SAP ABAP Message Class MA (Sales and Operations Planning)
Basic Data
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MCP2 (Package) R/3 application development: Sales & Operations Planning
Attributes
Message class MA
Short Description Sales and Operations Planning  
Changed On 20110908 
Last Changed At 171532 
Messages
# Message Message Short Text Documentation status Authorization check
1 001 Function code & not defined here  
2 002 Info structure & has no fields  
3 003 Info structure & does not exist or is not active  
4 004 Info structure & lacks the necessary structure  
5 005 Version & has not yet been created  
6 006 Version & already exists  
7 007 Internal error reading info structure &  
8 008 Period indicator & is not valid - try & or &  
9 009 Posting periods cannot be planned with other periods  
10 010 You do not have the necessary authorizations  
11 011 Caution: actual data will be planned  
12 012 Info structure & is blocked for version &  
13 013 System error trying to block info structure &  
14 014 Fiscal year variant & not maintained in the system  
15 015 Table T009B for fiscal year variant & is not correctly maintained. Space: object requires documentation
16 016 Planning type & not yet defined  
17 017 Characteristic definition screen has not been defined  
18 018 Maximum number of lines/columns reached - scrolling not possible  
19 019 Line deleted or not copied (criterion has initial value)  
20 020 No assignment has been made  
21 021 No target key figure has been selected  
22 022 Not possible to convert from & to & - & will be set  
23 023 Error during copying process  
24 024 Key entry already exists  
25 025 Period indicator & is invalid (use T, W, M, or P)  
26 026 No key figure assignments have yet been made  
27 027 Target info structure for assignment not consistent w. current structure  
28 028 Not possible to change unit to "blank"  
29 029 Source info structure for assignment not consistent w. current structure  
30 030 Enter characteristic values without gaps  
31 031 Enter one or more characteristic values  
32 032 Error computing distribution series  
33 033 Enter ONE key figure  
34 034 Assignment & does not exist  
35 035 At least one characteristic values combination must be planned  
36 036 Target and source info structures may not be the same  
37 037 Choose a "To" period that is smaller than the "From" period  
38 038 Desired number of periods not consistent with data  
39 039 Period starts before planning starts  
40 040 Line deleted or not copied (it exists already)  
41 041 Source info structure can be used only for consistent planning  
42 042 Specify an assignment key  
43 043 System error unblocking product group & plant &  
44 044 Collision occurred when trying to block  
45 045 System error trying to block product group & in plant &  
46 046 PG/material & in plant & blocked by user &  
47 047 If info structure &, version & cannot be maintained  
48 048 Enter an operation or delete value &  
49 049 Enter a date or delete value &  
50 050 Copying method not available in standard or as user method  
51 051 Plan saved under version number &  
52 052 This combination of characteristics is currently locked  
53 053 System error during locking attempt  
54 054 Characteristic value combination: &  
55 055 Enter a unit of measurement that has been defined in Customizing  
56 056 Only enter units that are maintained in the system  
57 057 Not possible to copy with copying method &  
58 058 &: the cursor must be positioned on a line  
59 059 Define a unit of measure  
60 060 Define a currency  
61 061 & has members - deletion not possible  
62 062 Choose one model  
63 063 Unit will be set to &  
64 064 Perform the forecast  
65 065 Forecast starts before planning starts  
66 066 Choose one model selection procedure  
67 067 Historical values overlap with forecast period  
68 068 Exponent 10 too big  
69 069 Exponent 10 too small  
70 070 Entry cannot be interpreted as number  
71 071 Too many decimal places  
72 072 Value entered is too big  
73 073 Places after decimal point may be rounded  
74 074 Specify smoothing parameters between 0 and 1  
75 075 Up to & historical values possible  
76 076 Weighting group & not in table T440G  
77 077 Historical period (& period splits) smaller than one seasonal cycle  
78 078 Conversion error: not possible to convert from & to &  
79 079 No procedural or error messages exist  
80 080 Version exists for & - deletion not possible  
81 081 & does not exist  
82 082 Do not enter decimal places on this line  
83 083 Date & not in planning horizon (valid date will be set)  
84 084 Different fiscal year variants cannot be planned simultaneously  
85 085 Posting periods and months cannot be planned simultaneously  
