Table/Structure Field list used by SAP ABAP Program L0C20F00 (L0C20F00)
SAP ABAP Program
L0C20F00 (L0C20F00) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | E071K - OBJNAME | Table Name | ||
| 2 | E071K - TABKEY | Object Name in Object List | ||
| 3 | PLSC - PLSCN | Planning Scenario of Long-Term Planning | ||
| 4 | PLSC - PLSCT | Planning scenario description | ||
| 5 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 6 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 7 | T001W - NAME1 | Name | ||
| 8 | T001W - WERKS | Plant | ||
| 9 | T003O - AUART | Order Type | ||
| 10 | T003O - AUTYP | Order category | ||
| 11 | T024F - FEVOR | Production Supervisor | ||
| 12 | T024F - MANDT | Client | ||
| 13 | T024F - SFCPF | Production Scheduling Profile | ||
| 14 | T024F - TXT | Description of production scheduler | ||
| 15 | T024F - WERKS | Plant | ||
| 16 | T482 - ECK_UHRZT | Basic dates with time of day | ||
| 17 | T482 - MANDT | Client | ||
| 18 | T482 - NTERM | Only calculate capacity requirements | ||
| 19 | T482 - RUEKT | Backward scheduling | ||
| 20 | T482 - TAGDT | Schedule from current date | ||
| 21 | T482 - TERMKZ | Scheduling type | ||
| 22 | T482 - VORWT | Forward scheduling | ||
| 23 | T482T - MANDT | Client | ||
| 24 | T482T - SPRAS | Language Key | ||
| 25 | T482T - TERMKZ | Scheduling type | ||
| 26 | T482T - TXT | Description of scheduling type | ||
| 27 | T499P - MANDT | Client | ||
| 28 | T499P - RSTRA | Reduction strategy per operation/activity | ||
| 29 | T499P - SPRAS | Language Key | ||
| 30 | T499P - TXT | Description of reduction strategy | ||
| 31 | T499P - WERKS | Plant | ||
| 32 | T499Q - MANDT | Client | ||
| 33 | T499Q - RSTRA | Reduction strategy per operation/activity | ||
| 34 | T499Q - WERKS | Plant | ||
| 35 | T499R - MANDT | Client | ||
| 36 | T499R - NOTVAL_PP | Entry not valid for operations with time segments | ||
| 37 | T499R - NOTVAL_PS | Entry not valid for operations with a time segment | ||
| 38 | T499R - RDAUN | Reduction in activity duration (%) | ||
| 39 | T499R - REDST | Reduction level | ||
| 40 | T499R - RSPLI | Indicator: Reduction by splitting | ||
| 41 | T499R - RSTRA | Reduction strategy per operation/activity | ||
| 42 | T499R - RTRAN | Indicator: Reduction of move time | ||
| 43 | T499R - RUEBL | Indicator: Reduction by overlapping | ||
| 44 | T499R - RWART | Reduction in queue time (%) | ||
| 45 | T499R - WERKS | Plant | ||
| 46 | TCO43 - CO_PRODPRF | Production Scheduling Profile | ||
| 47 | TCO43 - WERKS | Plant | ||
| 48 | TCO43T - CO_PRODPRF | Production Scheduling Profile | ||
| 49 | TCO43T - PRODPRF_TX | Description of production scheduler profile | ||
| 50 | TCO43T - SPRAS | Language Key | ||
| 51 | TCO43T - WERKS | Plant | ||
| 52 | TCX00 - APLS1 | Selection ID (detailed planning) | ||
| 53 | TCX00 - APLS1_2 | Selection ID for routing (detailed planning, medium term) | ||
| 54 | TCX00 - APLS1_3 | Selection ID for routing (detailed planning, long term) | ||
| 55 | TCX00 - APLS2 | Selection ID (rate-based planning) | ||
| 56 | TCX00 - APLS3 | Selection ID (rough-cut planning) | ||
| 57 | TCX00 - AUFTA | Order type in capacity planning | ||
| 58 | TCX00 - AUFTG | Order group for capacity planning | ||
| 59 | TCX00 - AUF_SHIFT | Indicator: Shift order/network | ||
| 60 | TCX00 - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 61 | TCX00 - CMACT | Assignment Material Staging Operation Segment | ||
| 62 | TCX00 - DADJ1 | Scheduling level for adjusting basic dates | ||
| 63 | TCX00 - DADJ2 | Adjust dates in lead time scheduling | ||
