Message Number list used by SAP ABAP Class /MRSS/CL_SGE_APPLICATION (Scheduling Engine Application.)
SAP ABAP Class
/MRSS/CL_SGE_APPLICATION (Scheduling Engine Application.) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /MRSS/OPT - 000 | Optimization completed successfully | ||
| 2 | /MRSS/OPT - 001 | Optimization terminated with errors; check log | ||
| 3 | /MRSS/OPT - 003 | Cannot read data; check log(s) | ||
| 4 | /MRSS/OPT - 004 | Optimization completed with warnings; check log | ||
| 5 | /MRSS/OPT - 017 | Creation of assignments or time allocations failed; check the log | ||
| 6 | /MRSS/OPT - 028 | Identification of optimized assignments concluded | ||
| 7 | /MRSS/OPT - 029 | Start creation of assignments in the MRS system | ||
| 8 | /MRSS/OPT - 030 | Error while creating the assignments | ||
| 9 | /MRSS/OPT - 067 | Start optimization in SIMULATION mode = &1 | ||
| 10 | /MRSS/OPT - 100 | Optimization - Determine objects involved from MRS Engine | ||
| 11 | /MRSS/OPT - 108 | Optimization - prepare assignments | ||
| 12 | /MRSS/OPT - 109 | Optimization - create assignments | ||
| 13 | /MRSS/OPT - 110 | Optimization - adjust breaks | ||
| 14 | /MRSS/OPT - 111 | Optimization - execute changes | ||
| 15 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 16 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 17 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 18 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 19 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 20 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 21 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 22 | /MRSS/SGE - 017 | Start time must be earlier than end time | ||
| 23 | /MRSS/SGE - 018 | Resource &1 is not a personnel resource | ||
| 24 | /MRSS/SGE - 026 | Start date &1 is earlier than the start date &2 of the planning period | ||
| 25 | /MRSS/SGE - 026 | Start date &1 is earlier than the start date &2 of the planning period | ||
| 26 | /MRSS/SGE - 027 | End date &1 is later than the end date of the planning period, &2 | ||
| 27 | /MRSS/SGE - 027 | End date &1 is later than the end date of the planning period, &2 | ||
| 28 | /MRSS/SGE - 047 | Planning board was saved successfully | ||
| 29 | /MRSS/SGE - 048 | Planning board was saved and updated successfully | ||
| 30 | /MRSS/SGE - 049 | Error while saving; reset the planning board | ||
| 31 | /MRSS/SGE - 058 | Data was not changed | ||
| 32 | /MRSS/SGE - 058 | Data was not changed | ||
| 33 | /MRSS/SGE - 058 | Data was not changed | ||
| 34 | /MRSS/SGE - 058 | Data was not changed | ||
| 35 | /MRSS/SGE - 058 | Data was not changed | ||
| 36 | /MRSS/SGE - 058 | Data was not changed | ||
| 37 | /MRSS/SGE - 058 | Data was not changed | ||
| 38 | /MRSS/SGE - 067 | Time allocation type is missing | ||
| 39 | /MRSS/SGE - 070 | Links are inactive in the planning board profile | ||
| 40 | /MRSS/SGE - 077 | Duration of time allocation must be greater than 0 | ||
| 41 | /MRSS/SGE - 078 | Automatic assignment creation of demand &1 failed | ||
| 42 | /MRSS/SGE - 133 | Start of time stamp cannot be after end of time stamp | ||
| 43 | /MRSS/SGE - 202 | Assignment &1 was changed by user &2 | ||
| 44 | /MRSS/SGE - 203 | Assignment &1 was deleted previously | ||
| 45 | /MRSS/SGE - 213 | Start and end dates must be in the planning period between &1 and &2 | ||
| 46 | /MRSS/SGE - 213 | Start and end dates must be in the planning period between &1 and &2 | ||
| 47 | /MRSS/SGE - 235 | Error: external check class for demand type &1 | ||
| 48 | /MRSS/SGE - 235 | Error: external check class for demand type &1 | ||
| 49 | /MRSS/SGE - 255 | Demand &1 is indicated as no longer changeable | ||
| 50 | /MRSS/SGE - 274 | Start date &1 is earlier than the start date &2 of the planning period | ||
| 51 | /MRSS/SGE - 275 | End date &1 is later than the end date of the planning period, &2 | ||
| 52 | /MRSS/SGE - 276 | Start and end dates must be in the planning period between &1 and &2 | ||
