lead time scheduling (long term planning) | |
139 | ![]() |
TCX0L - TERMKZ | Scheduling type | |
140 | ![]() |
TCX0L - VAGRP | Production Supervisor | |
141 | ![]() |
TCX0L - WERKS | Plant | |
142 | ![]() |
VIMDESC - DELMDTFLAG | Checkbox | |
143 | ![]() |
VIMDESC - SELECTION | CHAR01 data element for SYST | |
144 | ![]() |
VIMSTATUS - ALR_SORTED | CHAR01 data element for SYST | |
145 | ![]() |
VIMSTATUS - ST_DELETE | CHAR01 data element for SYST | |
146 | ![]() |
VIMSTATUS - UPD_CHECKD | CHAR01 data element for SYST | |
147 | ![]() |
VIMSTATUS - UPD_FLAG | Checkbox | |
148 | ![]() |
V_T024F - FEVOR | Production Supervisor | |
149 | ![]() |
V_T024F - FEVORTXXT | Description of production scheduler | |
150 | ![]() |
V_T024F - MANDT | Client | |
151 | ![]() |
V_T024F - PRODPRF_TX | Description of production scheduler profile | |
152 | ![]() |
V_T024F - SFCPF | Production Scheduling Profile | |
153 | ![]() |
V_T024F - WERKS | Plant | |
154 | ![]() |
V_T482 - ECK_UHRZT | Basic dates with time of day | |
155 | ![]() |
V_T482 - MANDT | Client | |
156 | ![]() |
V_T482 - NTERM | Only calculate capacity requirements | |
157 | ![]() |
V_T482 - RUEKT | Backward scheduling | |
158 | ![]() |
V_T482 - TAGDT | Schedule from current date | |
159 | ![]() |
V_T482 - TERMKZ | Scheduling type | |
160 | ![]() |
V_T482 - TXT | Description of scheduling type | |
161 | ![]() |
V_T482 - VORWT | Forward scheduling | |
162 | ![]() |
V_T482_PI - ECK_UHRZT | Basic dates with time of day | |
163 | ![]() |
V_T482_PI - MANDT | Client | |
164 | ![]() |
V_T482_PI - NTERM | Only calculate capacity requirements | |
165 | ![]() |
V_T482_PI - RUEKT | Backward scheduling | |
166 | ![]() |
V_T482_PI - TAGDT | Schedule from current date | |
167 | ![]() |
V_T482_PI - TERMKZ | Scheduling type | |
168 | ![]() |
V_T482_PI - TXT | Description of scheduling type | |
169 | ![]() |
V_T482_PI - VORWT | Forward scheduling | |
170 | ![]() |
V_T499Q - MANDT | Client | |
171 | ![]() |
V_T499Q - NAME1 | Name | |
172 | ![]() |
V_T499Q - RSTRA | Reduction strategy per operation/activity | |
173 | ![]() |
V_T499Q - TXT | Description of reduction strategy | |
174 | ![]() |
V_T499Q - WERKS | Plant | |
175 | ![]() |
V_T499R - MANDT | Client | |
176 | ![]() |
V_T499R - NAME1 | Name | |
177 | ![]() |
V_T499R - NOTVAL_PP | Entry not valid for operations with time segments | |
178 | ![]() |
V_T499R - NOTVAL_PS | Entry not valid for operations with a time segment | |
179 | ![]() |
V_T499R - RDAUN | Reduction in activity duration (%) | |
180 | ![]() |
V_T499R - REDST | Reduction level | |
181 | ![]() |
V_T499R - RSPLI | Indicator: Reduction by splitting | |
182 | ![]() |
V_T499R - RSTRA | Reduction strategy per operation/activity | |
183 | ![]() |
V_T499R - RTRAN | Indicator: Reduction of move time | |
184 | ![]() |
V_T499R - RUEBL | Indicator: Reduction by overlapping | |
185 | ![]() |
V_T499R - RWART | Reduction in queue time (%) | |
186 | ![]() |
V_T499R - TXT | Description of reduction strategy | |
187 | ![]() |
V_T499R - WERKS | Plant | |
188 | ![]() |
V_TCX00_FAUF - APLS1 | Selection ID (detailed planning) | |
189 | ![]() |
V_TCX00_FAUF - APLS1_2 | Selection ID for routing (detailed planning, medium term) | |
190 | ![]() |
V_TCX00_FAUF - APLS1_3 | Selection ID for routing (detailed planning, long term) | |
191 | ![]() |
V_TCX00_FAUF - APLS2 | Selection ID (rate-based planning) | |
192 | ![]() |
V_TCX00_FAUF - APLS3 | Selection ID (rough-cut planning) | |
193 | ![]() |
V_TCX00_FAUF - AUFTA | Order type in capacity planning | |
194 | ![]() |
V_TCX00_FAUF - AUFTG | Order group for capacity planning | |