| 64 | TCX00 - DADJ3 | Adjusting dates when dispatching planned orders | ||
| 65 | TCX00 - GROHR | Rough-cut planning horizon | ||
| 66 | TCX00 - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | ||
| 67 | TCX00 - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | ||
| 68 | TCX00 - KAPK1_3 | Create capacity requirements (detailed planning, long term) | ||
| 69 | TCX00 - KAPK2 | Create capacity requirements (rate-based planning) | ||
| 70 | TCX00 - KAPK3 | Create capacity requirements (rough-cut planning) | ||
| 71 | TCX00 - LINE_TERM | Takt time-/rate-based scheduling of planned order | ||
| 72 | TCX00 - MANDT | Client | ||
| 73 | TCX00 - MATFRUEH | Latest date for material staging | ||
| 74 | TCX00 - PHORI | Scheduling horizon (detailed planning) | ||
| 75 | TCX00 - PHORI_2 | Scheduling horizon (detailed planning, medium term) | ||
| 76 | TCX00 - PHORI_3 | Scheduling horizon (detailed planning, long term) | ||
| 77 | TCX00 - PROD_DATES | Scheduling based on production dates | ||
| 78 | TCX00 - PROT_AUTO | Display scheduling log automatically | ||
| 79 | TCX00 - RATHR | Rate-based planning horizon | ||
| 80 | TCX00 - REDST_MAX | Maximum reduction level | ||
| 81 | TCX00 - REDVS_S1 | Red. of floats before and after production (%) | ||
| 82 | TCX00 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 83 | TCX00 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 84 | TCX00 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 85 | TCX00 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 86 | TCX00 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 87 | TCX00 - RED_ART | Reduction type | ||
| 88 | TCX00 - STVERG | Maximum number of days start date can be in the past | ||
| 89 | TCX00 - TERM1 | Lead time scheduling (detailed planning) | ||
| 90 | TCX00 - TERM1_2 | Lead time scheduling (detailed planning, medium term) | ||
| 91 | TCX00 - TERM1_3 | Lead time scheduling (detailed planning, long term) | ||
| 92 | TCX00 - TERM2 | Lead time scheduling (rate-based planning) | ||
| 93 | TCX00 - TERM3 | Lead time scheduling (rough-cut planning) | ||
| 94 | TCX00 - TERMKZ | Scheduling type | ||
| 95 | TCX00 - TERM_AUTO | Indicator: Calculate dates automatically during saving | ||
| 96 | TCX00 - TERM_KPER | Rescheduling in Workforce Planning | ||
| 97 | TCX00 - VAGRP | Production Supervisor | ||
| 98 | TCX00 - WERKS | Plant | ||
| 99 | TCX01 - AUART | Order Type | ||
| 100 | TCX01 - AUF_SHIFT | Indicator: Shift order/network | ||
| 101 | TCX01 - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 102 | TCX01 - ECKTM_UPD | Indicator: Adjust Basic Dates | ||
| 103 | TCX01 - MANDT | Client | ||
| 104 | TCX01 - MATFRUEH | Latest date for material staging | ||
| 105 | TCX01 - PROT_AUTO | Display scheduling log automatically | ||
| 106 | TCX01 - REDST_MAX | Maximum reduction level | ||
| 107 | TCX01 - REDVS_S1 | Red. of floats before and after production (%) | ||
| 108 | TCX01 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 109 | TCX01 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 110 | TCX01 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 111 | TCX01 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 112 | TCX01 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 113 | TCX01 - STVERG | Maximum number of days start date can be in the past | ||
| 114 | TCX01 - TERMKZ | Scheduling type | ||
| 115 | TCX01 - TERM_AUTO | Indicator: Calculate dates automatically during saving | ||
| 116 | TCX01 - VAGRP | Production Supervisor | ||
| 117 | TCX01 - WERKS | Plant | ||
| 118 | TCX0L - APLS1_LTP | Selection ID for routing (long term planning) | ||