86 086 Create methods with usage &, &, or &  
87 087 Not possible to maintain long text for this charact. values combination  
88 088 Info structure & not defined for delta planning  
89 089 & is a product group (operation only possible for materials)  
90 090 Data elements for table & not maintained in language &  
91 091 "From" date comes after "to" date  
92 092 Planning type & not defined for info structure &  
93 093 "To" date comes before the start of the planning horizon  
94 094 Target key figure must have the same unit type - choose again  
95 095 Action & not defined for info structure & version &  
96 096 Enter a copy profile  
97 097 Enter the name of a macro  
98 098 Internal error: & in routine &  
99 099 Internal error: &  
100 100 You must uniquely specify product group and plant  
101 101 Enter one date only  
102 102 Specified period comes before planning start  
103 103 Specified period comes after planning finish  
104 104 Enter at least one date  
105 105 Period already in table  
106 106 Specified period already covered by one column  
107 107 Several columns are covered  
108 108 Planning plant & not maintained in the system  
109 109 No planning plant specified  
110 110 Enter no more than one planning plant  
111 111 Factory calendar ID & does not exist or is not active  
112 112 Date & comes after end of factory calendar with ID &  
113 113 Date & comes before start of factory calendar with ID &  
114 114 Position cursor on a column  
115 115 Days cannot be disaggregated  
116 116 & is not a workday; & will be set  
117 117 No variable time axis in clipboard  
118 118 Date & invalid (computing workday to calendar day)  
119 119 CORRECT_OPTION & invalid when computing workday to calendar day  
120 120 Period for date & cannot be determined from T009B (period variant &)  
121 121 Version & deleted  
122 122 Version & set as active version  
123 123 Version & is an active version  
124 124 No version exists yet  
125 125 Months and posting periods cannot be further aggregated  
126 126 Product group & in plant & currently blocked for version &  
127 127 No corresponding planning data exists  
128 128 Enter a version  
129 129 New version created  
130 130 No data exists for version &  
131 131 No graphics (only zero values have been chosen)  
132 132 Neither an active nor an inactive version exists  
133 133 Choose ONE version  
134 134 No inactive version exists  
135 135 Version & exists already --> F1  
136 136 Version & exists already --> F1  
137 137 A version cannot be activated and deleted at the same time  
138 138 No planning versions exist for & in plant &  
139 139 No inactive planning versions exist for & in plant &  
140 140 Select an area for this operation  
141 141 Number assignment error  
142 142 Actual data is being planned!  
143 143 SAP versions may not be processed  
144 144 WARNING - last planning version will be deleted  
145 145 Choose a valid line  
146 146 Version & does not exist  
147 147 No characteristics available for selection  
148 148 No materials assigned to product group & in plant &  
149 149 Transfer version does not exist (active version & will be set)  
150 150 No entry in collision table for action & environment &  
151 151 No material type exists for product groups in table T134  
152 152 No active version for materials of product group & in plant &  
153 153 Proportions are 0 % for materials of product group & in plant &  
154 154 WARNING: actual data will be deleted  
155 155 Select a forecast version  
156 156 Actual line already created  
157 157 Event lines already created  
158 158 Enter a transfer profile  
159 159 Enter a forecast profile and a field name  
160 160 The sum of the proportional factors is not 100%  
161 161 Last member reached - processing will continue with first member  
162 162 First member reached - processing will continue with last member  
163 163 Position the cursor on a member line  
164 164 Place cursor on an owner line  
165 165 Place the cursor on a scenario line  
166 166 Method usage & not defined for flexible planning  
167 167 A maximum of & characteristics can be displayed  
168 168 Number characteristics in the desired order  
169 169 The number & has been used more than once  
170 170 The column you require cannot be selected Space: object requires documentation
171 171 Number the characteristics you want to see in the header  
172 172 &1 of forecast horizon shortened due to planning horizon  
173 173 Forecast horizon set to &1 periods due to planning horizon  
174 174 Data already entered at total level - press ENTER before continuing  
175 175 Specify either &1 or &2  
176 176 A multi-level product group is not defined for transferring to Dem.Mgmt.  