195 | ![]() |
V_TCX00_FAUF - AUF_SHIFT | Indicator: Shift order/network | |
196 | ![]() |
V_TCX00_FAUF - BREAKS | Indicator: Scheduling allowing for breaks | |
197 | ![]() |
V_TCX00_FAUF - CMACT | Assignment Material Staging Operation Segment | |
198 | ![]() |
V_TCX00_FAUF - DADJ1 | Scheduling level for adjusting basic dates | |
199 | ![]() |
V_TCX00_FAUF - DADJ2 | Adjust dates in lead time scheduling | |
200 | ![]() |
V_TCX00_FAUF - DADJ3 | Adjusting dates when dispatching planned orders | |
201 | ![]() |
V_TCX00_FAUF - FEVOR_TEXT | Description of production scheduler | |
202 | ![]() |
V_TCX00_FAUF - GROHR | Rough-cut planning horizon | |
203 | ![]() |
V_TCX00_FAUF - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | |
204 | ![]() |
V_TCX00_FAUF - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | |
205 | ![]() |
V_TCX00_FAUF - KAPK1_3 | Create capacity requirements (detailed planning, long term) | |
206 | ![]() |
V_TCX00_FAUF - KAPK2 | Create capacity requirements (rate-based planning) | |
207 | ![]() |
V_TCX00_FAUF - KAPK3 | Create capacity requirements (rough-cut planning) | |
208 | ![]() |
V_TCX00_FAUF - MANDT | Client | |
209 | ![]() |
V_TCX00_FAUF - MATFRUEH | Latest date for material staging | |
210 | ![]() |
V_TCX00_FAUF - PHORI | Scheduling horizon (detailed planning) | |
211 | ![]() |
V_TCX00_FAUF - PHORI_2 | Scheduling horizon (detailed planning, medium term) | |
212 | ![]() |
V_TCX00_FAUF - PHORI_3 | Scheduling horizon (detailed planning, long term) | |
213 | ![]() |
V_TCX00_FAUF - PROD_DATES | Scheduling based on production dates | |
214 | ![]() |
V_TCX00_FAUF - PROT_AUTO | Display scheduling log automatically | |
215 | ![]() |
V_TCX00_FAUF - RATHR | Rate-based planning horizon | |
216 | ![]() |
V_TCX00_FAUF - REDST_MAX | Maximum reduction level | |
217 | ![]() |
V_TCX00_FAUF - REDVS_S1 | Red. of floats before and after production (%) | |
218 | ![]() |
V_TCX00_FAUF - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
219 | ![]() |
V_TCX00_FAUF - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
220 | ![]() |
V_TCX00_FAUF - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
221 | ![]() |
V_TCX00_FAUF - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
222 | ![]() |
V_TCX00_FAUF - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
223 | ![]() |
V_TCX00_FAUF - RED_ART | Reduction type | |
224 | ![]() |
V_TCX00_FAUF - STVERG | Maximum number of days start date can be in the past | |
225 | ![]() |
V_TCX00_FAUF - TERM1 | Lead time scheduling (detailed planning) | |
226 | ![]() |
V_TCX00_FAUF - TERM1_2 | Lead time scheduling (detailed planning, medium term) | |
227 | ![]() |
V_TCX00_FAUF - TERM1_3 | Lead time scheduling (detailed planning, long term) | |
228 | ![]() |
V_TCX00_FAUF - TERM2 | Lead time scheduling (rate-based planning) | |
229 | ![]() |
V_TCX00_FAUF - TERM3 | Lead time scheduling (rough-cut planning) | |
230 | ![]() |
V_TCX00_FAUF - TERMKZ | Scheduling type | |
231 | ![]() |
V_TCX00_FAUF - TERMKZ_TXT | Description of scheduling type | |
232 | ![]() |
V_TCX00_FAUF - TERM_AUTO | Indicator: Calculate dates automatically during saving | |
233 | ![]() |
V_TCX00_FAUF - TERM_KPER | Rescheduling in Workforce Planning | |
234 | ![]() |
V_TCX00_FAUF - VAGRP | Production Supervisor | |
235 | ![]() |
V_TCX00_FAUF - WERKS | Plant | |
236 | ![]() |
V_TCX00_FAUF - WERKS_TEXT | Name | |
237 | ![]() |
V_TCX00_PAUF - APLS1 | Selection ID (detailed planning) | |
238 | ![]() |
V_TCX00_PAUF - APLS1_2 | Selection ID for routing (detailed planning, medium term) | |
239 | ![]() |