| 119 | TCX0L - AUFTA | Order type in capacity planning | ||
| 120 | TCX0L - AUFTG | Order group for capacity planning | ||
| 121 | TCX0L - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 122 | TCX0L - DADJ2 | Adjust dates in lead time scheduling | ||
| 123 | TCX0L - DADJ3 | Adjusting dates when dispatching planned orders | ||
| 124 | TCX0L - KAPK1_LTP | Create capacity requirements (long term planning) | ||
| 125 | TCX0L - MANDT | Client | ||
| 126 | TCX0L - MATFRUEH | Latest date for material staging | ||
| 127 | TCX0L - PLSCN | Planning Scenario of Long-Term Planning | ||
| 128 | TCX0L - PROD_DATES | Scheduling based on production dates | ||
| 129 | TCX0L - REDST_MAX | Maximum reduction level | ||
| 130 | TCX0L - REDVS_S1 | Red. of floats before and after production (%) | ||
| 131 | TCX0L - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 132 | TCX0L - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 133 | TCX0L - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 134 | TCX0L - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 135 | TCX0L - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 136 | TCX0L - SCHED_TYPE | Scheduling level | ||
| 137 | TCX0L - STVERG | Maximum number of days start date can be in the past | ||
| 138 | TCX0L - TERM1_LTP | Lead time scheduling (long term planning) | ||
| 139 | TCX0L - TERMKZ | Scheduling type | ||
| 140 | TCX0L - VAGRP | Production Supervisor | ||
| 141 | TCX0L - WERKS | Plant | ||
| 142 | VIMDESC - DELMDTFLAG | Checkbox | ||
| 143 | VIMDESC - SELECTION | CHAR01 data element for SYST | ||
| 144 | VIMSTATUS - ALR_SORTED | CHAR01 data element for SYST | ||
| 145 | VIMSTATUS - ST_DELETE | CHAR01 data element for SYST | ||
| 146 | VIMSTATUS - UPD_CHECKD | CHAR01 data element for SYST | ||
| 147 | VIMSTATUS - UPD_FLAG | Checkbox | ||
| 148 | V_T024F - FEVOR | Production Supervisor | ||
| 149 | V_T024F - FEVORTXXT | Description of production scheduler | ||
| 150 | V_T024F - MANDT | Client | ||
| 151 | V_T024F - PRODPRF_TX | Description of production scheduler profile | ||
| 152 | V_T024F - SFCPF | Production Scheduling Profile | ||
| 153 | V_T024F - WERKS | Plant | ||
| 154 | V_T482 - ECK_UHRZT | Basic dates with time of day | ||
| 155 | V_T482 - MANDT | Client | ||
| 156 | V_T482 - NTERM | Only calculate capacity requirements | ||
| 157 | V_T482 - RUEKT | Backward scheduling | ||
| 158 | V_T482 - TAGDT | Schedule from current date | ||
| 159 | V_T482 - TERMKZ | Scheduling type | ||
| 160 | V_T482 - TXT | Description of scheduling type | ||
| 161 | V_T482 - VORWT | Forward scheduling | ||
| 162 | V_T482_PI - ECK_UHRZT | Basic dates with time of day | ||
| 163 | V_T482_PI - MANDT | Client | ||
| 164 | V_T482_PI - NTERM | Only calculate capacity requirements | ||
| 165 | V_T482_PI - RUEKT | Backward scheduling | ||
| 166 | V_T482_PI - TAGDT | Schedule from current date | ||
| 167 | V_T482_PI - TERMKZ | Scheduling type | ||
| 168 | V_T482_PI - TXT | Description of scheduling type | ||
| 169 | V_T482_PI - VORWT | Forward scheduling | ||
| 170 | V_T499Q - MANDT | Client | ||
| 171 | V_T499Q - NAME1 | Name | ||
| 172 | V_T499Q - RSTRA | Reduction strategy per operation/activity | ||
| 173 | V_T499Q - TXT | Description of reduction strategy | ||
| 174 | V_T499Q - WERKS | Plant | ||
| 175 | V_T499R - MANDT | Client | ||
| 176 | V_T499R - NAME1 | Name | ||
| 177 | V_T499R - NOTVAL_PP | Entry not valid for operations with time segments | ||
| 178 | V_T499R - NOTVAL_PS | Entry not valid for operations with a time segment | ||
| 179 | V_T499R - RDAUN | Reduction in activity duration (%) | ||