177 177 Forecast profile: &1 Planning horizon from: &2 until: &3  
178 178 When specifying forecast finish, also specify forecast start  
179 179 Product group/material & - no conversion possible from & to &  
180 180 No long text exists  
181 181 Info structure with delta planning not supported for this function  
182 182 No planning hierarchy for & has been created  
183 183 No period for forecast date &1 could be determined  
184 184 No hierarchy maintenance is possible for standard SOP info structure &  
185 185 System error in transport maintenance  
186 186 System error occurred when transport checks were carried out  
187 187 Planning type & already defined globally  
188 188 System cannot be changed  
189 189 Historical periods lie outside the planning horizon  
190 190 Planning type & does not exist  
191 191 Planning type already declared  
192 192 Initial screen for info structure & not yet generated  
193 193 Table & not defined for info structure  
194 194 Structural table cannot be generated for info structure &  
195 195 Enter a valid information structure  
196 196 Not possible to schedule the job with status & .. Please reset the status  
197 197 Copying not possible (& has data relevant to planning)  
198 198 Materials eliminated from selection list  
199 199 Product groups eliminated from selection list  
200 200 Product group exists already  
201 201 Specify a description  
202 202 Specify a plant  
203 203 Plant not in Customizing table T001W  
204 204 Specify a unit of measure  
205 205 Specify a material  
206 206 Material & in plant & does not exist  
207 207 New product group - specify a plant  
208 208 New product group - specify a unit of measure  
209 209 Specify description for new product group  
210 210 Specify a material/plant  
211 211 Invalid cursor position  
212 212 Material & in plant & is already a member  
213 213 Product group & in plant & is already a member  
214 214 Version & already maintained  
215 215 Product group & plant & not new (no maintenance possible)  
216 216 Function not executable (F1: long text)  
217 217 Function not executable (F1: long text)  
218 218 Product group cannot be created (batch input error &)  
219 219 Product group cannot be created (CALL transaction)  
220 220 & is a product group  
221 221 & is not a product group  
222 222 Product group changed  
223 223 Specify product group  
224 224 Product group & does not exist  
225 225 Product group & in plant & does not exist  
226 226 Change to product group structure saved  
227 227 Product group structures deleted  
228 228 Product group & in plant & contains no members  
229 229 No valid object chosen  
230 230 Select members type  
231 231 Product group & in plant & causes recursion  
232 232 No versions maintained for material & in plant &  
233 233 Conversion factor set for material & in plant &  
234 234 Not possible to specify version for product groups  
235 235 Specify fiscal year variant  
236 236 Specify language key  
237 237 Specify a description  
238 238 Specify period indicator  
239 239 No changes made  
240 240 Master data created for product group & in plant &  
241 241 Not possible to select all product groups because of recursion  
242 242 No selection made  
243 243 No materials selected  
244 244 No product groups selected  
245 245 Make a selection  
246 246 No product group chosen  
247 247 No product groups exist  
248 248 Data maintenance locked (displaying is possible)  
249 249 No authorization to maintain data  
250 250 Product group created  
251 251 Unit of measure & is not a commercial unit  
252 252 Product group & plant &: description and unit of measure set  
253 253 Specify information structure  
254 254 Information structure & does not exist  
255 255 No database table exists for info structure &  
256 256 Planning hierarchy maintained  
257 257 Planning hierarchy not (fully) maintained for characteristics & Space: object requires documentation
258 258 Product group used in planning hierarchy &  
259 259 No screen generated for information structure  
260 260 Planning parameters for info structure & not maintained  
261 261 System error attempting to lock (no planning hierarchy maintenance)  
262 262 PG & in plant & locked (no planning hierarchy maintenance)  
263 263 Product group changed and planning hierarchy maintained  
264 264 Product group used in planning hierarchies &, &, and &  
265 265 Product group used in at least four planning hierarchies  
266 266 Product group used in planning hierarchies & and &  
267 267 Product group & in plant & contains no materials  