V_TCX00_PAUF - APLS1_3 | Selection ID for routing (detailed planning, long term) | |
240 | ![]() |
V_TCX00_PAUF - APLS2 | Selection ID (rate-based planning) | |
241 | ![]() |
V_TCX00_PAUF - APLS3 | Selection ID (rough-cut planning) | |
242 | ![]() |
V_TCX00_PAUF - AUFTA | Order type in capacity planning | |
243 | ![]() |
V_TCX00_PAUF - AUFTG | Order group for capacity planning | |
244 | ![]() |
V_TCX00_PAUF - AUF_SHIFT | Indicator: Shift order/network | |
245 | ![]() |
V_TCX00_PAUF - BREAKS | Indicator: Scheduling allowing for breaks | |
246 | ![]() |
V_TCX00_PAUF - DADJ1 | Scheduling level for adjusting basic dates | |
247 | ![]() |
V_TCX00_PAUF - DADJ2 | Adjust dates in lead time scheduling | |
248 | ![]() |
V_TCX00_PAUF - DADJ3 | Adjusting dates when dispatching planned orders | |
249 | ![]() |
V_TCX00_PAUF - FEVOR_TEXT | Description of production scheduler | |
250 | ![]() |
V_TCX00_PAUF - GROHR | Rough-cut planning horizon | |
251 | ![]() |
V_TCX00_PAUF - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | |
252 | ![]() |
V_TCX00_PAUF - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | |
253 | ![]() |
V_TCX00_PAUF - KAPK1_3 | Create capacity requirements (detailed planning, long term) | |
254 | ![]() |
V_TCX00_PAUF - KAPK2 | Create capacity requirements (rate-based planning) | |
255 | ![]() |
V_TCX00_PAUF - KAPK3 | Create capacity requirements (rough-cut planning) | |
256 | ![]() |
V_TCX00_PAUF - LINE_TERM | Takt time-/rate-based scheduling of planned order | |
257 | ![]() |
V_TCX00_PAUF - MANDT | Client | |
258 | ![]() |
V_TCX00_PAUF - MATFRUEH | Latest date for material staging | |
259 | ![]() |
V_TCX00_PAUF - PHORI | Scheduling horizon (detailed planning) | |
260 | ![]() |
V_TCX00_PAUF - PHORI_2 | Scheduling horizon (detailed planning, medium term) | |
261 | ![]() |
V_TCX00_PAUF - PHORI_3 | Scheduling horizon (detailed planning, long term) | |
262 | ![]() |
V_TCX00_PAUF - PROD_DATES | Scheduling based on production dates | |
263 | ![]() |
V_TCX00_PAUF - PROT_AUTO | Display scheduling log automatically | |
264 | ![]() |
V_TCX00_PAUF - RATHR | Rate-based planning horizon | |
265 | ![]() |
V_TCX00_PAUF - REDST_MAX | Maximum reduction level | |
266 | ![]() |
V_TCX00_PAUF - REDVS_S1 | Red. of floats before and after production (%) | |
267 | ![]() |
V_TCX00_PAUF - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
268 | ![]() |
V_TCX00_PAUF - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
269 | ![]() |
V_TCX00_PAUF - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
270 | ![]() |
V_TCX00_PAUF - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
271 | ![]() |
V_TCX00_PAUF - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
272 | ![]() |
V_TCX00_PAUF - RED_ART | Reduction type | |
273 | ![]() |
V_TCX00_PAUF - STVERG | Maximum number of days start date can be in the past | |
274 | ![]() |
V_TCX00_PAUF - TERM1 | Lead time scheduling (detailed planning) | |
275 | ![]() |
V_TCX00_PAUF - TERM1_2 | Lead time scheduling (detailed planning, medium term) | |
276 | ![]() |
V_TCX00_PAUF - TERM1_3 | Lead time scheduling (detailed planning, long term) | |
277 | ![]() |
V_TCX00_PAUF - TERM2 | Lead time scheduling (rate-based planning) | |
278 | ![]() |
V_TCX00_PAUF - TERM3 | Lead time scheduling (rough-cut planning) | |
279 | ![]() |
V_TCX00_PAUF - TERMKZ | Scheduling type | |
280 | ![]() |
V_TCX00_PAUF - TERMKZ_TXT | Description of scheduling type | |
281 | ![]() |
V_TCX00_PAUF - TERM_AUTO | Indicator: Calculate dates automatically during saving | |
282 | ![]() |
V_TCX00_PAUF - VAGRP | Production Supervisor | |
283 | ![]() |
V_TCX00_PAUF - WERKS | Plant | |