| 180 | V_T499R - REDST | Reduction level | ||
| 181 | V_T499R - RSPLI | Indicator: Reduction by splitting | ||
| 182 | V_T499R - RSTRA | Reduction strategy per operation/activity | ||
| 183 | V_T499R - RTRAN | Indicator: Reduction of move time | ||
| 184 | V_T499R - RUEBL | Indicator: Reduction by overlapping | ||
| 185 | V_T499R - RWART | Reduction in queue time (%) | ||
| 186 | V_T499R - TXT | Description of reduction strategy | ||
| 187 | V_T499R - WERKS | Plant | ||
| 188 | V_TCX00_FAUF - APLS1 | Selection ID (detailed planning) | ||
| 189 | V_TCX00_FAUF - APLS1_2 | Selection ID for routing (detailed planning, medium term) | ||
| 190 | V_TCX00_FAUF - APLS1_3 | Selection ID for routing (detailed planning, long term) | ||
| 191 | V_TCX00_FAUF - APLS2 | Selection ID (rate-based planning) | ||
| 192 | V_TCX00_FAUF - APLS3 | Selection ID (rough-cut planning) | ||
| 193 | V_TCX00_FAUF - AUFTA | Order type in capacity planning | ||
| 194 | V_TCX00_FAUF - AUFTG | Order group for capacity planning | ||
| 195 | V_TCX00_FAUF - AUF_SHIFT | Indicator: Shift order/network | ||
| 196 | V_TCX00_FAUF - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 197 | V_TCX00_FAUF - CMACT | Assignment Material Staging Operation Segment | ||
| 198 | V_TCX00_FAUF - DADJ1 | Scheduling level for adjusting basic dates | ||
| 199 | V_TCX00_FAUF - DADJ2 | Adjust dates in lead time scheduling | ||
| 200 | V_TCX00_FAUF - DADJ3 | Adjusting dates when dispatching planned orders | ||
| 201 | V_TCX00_FAUF - FEVOR_TEXT | Description of production scheduler | ||
| 202 | V_TCX00_FAUF - GROHR | Rough-cut planning horizon | ||
| 203 | V_TCX00_FAUF - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | ||
| 204 | V_TCX00_FAUF - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | ||
| 205 | V_TCX00_FAUF - KAPK1_3 | Create capacity requirements (detailed planning, long term) | ||
| 206 | V_TCX00_FAUF - KAPK2 | Create capacity requirements (rate-based planning) | ||
| 207 | V_TCX00_FAUF - KAPK3 | Create capacity requirements (rough-cut planning) | ||
| 208 | V_TCX00_FAUF - MANDT | Client | ||
| 209 | V_TCX00_FAUF - MATFRUEH | Latest date for material staging | ||
| 210 | V_TCX00_FAUF - PHORI | Scheduling horizon (detailed planning) | ||
| 211 | V_TCX00_FAUF - PHORI_2 | Scheduling horizon (detailed planning, medium term) | ||
| 212 | V_TCX00_FAUF - PHORI_3 | Scheduling horizon (detailed planning, long term) | ||
| 213 | V_TCX00_FAUF - PROD_DATES | Scheduling based on production dates | ||
| 214 | V_TCX00_FAUF - PROT_AUTO | Display scheduling log automatically | ||
| 215 | V_TCX00_FAUF - RATHR | Rate-based planning horizon | ||
| 216 | V_TCX00_FAUF - REDST_MAX | Maximum reduction level | ||
| 217 | V_TCX00_FAUF - REDVS_S1 | Red. of floats before and after production (%) | ||
| 218 | V_TCX00_FAUF - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 219 | V_TCX00_FAUF - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 220 | V_TCX00_FAUF - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 221 | V_TCX00_FAUF - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 222 | V_TCX00_FAUF - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 223 | V_TCX00_FAUF - RED_ART | Reduction type | ||
| 224 | V_TCX00_FAUF - STVERG | Maximum number of days start date can be in the past | ||
| 225 | V_TCX00_FAUF - TERM1 | Lead time scheduling (detailed planning) | ||
| 226 | V_TCX00_FAUF - TERM1_2 | Lead time scheduling (detailed planning, medium term) | ||
| 227 | V_TCX00_FAUF - TERM1_3 | Lead time scheduling (detailed planning, long term) | ||
| 228 | V_TCX00_FAUF - TERM2 | Lead time scheduling (rate-based planning) | ||
| 229 | V_TCX00_FAUF - TERM3 | Lead time scheduling (rough-cut planning) | ||
| 230 | V_TCX00_FAUF - TERMKZ | Scheduling type | ||
| 231 | V_TCX00_FAUF - TERMKZ_TXT | Description of scheduling type | ||
| 232 | V_TCX00_FAUF - TERM_AUTO | Indicator: Calculate dates automatically during saving | ||
| 233 | V_TCX00_FAUF - TERM_KPER | Rescheduling in Workforce Planning | ||
| 234 | V_TCX00_FAUF - VAGRP | Production Supervisor | ||
| 235 | V_TCX00_FAUF - WERKS | Plant | ||
| 236 | V_TCX00_FAUF - WERKS_TEXT | Name | ||
| 237 | V_TCX00_PAUF - APLS1 | Selection ID (detailed planning) | ||
| 238 | V_TCX00_PAUF - APLS1_2 | Selection ID for routing (detailed planning, medium term) | ||
| 239 | V_TCX00_PAUF - APLS1_3 | Selection ID for routing (detailed planning, long term) | ||
| 240 | V_TCX00_PAUF - APLS2 | Selection ID (rate-based planning) | ||
| 241 | V_TCX00_PAUF - APLS3 | Selection ID (rough-cut planning) | ||
| 242 | V_TCX00_PAUF - AUFTA | Order type in capacity planning | ||
| 243 | V_TCX00_PAUF - AUFTG | Order group for capacity planning | ||
| 244 | V_TCX00_PAUF - AUF_SHIFT | Indicator: Shift order/network | ||
| 245 | V_TCX00_PAUF - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 246 | V_TCX00_PAUF - DADJ1 | Scheduling level for adjusting basic dates | ||
| 247 | V_TCX00_PAUF - DADJ2 | Adjust dates in lead time scheduling | ||
| 248 | V_TCX00_PAUF - DADJ3 | Adjusting dates when dispatching planned orders | ||
| 249 | V_TCX00_PAUF - FEVOR_TEXT | Description of production scheduler | ||
| 250 | V_TCX00_PAUF - GROHR | Rough-cut planning horizon | ||
| 251 | V_TCX00_PAUF - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | ||
| 252 | V_TCX00_PAUF - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | ||
| 253 | V_TCX00_PAUF - KAPK1_3 | Create capacity requirements (detailed planning, long term) | ||
| 254 | V_TCX00_PAUF - KAPK2 | Create capacity requirements (rate-based planning) | ||
| 255 | V_TCX00_PAUF - KAPK3 | Create capacity requirements (rough-cut planning) | ||
| 256 | V_TCX00_PAUF - LINE_TERM | Takt time-/rate-based scheduling of planned order | ||
| 257 | V_TCX00_PAUF - MANDT | Client | ||
| 258 | V_TCX00_PAUF - MATFRUEH | Latest date for material staging | ||
| 259 | V_TCX00_PAUF - PHORI | Scheduling horizon (detailed planning) | ||
| 260 | V_TCX00_PAUF - PHORI_2 | Scheduling horizon (detailed planning, medium term) | ||
| 261 | V_TCX00_PAUF - PHORI_3 | Scheduling horizon (detailed planning, long term) | ||
| 262 | V_TCX00_PAUF - PROD_DATES | Scheduling based on production dates | ||
| 263 | V_TCX00_PAUF - PROT_AUTO | Display scheduling log automatically | ||
| 264 | V_TCX00_PAUF - RATHR | Rate-based planning horizon | ||
| 265 | V_TCX00_PAUF - REDST_MAX | Maximum reduction level | ||
| 266 | V_TCX00_PAUF - REDVS_S1 | Red. of floats before and after production (%) | ||
| 267 | V_TCX00_PAUF - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 268 | V_TCX00_PAUF - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 269 | V_TCX00_PAUF - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 270 | V_TCX00_PAUF - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 271 | V_TCX00_PAUF - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 272 | V_TCX00_PAUF - RED_ART | Reduction type | ||
| 273 | V_TCX00_PAUF - STVERG | Maximum number of days start date can be in the past | ||
| 274 | V_TCX00_PAUF - TERM1 | Lead time scheduling (detailed planning) | ||
| 275 | V_TCX00_PAUF - TERM1_2 | Lead time scheduling (detailed planning, medium term) | ||