268 268 No assignments exist for chosen class type  
269 269 Members of product group eliminated from selection list  
270 270 Not saved (structure incomplete)  
271 271 Material not specified  
272 272 No planning material set  
273 273 Conversion factor not set  
274 274 Product group not specified  
275 275 Product group has no members  
276 276 Material/plant not specified  
277 277 Material/plant is not used  
278 278 Description already maintained in language "&"  
279 279 & locked by another user  
280 280 Error attempting to lock  
281 281 No assignments found for &  
282 282 Planning level(s) does/do not exist  
283 283 Planning level exists already  
284 284 Copy from different planning level only  
285 285 Entry exists already  
286 286 Enter characteristic values without gaps  
287 287 Not possible to calculate proportional factors  
288 288 Parts of the planning hierarchy are locked by another user  
289 289 Problems have occurred in the unlocking process  
290 290 Member of product group/characteristic & locked by another user  
291 291 Planning hierarchy created  
292 292 Planning hierarchy changed  
293 293 System error: failure to generate coding  
294 294 Transaction "Create" locked by another user  
295 295 Product group/material & does not exist  
296 296 Product group/material & plant & does not exist  
297 297 Planning units not maintained for info structure & -> F1  
298 298 Assignments exist to & (deletion not possible)  
299 299 Copying not possible (& has assignments)  
300 300 No resource load exists  
301 301 Define a time span  
302 302 Time spans longer than 200 days are invalid  
303 303 Choose ONE resources type  
304 304 Characteristic values combination does not exist for info structure &  
305 305 No rough-cut planning profile exists for characteristic comb./key figure  
306 306 Underlying network is locked  
307 307 Network & not found  
308 308 Extension to rough-cut planning profile - underlying network locked  
309 309 No rough-cut planning profile exists yet for this product group/material  
310 310 Choose ONE alternative  
311 311 Product group/material does not exist  
312 312 Rough-cut planning profile exists - new alternative will be created  
313 313 Not possible to reset - use the "Delete line" function  
314 314 Material & in plant & does not exist  
315 315 Production resource/tool & in plant & does not exist  
316 316 Material & plant & is not a production resource/tool  
317 317 "Check" function completed without errors  
318 318 "Check" function completed; rough-cut planning profile not yet consistent  
319 319 Rough-cut planning profile not consistent; not possible to save  
320 320 Enter an info structure  
321 321 Enter product group or material and the plant  
322 322 Info structure &: direct for product group or material  
323 323 Rough-cut planning profile created  
324 324 Rough-cut planning profile changed  
325 325 Rough-cut planning profile deleted  
326 326 Enter characteristics without gaps  
327 327 Define at least ONE characteristic  
328 328 Rough-cut planning profile currently locked  
329 329 Not currently possible to lock  
330 330 Message type already created for info structure &  
331 331 Cost element not specified  
332 332 No capacities can be determined for work center  
333 333 Unit does not exist  
334 334 The unit of at least one capacity has a dimension other than &  
335 335 & is a material - please enter a product group  
336 336 & is a product group - please enter a material  
337 337 Enter a description  
338 338 No reference rough-cut planning profile found  
339 339 Message type created for info structure &  
340 340 No message type created for info structure &  
341 341 Reference message type does not exist  
342 342 Generation could not be carried out  
343 343 Caution: overload in period &  
344 344 Methods maintenance is currently blocked by user &  
345 345 Info structure & not defined for planning  
346 346 Data was copied successfully  
347 347 Mass processing ended (error in configuration of copying - reason &)  
348 348 No possible entries displayable here  
349 349 Planning activity & not possible for planning type & Space: object requires documentation
350 350 Info structure & not planned with consistent planning method  
351 351 Selection ID for application & is not maintained! Space: object requires documentation
352 352 Forecast profile &1 : Forecast period from: &2 to: &3. Space: object requires documentation
353 353 Forecast profile &1 : historical period from: &2 to &3 Space: object requires documentation