284 | ![]() |
V_TCX00_PAUF - WERKS_TEXT | Name | |
285 | ![]() |
V_TCX00_SOP - APLS1 | Selection ID (detailed planning) | |
286 | ![]() |
V_TCX00_SOP - APLS1_2 | Selection ID for routing (detailed planning, medium term) | |
287 | ![]() |
V_TCX00_SOP - APLS1_3 | Selection ID for routing (detailed planning, long term) | |
288 | ![]() |
V_TCX00_SOP - APLS2 | Selection ID (rate-based planning) | |
289 | ![]() |
V_TCX00_SOP - APLS3 | Selection ID (rough-cut planning) | |
290 | ![]() |
V_TCX00_SOP - AUFTA | Order type in capacity planning | |
291 | ![]() |
V_TCX00_SOP - AUFTG | Order group for capacity planning | |
292 | ![]() |
V_TCX00_SOP - AUF_SHIFT | Indicator: Shift order/network | |
293 | ![]() |
V_TCX00_SOP - BREAKS | Indicator: Scheduling allowing for breaks | |
294 | ![]() |
V_TCX00_SOP - DADJ1 | Scheduling level for adjusting basic dates | |
295 | ![]() |
V_TCX00_SOP - DADJ2 | Adjust dates in lead time scheduling | |
296 | ![]() |
V_TCX00_SOP - DADJ3 | Adjusting dates when dispatching planned orders | |
297 | ![]() |
V_TCX00_SOP - FEVOR_TEXT | Description of production scheduler | |
298 | ![]() |
V_TCX00_SOP - GROHR | Rough-cut planning horizon | |
299 | ![]() |
V_TCX00_SOP - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | |
300 | ![]() |
V_TCX00_SOP - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | |
301 | ![]() |
V_TCX00_SOP - KAPK1_3 | Create capacity requirements (detailed planning, long term) | |
302 | ![]() |
V_TCX00_SOP - KAPK2 | Create capacity requirements (rate-based planning) | |
303 | ![]() |
V_TCX00_SOP - KAPK3 | Create capacity requirements (rough-cut planning) | |
304 | ![]() |
V_TCX00_SOP - MANDT | Client | |
305 | ![]() |
V_TCX00_SOP - MATFRUEH | Latest date for material staging | |
306 | ![]() |
V_TCX00_SOP - PHORI | Scheduling horizon (detailed planning) | |
307 | ![]() |
V_TCX00_SOP - PHORI_2 | Scheduling horizon (detailed planning, medium term) | |
308 | ![]() |
V_TCX00_SOP - PHORI_3 | Scheduling horizon (detailed planning, long term) | |
309 | ![]() |
V_TCX00_SOP - PROD_DATES | Scheduling based on production dates | |
310 | ![]() |
V_TCX00_SOP - PROT_AUTO | Display scheduling log automatically | |
311 | ![]() |
V_TCX00_SOP - RATHR | Rate-based planning horizon | |
312 | ![]() |
V_TCX00_SOP - REDST_MAX | Maximum reduction level | |
313 | ![]() |
V_TCX00_SOP - REDVS_S1 | Red. of floats before and after production (%) | |
314 | ![]() |
V_TCX00_SOP - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
315 | ![]() |
V_TCX00_SOP - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
316 | ![]() |
V_TCX00_SOP - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
317 | ![]() |
V_TCX00_SOP - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
318 | ![]() |
V_TCX00_SOP - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
319 | ![]() |
V_TCX00_SOP - STVERG | Maximum number of days start date can be in the past | |
320 | ![]() |
V_TCX00_SOP - TERM1 | Lead time scheduling (detailed planning) | |
321 | ![]() |
V_TCX00_SOP - TERM1_2 | Lead time scheduling (detailed planning, medium term) | |
322 | ![]() |
V_TCX00_SOP - TERM1_3 | Lead time scheduling (detailed planning, long term) | |
323 | ![]() |
V_TCX00_SOP - TERM2 | Lead time scheduling (rate-based planning) | |
324 | ![]() |
V_TCX00_SOP - TERM3 | Lead time scheduling (rough-cut planning) | |
325 | ![]() |
V_TCX00_SOP - TERMKZ | Scheduling type | |
326 | ![]() |
V_TCX00_SOP - TERMKZ_TXT | Description of scheduling type | |
327 | ![]() |
V_TCX00_SOP - TERM_AUTO | Indicator: Calculate dates automatically during saving | |
328 | ![]() |