| 53 | /MRSS/SGE - 315 | Cannot assign tool to selected demand | ||
| 54 | /MRSS/SGE - 316 | Cannot assign tool to a technically completed order | ||
| 55 | /MRSS/SGE - 317 | Tool &1 is not relevant to resource planning | ||
| 56 | /MRSS/SGE - 329 | Specified on-call type is incorrect | ||
| 57 | /MRSS/SGE - 332 | Cannot change time allocations from HR | ||
| 58 | /MRSS/SGE - 335 | Cannot save since HR transfer for &1 is in process | ||
| 59 | /MRSS/SGE - 335 | Cannot save since HR transfer for &1 is in process | ||
| 60 | /MRSS/SGE - 360 | You can create a time allocation of type &1 only after you save | ||
| 61 | /MRSS/SGE - 361 | Time allocation of type &1 cannot be changed or deleted | ||
| 62 | /MRSS/SGE - 373 | Cannot create alternative working time; enter a subtype | ||
| 63 | /MRSS/SGE - 374 | Subtype &1 is not planning-relevant for resource &2 | ||
| 64 | /MRSS/SGE - 375 | Cannot create alternative working time; enter a daily work schedule | ||
| 65 | /MRSS/SGE - 376 | Daily work schedule &1, variant &2 is not valid for resource &3 | ||
| 66 | /MRSS/SGE - 380 | Error during HR backward integration | ||
| 67 | /MRSS/SGE - 383 | Alternative working time must be defined as full-day | ||
| 68 | /MRSS/SGE - 384 | You can create/delete alternative working times only after you have saved | ||
| 69 | /MRSS/SGE - 385 | Time allocation type &1 is not intended for resource &2 | ||
| 70 | /MRSS/SGE - 386 | Cannot delete alt. working time; "Can Be Deleted" indicator not selected | ||
| 71 | /MRSS/SGE - 389 | Alternative working time for resource &1 deleted successfully | ||
| 72 | /MRSS/SGE - 401 | Scheduling demand &1 did not result in scheduling changes | ||
| 73 | /MRSS/SGE - 412 | Additional customer attribute for the team is invalid | ||
| 74 | /MRSS/SGE - 416 | Assignment &1 does not permit concrete or stretched planning | ||
| 75 | /MRSS/SGE - 421 | Start date &1 is earlier than start date &2 of team for resource &3 &4 | ||
| 76 | /MRSS/SGE - 422 | End date &1 is later than the end date &2 of the team for resource &3 &4 | ||
| 77 | /MRSS/SGE - 423 | Start and end date must be in the period btw &1 and &2 for resource &3 &4 | ||
| 78 | /MRSS/SGE - 425 | Resource &1 &2 must be within team validity between &3 and &4 | ||
| 79 | /MRSS/SGE - 426 | Start time is after the end time for resource &1 | ||
| 80 | /MRSS/SGE - 427 | Enter valid times for resource &1 &2 | ||
| 81 | /MRSS/SGE - 428 | Start date &1 of resource &2 is before start date &3 of PLB horizon | ||
| 82 | /MRSS/SGE - 429 | End date &1 of resource &2 is after end date &3 of PLB horizon | ||
| 83 | /MRSS/SGE - 430 | There is more than one team manager in a given period | ||
| 84 | /MRSS/SGE - 431 | Resource &1 already exists in the team in the period specified | ||
| 85 | /MRSS/SGE - 432 | No team manager exists between &1 and &2 in the team validity specified | ||
| 86 | /MRSS/SGE - 433 | Start date is after end date for team &3 | ||
| 87 | /MRSS/SGE - 434 | Enter valid start and end times for team &1 | ||
| 88 | /MRSS/SGE - 437 | Start and end date is falling in the past | ||
| 89 | /MRSS/SGE - 439 | Breaks cannot be moved beyond the permitted intervals &1 - &2 | ||
| 90 | /MRSS/SGE - 444 | Backward integration of the demand duration is deactivated; cannot split | ||
| 91 | /MRSS/SGE - 446 | Planning period was recalculated from demand dates | ||
| 92 | /MRSS/SGE - 448 | Save your changes before displaying or printing documents | ||
| 93 | /MRSS/SGE - 448 | Save your changes before displaying or printing documents | ||
| 94 | /MRSS/SGE - 458 | /MRSS/SGE-458 | ||
| 95 | /MRSS/SGE - 462 | Assignment &1 not created; conflicts during assignment follows demand | ||
| 96 | /MRSS/SGE - 463 | Assignment &1 deleted; conflicts during assignment follows demand | ||
| 97 | /MRSS/SGE - 465 | Assignment is created/updated based on demand dates; assign. follows dem. | ||
| 98 | /MRSS/SGE - 466 | Not all single demands in the complex demand &1 could be shifted | ||