354 354 The to... date lies outside the planning horizon. Space: object requires documentation
355 355 Key figure assignment & not valid for planning type & Space: object requires documentation
356 356 This checking rule has not been created yet Space: object requires documentation
357 357 Check for unplanned characteristics is switched off in Customizing Space: object requires documentation
358 358 Settings were saved Space: object requires documentation
359 359 Settings were not saved Space: object requires documentation
360 360 No characteristic value combinations exist for the selected data  
361 361 Structure not yet maintained for this combination of characteristics  
362 362 Total is fixed. Member is automatically fixed by entry. Space: object requires documentation
363 363 No values can be proposed Space: object requires documentation
364 364 & & imported by default (no fixed planning type setting) Space: object requires documentation
365 365 Please choose a valid info structure Space: object requires documentation
366 366 Records with a different planning periodicity exist Space: object requires documentation
367 367 Job not/incorrectly scheduled Space: object requires documentation
368 368 Planning hierarchy already created. Choose 'Change' Space: object requires documentation
369 369 Error occurred when calling standard analysis Space: object requires documentation
370 370 Upper limit of lot size interval smaller than lower limit  
371 371 Lot size interval overlaps with the alternative from & to &  
372 372 Upper limit of lot-size interval must be greater than 0  
373 373 Base quantity of rough-cut planning profile must be greater than 0 Space: object requires documentation
374 374 Lower limit of lot-size increment must be greater than 0 Space: object requires documentation
375 375 No period unit maintained in material master Space: object requires documentation
376 376 No results rows were created Space: object requires documentation
377 377 To save the corrected event, please choose a key figure Space: object requires documentation
378 378 One level skipped because only one characteristic (see header info) Space: object requires documentation
379 379 Please maintain the quantity/currency unit Space: object requires documentation
380 380 No events found  
381 381 Select ONE event  
382 382 Event period consists of at least one day  
383 383 Enter a valid period indicator (&, &, &, &) Space: object requires documentation
384 384 Specify fiscal year variant with period specification &  
385 385 Enter an event number  
386 386 Event & already exists  
387 387 Event & does not exist  
388 388 Event & is currently locked  
389 389 Event & saved  
390 390 Event & deleted  
391 391 Assignments exist for event & - not possible to delete  
392 392 No reference events found  
393 393 First select events  
394 394 No event maintained in your system as yet  
395 395 Event & contains no items - not possible to save  
396 396 Event & contains no items - not possible to assign  
397 397 Your entry cannot be interpreted as a number - please check it  
398 398 Planning method not defined in Customizing  
399 399 No planning versions exist yet for info structure &  
400 400 Enter a key figure from information structure &  
401 401 No data exists for chosen selection  
402 402 Enter active info structure  
403 403 Calculation: single-level = "1" - multi-level = "2"  
404 404 No matching characteristic value combinations found  
405 405 Event already assigned to date &  
406 406 No existing assignments for event &  
407 407 Info structure & cannot be planned with events (delta planning)  
408 408 Factory calendar error (returncode = &)  
409 409 Enter numerical version number  
410 410 Planning activity & not maintained  
411 411 Transfer profile & does not exist  
412 412 Distribution possible only for level-by-level or consistent planning  
413 413 Sum of the proportions does not equal 100  
414 414 Choose receipts  
415 415 Choose issues  
416 416 Choose stock  
417 417 Choose target stock  
418 418 Operation only possible for info structures that contain a material  
419 419 Enter a planning horizon  
420 420 Background job number & is already assigned  
421 421 No job with the number & exists  
422 422 Conversion program & started at &  
423 423 Conversion program & ended at &  
424 424 Enter a material and, if necessary, a plant  
425 425 Enter a method  
426 426 Proportional factors successfully calculated  
427 427 Key figure & not defined for forecast  