| 276 | V_TCX00_PAUF - TERM1_3 | Lead time scheduling (detailed planning, long term) | ||
| 277 | V_TCX00_PAUF - TERM2 | Lead time scheduling (rate-based planning) | ||
| 278 | V_TCX00_PAUF - TERM3 | Lead time scheduling (rough-cut planning) | ||
| 279 | V_TCX00_PAUF - TERMKZ | Scheduling type | ||
| 280 | V_TCX00_PAUF - TERMKZ_TXT | Description of scheduling type | ||
| 281 | V_TCX00_PAUF - TERM_AUTO | Indicator: Calculate dates automatically during saving | ||
| 282 | V_TCX00_PAUF - VAGRP | Production Supervisor | ||
| 283 | V_TCX00_PAUF - WERKS | Plant | ||
| 284 | V_TCX00_PAUF - WERKS_TEXT | Name | ||
| 285 | V_TCX00_SOP - APLS1 | Selection ID (detailed planning) | ||
| 286 | V_TCX00_SOP - APLS1_2 | Selection ID for routing (detailed planning, medium term) | ||
| 287 | V_TCX00_SOP - APLS1_3 | Selection ID for routing (detailed planning, long term) | ||
| 288 | V_TCX00_SOP - APLS2 | Selection ID (rate-based planning) | ||
| 289 | V_TCX00_SOP - APLS3 | Selection ID (rough-cut planning) | ||
| 290 | V_TCX00_SOP - AUFTA | Order type in capacity planning | ||
| 291 | V_TCX00_SOP - AUFTG | Order group for capacity planning | ||
| 292 | V_TCX00_SOP - AUF_SHIFT | Indicator: Shift order/network | ||
| 293 | V_TCX00_SOP - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 294 | V_TCX00_SOP - DADJ1 | Scheduling level for adjusting basic dates | ||
| 295 | V_TCX00_SOP - DADJ2 | Adjust dates in lead time scheduling | ||
| 296 | V_TCX00_SOP - DADJ3 | Adjusting dates when dispatching planned orders | ||
| 297 | V_TCX00_SOP - FEVOR_TEXT | Description of production scheduler | ||
| 298 | V_TCX00_SOP - GROHR | Rough-cut planning horizon | ||
| 299 | V_TCX00_SOP - KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | ||
| 300 | V_TCX00_SOP - KAPK1_2 | Create capacity requirements (detailed planning,medium term) | ||
| 301 | V_TCX00_SOP - KAPK1_3 | Create capacity requirements (detailed planning, long term) | ||
| 302 | V_TCX00_SOP - KAPK2 | Create capacity requirements (rate-based planning) | ||
| 303 | V_TCX00_SOP - KAPK3 | Create capacity requirements (rough-cut planning) | ||
| 304 | V_TCX00_SOP - MANDT | Client | ||
| 305 | V_TCX00_SOP - MATFRUEH | Latest date for material staging | ||
| 306 | V_TCX00_SOP - PHORI | Scheduling horizon (detailed planning) | ||
| 307 | V_TCX00_SOP - PHORI_2 | Scheduling horizon (detailed planning, medium term) | ||
| 308 | V_TCX00_SOP - PHORI_3 | Scheduling horizon (detailed planning, long term) | ||
| 309 | V_TCX00_SOP - PROD_DATES | Scheduling based on production dates | ||
| 310 | V_TCX00_SOP - PROT_AUTO | Display scheduling log automatically | ||
| 311 | V_TCX00_SOP - RATHR | Rate-based planning horizon | ||
| 312 | V_TCX00_SOP - REDST_MAX | Maximum reduction level | ||
| 313 | V_TCX00_SOP - REDVS_S1 | Red. of floats before and after production (%) | ||
| 314 | V_TCX00_SOP - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 315 | V_TCX00_SOP - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 316 | V_TCX00_SOP - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 317 | V_TCX00_SOP - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 318 | V_TCX00_SOP - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 319 | V_TCX00_SOP - STVERG | Maximum number of days start date can be in the past | ||
| 320 | V_TCX00_SOP - TERM1 | Lead time scheduling (detailed planning) | ||
| 321 | V_TCX00_SOP - TERM1_2 | Lead time scheduling (detailed planning, medium term) | ||
| 322 | V_TCX00_SOP - TERM1_3 | Lead time scheduling (detailed planning, long term) | ||
| 323 | V_TCX00_SOP - TERM2 | Lead time scheduling (rate-based planning) | ||
| 324 | V_TCX00_SOP - TERM3 | Lead time scheduling (rough-cut planning) | ||
| 325 | V_TCX00_SOP - TERMKZ | Scheduling type | ||
| 326 | V_TCX00_SOP - TERMKZ_TXT | Description of scheduling type | ||
| 327 | V_TCX00_SOP - TERM_AUTO | Indicator: Calculate dates automatically during saving | ||
| 328 | V_TCX00_SOP - VAGRP | Production Supervisor | ||
| 329 | V_TCX00_SOP - WERKS | Plant | ||
| 330 | V_TCX00_SOP - WERKS_TEXT | Name | ||
| 331 | V_TCX01 - AUART | Order Type | ||
| 332 | V_TCX01 - AUF_SHIFT | Indicator: Shift order/network | ||
| 333 | V_TCX01 - AUTYP | Order category | ||
| 334 | V_TCX01 - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 335 | V_TCX01 - ECKTM_UPD | Indicator: Adjust Basic Dates | ||
| 336 | V_TCX01 - MANDT | Client | ||
| 337 | V_TCX01 - MATFRUEH | Latest date for material staging | ||
| 338 | V_TCX01 - NAME1 | Name | ||
| 339 | V_TCX01 - PROT_AUTO | Display scheduling log automatically | ||
| 340 | V_TCX01 - REDST_MAX | Maximum reduction level | ||
| 341 | V_TCX01 - REDVS_S1 | Red. of floats before and after production (%) | ||
| 342 | V_TCX01 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 343 | V_TCX01 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 344 | V_TCX01 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 345 | V_TCX01 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 346 | V_TCX01 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 347 | V_TCX01 - STVERG | Maximum number of days start date can be in the past | ||
| 348 | V_TCX01 - TERMKZ | Scheduling type | ||
| 349 | V_TCX01 - TERM_AUTO | Indicator: Calculate dates automatically during saving | ||
| 350 | V_TCX01 - TXT | Description of scheduling type | ||
| 351 | V_TCX01 - VAGRP | Production Supervisor | ||
| 352 | V_TCX01 - WERKS | Plant | ||
| 353 | V_TCX0L - APLS1_LTP | Selection ID for routing (long term planning) | ||
| 354 | V_TCX0L - AUFTA | Order type in capacity planning | ||
| 355 | V_TCX0L - AUFTG | Order group for capacity planning | ||
| 356 | V_TCX0L - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 357 | V_TCX0L - DADJ2 | Adjust dates in lead time scheduling | ||
| 358 | V_TCX0L - DADJ3 | Adjusting dates when dispatching planned orders | ||
| 359 | V_TCX0L - FEVORTXT | Description of production scheduler | ||
| 360 | V_TCX0L - KAPK1_LTP | Create capacity requirements (long term planning) | ||
| 361 | V_TCX0L - MANDT | Client | ||
| 362 | V_TCX0L - MATFRUEH | Latest date for material staging | ||
| 363 | V_TCX0L - NAME1 | Name | ||
| 364 | V_TCX0L - PLSCN | Planning Scenario of Long-Term Planning | ||
| 365 | V_TCX0L - PLSCTXT | Planning scenario description | ||
| 366 | V_TCX0L - PROD_DATES | Scheduling based on production dates | ||
| 367 | V_TCX0L - REDST_MAX | Maximum reduction level | ||
| 368 | V_TCX0L - REDVS_S1 | Red. of floats before and after production (%) | ||
| 369 | V_TCX0L - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 370 | V_TCX0L - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 371 | V_TCX0L - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 372 | V_TCX0L - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 373 | V_TCX0L - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | ||
| 374 | V_TCX0L - SCHED_TYPE | Scheduling level | ||
| 375 | V_TCX0L - STVERG | Maximum number of days start date can be in the past | ||
| 376 | V_TCX0L - TERM1_LTP | Lead time scheduling (long term planning) | ||
| 377 | V_TCX0L - TERMKZ | Scheduling type | ||
| 378 | V_TCX0L - TERMTXT | Description of scheduling type | ||
| 379 | V_TCX0L - VAGRP | Production Supervisor | ||
| 380 | V_TCX0L - WERKS | Plant |