V_TCX00_SOP - VAGRP | Production Supervisor | |
329 | ![]() |
V_TCX00_SOP - WERKS | Plant | |
330 | ![]() |
V_TCX00_SOP - WERKS_TEXT | Name | |
331 | ![]() |
V_TCX01 - AUART | Order Type | |
332 | ![]() |
V_TCX01 - AUF_SHIFT | Indicator: Shift order/network | |
333 | ![]() |
V_TCX01 - AUTYP | Order category | |
334 | ![]() |
V_TCX01 - BREAKS | Indicator: Scheduling allowing for breaks | |
335 | ![]() |
V_TCX01 - ECKTM_UPD | Indicator: Adjust Basic Dates | |
336 | ![]() |
V_TCX01 - MANDT | Client | |
337 | ![]() |
V_TCX01 - MATFRUEH | Latest date for material staging | |
338 | ![]() |
V_TCX01 - NAME1 | Name | |
339 | ![]() |
V_TCX01 - PROT_AUTO | Display scheduling log automatically | |
340 | ![]() |
V_TCX01 - REDST_MAX | Maximum reduction level | |
341 | ![]() |
V_TCX01 - REDVS_S1 | Red. of floats before and after production (%) | |
342 | ![]() |
V_TCX01 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
343 | ![]() |
V_TCX01 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
344 | ![]() |
V_TCX01 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
345 | ![]() |
V_TCX01 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
346 | ![]() |
V_TCX01 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
347 | ![]() |
V_TCX01 - STVERG | Maximum number of days start date can be in the past | |
348 | ![]() |
V_TCX01 - TERMKZ | Scheduling type | |
349 | ![]() |
V_TCX01 - TERM_AUTO | Indicator: Calculate dates automatically during saving | |
350 | ![]() |
V_TCX01 - TXT | Description of scheduling type | |
351 | ![]() |
V_TCX01 - VAGRP | Production Supervisor | |
352 | ![]() |
V_TCX01 - WERKS | Plant | |
353 | ![]() |
V_TCX0L - APLS1_LTP | Selection ID for routing (long term planning) | |
354 | ![]() |
V_TCX0L - AUFTA | Order type in capacity planning | |
355 | ![]() |
V_TCX0L - AUFTG | Order group for capacity planning | |
356 | ![]() |
V_TCX0L - BREAKS | Indicator: Scheduling allowing for breaks | |
357 | ![]() |
V_TCX0L - DADJ2 | Adjust dates in lead time scheduling | |
358 | ![]() |
V_TCX0L - DADJ3 | Adjusting dates when dispatching planned orders | |
359 | ![]() |
V_TCX0L - FEVORTXT | Description of production scheduler | |
360 | ![]() |
V_TCX0L - KAPK1_LTP | Create capacity requirements (long term planning) | |
361 | ![]() |
V_TCX0L - MANDT | Client | |
362 | ![]() |
V_TCX0L - MATFRUEH | Latest date for material staging | |
363 | ![]() |
V_TCX0L - NAME1 | Name | |
364 | ![]() |
V_TCX0L - PLSCN | Planning Scenario of Long-Term Planning | |
365 | ![]() |
V_TCX0L - PLSCTXT | Planning scenario description | |
366 | ![]() |
V_TCX0L - PROD_DATES | Scheduling based on production dates | |
367 | ![]() |
V_TCX0L - REDST_MAX | Maximum reduction level | |
368 | ![]() |
V_TCX0L - REDVS_S1 | Red. of floats before and after production (%) | |
369 | ![]() |
V_TCX0L - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
370 | ![]() |
V_TCX0L - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
371 | ![]() |
V_TCX0L - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
372 | ![]() |
V_TCX0L - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
373 | ![]() |
V_TCX0L - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | |
374 | ![]() |
V_TCX0L - SCHED_TYPE | Scheduling level | |
375 | ![]() |
V_TCX0L - STVERG | Maximum number of days start date can be in the past | |
376 | ![]() |
V_TCX0L - TERM1_LTP | Lead time scheduling (long term planning) | |
377 | ![]() |
V_TCX0L - TERMKZ | Scheduling type | |
378 | ![]() |
V_TCX0L - TERMTXT | Description of scheduling type | |
379 | ![]() |
V_TCX0L - VAGRP | Production Supervisor | |
380 | ![]() |
V_TCX0L - WERKS | Plant |