428 428 Calculation of proportional factors terminated  
429 429 This method does not exist  
430 430 No changes were made  
431 431 No program exists  
432 432 Variant & of program & is locked  
433 433 Variant & of report & is protected  
434 434 Variant & of program & does not exist  
435 435 Only current stock can be calculated for info structure &  
436 436 No plants assigned to material &  
437 437 Stocks could not be saved  
438 438 Delta planning not supported for this function  
439 439 Choose days' supply  
440 440 Planning job created successfully  
441 441 Planning job changed successfully  
442 442 Planning jobs deleted  
443 443 Status of all planning objects for scheduling set to "active"  
444 444 No planning jobs created  
445 445 Choose target days' supply  
446 446 No period can be determined for the event  
447 447 Enter a to-date Space: object requires documentation
448 448 Please check if the execution level contains the material Space: object requires documentation
449 449 Please check whether material and plant are in the execution level Space: object requires documentation
450 450 Planning type & already exists  
451 451 Planning type & not yet created  
452 452 Specify range of reference  
453 453 Planning type & saved  
454 454 Enter data  
455 455 Macro & saved  
456 456 Planning type & falls within the SAP name range  
457 457 Planning type & deleted  
458 458 Macro name lies within SAP name range  
459 459 Caution: user exit must be programmed  
460 460 Not possible to create background job  
461 461 Background job has no name  
462 462 Background job has no valid start date  
463 463 Background job scheduled successfully  
464 464 Range of coverage: covered up to end of planning horizon Space: object requires documentation
465 465 Info structure & lacks the necessary structure Space: object requires documentation
466 466 Please choose one of the proposed planning types Space: object requires documentation
467 467 Please select one of the proposed planning versions Space: object requires documentation
468 468 No planning objects exist for background job & Space: object requires documentation
469 469 Value entered was smaller than its partial fixing. Value corrected. Space: object requires documentation
470 470 Line & used in macro &  
471 471 No average plant stock has been maintained for long-term planning  
472 472 Version & created for info structure &  
473 473 Capacity data for version & deleted  
474 474 Capacity situation not yet determined  
475 475 No termination log was created (everything OK)  
476 476 Aggregated copy preconfigured on the basis of aggregated planning. Space: object requires documentation
477 477 Not an aggregated copy, but copy at detail level Space: object requires documentation
478 478 Number cannot be greater than & Space: object requires documentation
479 479 Number cannot be less than '1' Space: object requires documentation
480 480 Include characteristic "product group/material" once only  
481 481 Include characteristic "plant" once only  
482 482 Include plant field for planning hierarchy  
483 483 Include product groups/materials field for planning hierarchy  
484 484 Include product groups field in structure before plant field  
485 485 Include no elements after plant field  
486 486 Include product groups field directly before plant field Space: object requires documentation
487 487 Product group & does not have any members Space: object requires documentation
488 488 Enter a value / operand Space: object requires documentation
489 489 Capacity planning is not possible for this info structure & Space: object requires documentation
490 490 Planning type does not contain the capacity key figure & Space: object requires documentation
491 491 Capacity planning is not possible for this charact. values combination Space: object requires documentation
492 492 Material &, plant & was deleted from the planning hierarchy Space: object requires documentation
493 493 Del. indicator: Mat. &, plant & was deleted from the planning hierarchy Space: object requires documentation
494 494 Split the periods in ascending order Space: object requires documentation
495 495 Select a period Space: object requires documentation
496 496 End of number range for generated screens has been reached Space: object requires documentation
497 497 Selected entries were deleted from the table T445B Space: object requires documentation
498 498 Period & cannot be generated (see long text) Space: object requires documentation
499 499 Factory calendar ID & not in table T001W  
500 500 Material & not found  
