SAP ABAP Table VPEG_TASS (Change Document Structure; Generated by RSSCD000)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-AD-GPD (Application Component) Pegging, Grouping, and Distribution
⤷ GPD (Package) Grouping, Pegging and Distribution
⤷ IS-AD-GPD (Application Component) Pegging, Grouping, and Distribution
⤷ GPD (Package) Grouping, Pegging and Distribution
Basic Data
Table Category | INTTAB | Structure |
Structure | VPEG_TASS | Table Relationship Diagram |
Short Description | Change Document Structure; Generated by RSSCD000 |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | .INCLUDE | 0 | 0 | Pegging: Assignment Replenishment Element to WBS Elements | |||||
2 | MANDT | MANDT | MANDT | CLNT | 3 | 0 | Client | * | |
3 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
4 | MATNR | MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
5 | GRPNR | GRPSPNR | PS_POSNR | NUMC | 8 | 0 | Grouping WBS element | * | |
6 | REPOBJ | REPOBJ | PGOBJNR | CHAR | 22 | 0 | Object Number Replenishment Element | * | |
7 | ASS_PSPNR | PEG_ASS_PSPNR | PS_POSNR | NUMC | 8 | 0 | Assigned WBS Element | * | |
8 | INSTK | PEG_INSTK | PEG_INSTK | CHAR | 1 | 0 | Assigned Quantity is in Stock | ||
9 | BRK_OBJNR | PEG_BRKOBJNR | PEG_OBJNR | CHAR | 22 | 0 | Object Number for Breakpoint | * | |
10 | TOPDAT | TOPDAT | DATUM | DATS | 8 | 0 | Requirements Date for Causing Requirement | ||
11 | ASQTY | ASQTY | MENG13 | QUAN | 13 | 3 | Allocated Quantity | ||
12 | XSSQTY | XSSQTY | MENG13 | QUAN | 13 | 3 | Assigned Surplus Quantity | ||
13 | SCPQTY | SCPQTY | MENG13 | QUAN | 13 | 3 | Assigned Scrap Quantity | ||
14 | LQTY | LQTY | MENG13V | QUAN | 13 | 3 | Assigned, Missing Quantity | ||
15 | MEINS | MEINS | MEINS | UNIT | 3 | 0 | Base Unit of Measure | * | |
16 | GAMNG | PEG_GAMNG | MENG13 | QUAN | 13 | 3 | Total Order Quantity | ||
17 | EXCESS | PEG_EXCESS | PEG_EXCESS | CHAR | 1 | 0 | Assignment of Surplus | ||
18 | SCRAP | PEG_SCRAP | PEG_SCRAP | CHAR | 1 | 0 | Assignment of Scrap | ||
19 | LOST | PEG_LOST | PEG_LOST | CHAR | 1 | 0 | Assignment of Stock Differences | ||
20 | RESDT | PEG_RESDT | DATUM | DATS | 8 | 0 | Withdrawal data from MRP-WBS element stock | ||
21 | LOEVM | LOEVM | XFELD | CHAR | 1 | 0 | Deletion Indicator | ||
22 | CPUDT | CO_CPUDT | DATUM | DATS | 8 | 0 | Date Document Was Created | ||
23 | TIMESTMP | RKE_HZSTMP | RKE_TSTMP | DEC | 16 | 0 | Time created (Greenwich Meantime) | ||
24 | .INCLUDE | 0 | 0 | ||||||
25 | .INCLUDE | 0 | 0 | Structures for generating change document update programs | |||||
26 | KZ | CDCHNGIND | CDCHNGIND | CHAR | 1 | 0 | Change type (U, I, E, D) |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |