SAP ABAP Table SCBP_PROLIS (Problem List for external planning)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LO-SCI-POI (Application Component) Production Optimization Interface (POI)
     CBP (Package) PP-CBP: Constraint-based Planning
Basic Data
Table Category INTTAB    Structure 
Structure SCBP_PROLIS   Table Relationship Diagram
Short Description Problem List for external planning    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 PROBCAT CBP_PROBCAT CBP_PROBCAT NUMC 3   0   Problem category *
2 PLRLNCNT CBP_PLRLNCNT NUMC10 NUMC 10   0   Line counter for planning attribute report  
3 ARBPL ARBPL ARBPL CHAR 8   0   Work center  
4 WERKS WERKS_D WERKS CHAR 4   0   Plant *
5 MATNR MATNR MATNR CHAR 18   0   Material Number *
6 DATU DATUM DATUM DATS 8   0   Date  
7 .INCLUDE       0   0   Period definition for CBP-SOP  
8 PERID PERID CHAR8 CHAR 8   0   Period: day, week, month, posting period as rep. internally  
9 PERKZ PERKZ PERKZ CHAR 1   0   Period indicator  
10 PERIV PERIV PERIV CHAR 2   0   Fiscal Year Variant *
11 ERTAG ERTAG DATUM DATS 8   0   First day of the period to which the values refer  
12 LETAG LETAG DATUM DATS 8   0   Last day of the period to which the values refer  
13 ATAGE ATAGE ATAGE INT2 5   0   Workdays  
14 MATNR_EXTERNAL MGV_MATNR_EXTERNAL MATNR_EXT CHAR 40   0   Material Number  
15 MATNR_GUID MGV_MATNR_GUID MATNR_EGUID CHAR 32   0   External GUID for MATNR Field  
16 MATNR_VERSION MGV_MATNR_VERSION MATNR_VERS CHAR 10   0   Version Number for MATNR Field  
History
Last changed by/on SAP  20130529 
SAP Release Created in