501 501 Not possible to convert from & to & -> F1  
502 502 Insoluble problem reading consumption data from & & & &  
503 503 Insoluble problem creating PG structure from & &  
504 504 Plant & not in plant table  
505 505 Insoluble problem reading factory calendar for ID & date &  
506 506 Invalid date for week computation (&)  
507 507 Invalid week for computation of first weekday (&)  
508 508 Insoluble problem determining forecast periods (&, &)  
509 509 PG/mat. & in plant & - no active version found  
510 510 Product group for material & in plant & not found  
511 511 Date of forecast period & cannot be determined (ID = &)  
512 512 Version & of info structure & not found  
513 513 Info structure & not found/does not exist in table TMC4  
514 514 Choose ONE key figure that you want to be copied  
515 515 Info structure & contains no key figures of quantities  
516 516 Data as from & only (planning start) can be copied  
517 517 Info structure & does not contain the characteristic "material number"  
518 518 Error reading consumption data  
519 519 Consumption data does not exist for periods following the current one  
520 520 Forecast period ends after & (planning finish)  
521 521 Forecast period ends after & (end of factory calendar)  
522 522 Historical period starts before & (start of factor calendar)  
523 523 Product group for material & in plant & cannot be uniquely determined  
524 524 Product group/material & in plant & cannot be found  
525 525 Requirements type & not in table T459B or not planned independent reqmt.  
526 526 Choose ONE transfer strategy  
527 527 "To" date comes before "from" date  
528 528 Requirements for PG/material & in plant & transferred to Demand Mngt.  
529 529 Currently displayed data will not be transferred  
530 530 PG/material & in plant & blocked for transfer to demand management  
531 531 Breakdown of product group plan only possible for product groups  
532 532 Product group & in plant & contains no members  
533 533 Version & does not exist  
534 534 No active version found  
535 535 Material & in plant &, not PG & in plant &  
536 536 PG/mat. & in plant & version & - version not found  
537 537 Planning version to be transferred is not the active version  
538 538 This PG is not the MRP-relevant PG for all members  
539 539 Choose at least one product group member  
540 540 Choose one form of disaggregation  
541 541 Last PG member to be chosen now processed, processing will begin again  
542 542 No conversion from & to & for material &  
543 543 PG for material & in plant & version & cannot be determined  
544 544 PG for material & in plant & version & not found  
545 545 Specified material in specified PG not found  
546 546 Version & does not exist or is not active for all PG members  
547 547 PG relevant to MRP for material & in plant & cannot be determined  
548 548 Version & determined and set as active version  
549 549 An active version could not be determined for all PG members  
550 550 Version & does not exist or is not active for all PG members  
551 551 No active version found  
552 552 Planning version to be transferred is not the active version  
553 553 Version & does not exist  
554 554 Product group contains no members  
555 555 Multi-level product group not suitable for transferal  
556 556 & plant & is a material, not a product group - enter a product group  
557 557 & plant & is a product group, not a material - enter a material  
558 558 All historical values before & are zero --> F1  
559 559 Forecast includes only historical values as from & --> F1  
560 560 Between & and & all historical values are zero  
561 561 Transfer of planning data terminated without error messages  
562 562 Only possible to read consumption data for a period in the past  
563 563 No consumption data found for members  
564 564 Product group hierarchy contains no materials  
565 565 Material & plant & has different prod. version --> no transfer possible  
566 566 Recursiveness due to & & (owner & &)  
567 567 Copying not supported for this combination of planning methods  
568 568 Only stock quantities can be determined for this information structure Space: object requires documentation
569 569 Choose different characteristics Space: object requires documentation
570 570 Operating concern cannot be determined from plant &  
571 571 Invalid: quantity indicator & or operating concern &  
572 572 Transfer performed for version & (no. &), key figure &  
573 573 Invalid CO-PA field name: &  
574 574 Invalid key figure: &  
575 575 Version & does not exist  