| 99 | /MRSS/SGE - 467 | Demand &1 has relationships that cannot be handled | ||
| 100 | /MRSS/SGE - 469 | Original start and end dates of demand &1 are not within planning period | ||
| 101 | /MRSS/SGE - 486 | Single demands with multiple FS relationships exist in selected demand &1 | ||
| 102 | /MRSS/SGE - 519 | Demand & is bundled; scheduling cannot be done | ||
| 103 | /MRSS/SGE - 530 | Assignments cannot be aligned; assignment simulation failed | ||
| 104 | /MRSS/SGE - 531 | Assignments cannot be aligned; splits are not allowed for alignment | ||
| 105 | /MRSS/SGE - 532 | Assignments cannot be aligned; parallel assignments exist | ||
| 106 | /MRSS/SGE - 534 | Assignments cannot be aligned; assignment lies in non-availability | ||
| 107 | /MRSS/SGE - 535 | Assignments cannot be aligned; assignment lies outside demand dates | ||
| 108 | /MRSS/SGE - 547 | Demand &1 was not shifted; work center capacity is not exceeded | ||
| 109 | /MRSS/SGE - 547 | Demand &1 was not shifted; work center capacity is not exceeded | ||
| 110 | /MRSS/SGE - 548 | Slots could not be found for demand &1; not enough capacity left | ||
| 111 | /MRSS/SGE - 548 | Slots could not be found for demand &1; not enough capacity left | ||
| 112 | /MRSS/SGE - 550 | Demand is not relevant for planning | ||
| 113 | /MRSS/SGE - 571 | Selected demand &1 is not relevant for this action | ||
| 114 | /MRSS/SGE - 619 | Automatic Scheduling of Multiday Assignments was executed; check the log | ||
| 115 | /MRSS/SGE - 646 | Error occurred during automatic assignment execution; check the log | ||
| 116 | /MRSS/SGE - 647 | Error during assignment creation | ||
| 117 | /MRSS/SGE - 648 | Error during assignment deletion | ||
| 118 | /MRSS/SGE - 655 | Relationship type was changed from &1 to &2 | ||
| 119 | /MRSS/SGE - 656 | You have not maintained an offset unit for the relationship | ||
| 120 | /MRSS/SGE - 657 | Cannot create a relationship to the same demand; select different demands | ||
| 121 | /MRSS/SGE - 658 | Cannot create or modify relationship; contact your system administrator | ||
| 122 | /MRSS/SGE - 659 | You cannot create hierarchical and simultaneous relationships | ||
| 123 | /MRSS/SGE - 660 | You cannot modify relationships for orders that are already completed | ||
| 124 | /MRSS/SGE - 661 | All demands in a relationship must be of the same type | ||
| 125 | /MRSS/SGE - 662 | You can only create relationships for PM/CS orders and PS networks | ||
| 126 | /MRSS/SGE - 663 | Successor demand is already involved in another relationship | ||
| 127 | /MRSS/SGE - 664 | Cannot create relationship in order to avoid cyclic dependency | ||
| 128 | /MRSS/SGE - 665 | You cannot delete the only implicit relationship in the demand | ||
| 129 | /MRSS/SGE - 667 | Relationship offset was updated | ||
| 130 | /MRSS/SGE - 668 | No changes were made to the existing relationship | ||
| 131 | /MRSS/SGE - 669 | Relationship was deleted | ||
| 132 | /MRSS/SGE - 670 | Relationships were deleted | ||
| 133 | /MRSS/SGE - 738 | No requirements profile is assigned to demand &1 | ||
| 134 | /MRSS/SGE - 739 | No partners exist for the demand | ||
| 135 | /MRSS/SGE - 740 | No qualified resources found | ||
| 136 | /MRSS/SGE - 741 | No resources found for resource planning node | ||
| 137 | /MRSS/SGE - 742 | Enter explicit resource planning nodes | ||
| 138 | /MRSS/SGE - 743 | Enter an ID for the preselection | ||
| 139 | /MRSS/SGE - 768 | No technical object exists for GUID &1 | ||
| 140 | /MRSS/SGE - 893 | Time allocation data has been changed | ||
| 141 | /MRSS/SGE - 901 | Links are not allowed for external resources | ||
| 142 | /MRSS/SGE - 904 | Resource is in frozen period; cannot plan between &1 and &2 | ||
| 143 | /MRSS/SGU - 008 | Intelligent shifting allowed only for concrete assignments | ||
| 144 | /MRSS/SGU - 085 | Time allocation &1 does not exist | ||
| 145 | /MRSS/SGU - 234 | No team manager exists for the team |