576 576 Invalid: characteristic indicator & or operating concern &  
577 577 Characteristic & in results area & does not exist - choose with F4  
578 578 Transfer for material --> field name is always &  
579 579 Record cannot be converted  
580 580 Choose a key figure with a quantity unit (unit of measure) Space: object requires documentation
581 581 Choose valid characteristics from the info structure Space: object requires documentation
582 582 Maintain price band prices in ascending order Space: object requires documentation
583 583 Operation on this info structure only possible with consistent planning Space: object requires documentation
584 584 Choose a key figure with a quantity or currency unit Space: object requires documentation
585 585 Stocks successfully saved  
586 586 Period selected precedes the start of the planning horizon (&) Space: object requires documentation
587 587 OTB is not calculated until the beginning of the planning horizon (&) Space: object requires documentation
588 588 Error & occurred in Demand Management (application area &) Space: object requires documentation
589 589 &: & cannot be converted to & Space: object requires documentation
590 590 Scheduling of production quantity for & not saved  
591 591 Number range object & does not exist  
592 592 Number range object &, number range & does not exist  
593 593 Number range object &, number range &: no internal number assignment  
594 594 Number range object &, number range & will soon be exhausted  
595 595 Number range object &, number range & exhausted  
596 596 Number range object &, number range &: no external number assignment  
597 597 Number & does not lie in external number range  
598 598 No working days in period &, but planning data exists Space: object requires documentation
599 599 Not possible to delete; Save new entries prior to deletion The short text describes the object sufficiently
600 600 Not possible to extend list further  
601 601 Not possible to shorten list further  
602 602 & plant & is not a product group  
603 603 & plant & is a product group  
604 604 Material & in plant & not used in product groups  
605 605 Product group & in plant & not a member of other product groups  
606 606 Neither active nor inactive planning versions exist  
607 607 Product group & in plant & has no members  
608 608 Storage period is not defined for this info structure  
609 609 Planning parameters already created for info structure &  
610 610 Specify a fiscal year variant  
611 611 No fiscal year variant needed for storage periodicity &  
612 612 Maintain one of the fields "macro - forecast profile" to specify action Space: object requires documentation
613 613 Macro >&< not defined for planning type >&<  
614 614 Planning type >&< contains no field >&<  
615 615 Info structure & does not exist  
616 616 No period indicator found  
617 617 Info structure does not contain the key figure specified Space: object requires documentation
618 618 Info structure does not contain the characteristic specified Space: object requires documentation
619 619 Operating concern does not contain specified key figure Space: object requires documentation
620 620 Please activate OTB in Customizing first Space: object requires documentation
621 621 Aggregated copy only possible using special report Space: object requires documentation
622 622 The specified characteristic lies outside the operating concern Space: object requires documentation
623 623 Info structure and operating concern not unique for assignment key & Space: object requires documentation
624 624 Please choose a valid assignment key Space: object requires documentation
625 625 Characteristic & already used in the assignment key Space: object requires documentation
626 626 Key figure & already used in assignment key Space: object requires documentation
627 627 Internal characteristic assignment for info structure S076 Space: object requires documentation
628 628 Only assign quantity and currency fields to one another Space: object requires documentation
629 629 Please give a complete definition of the characteristic assignment Space: object requires documentation
630 630 No info structure entries in table & Space: object requires documentation
631 631 No entries were selected Space: object requires documentation
632 632 Table &: no DDIC table noted for info structure & Space: object requires documentation
633 633 Table &: info structure & does not exist Space: object requires documentation
634 634 Table &: no posting period found for info structure & Space: object requires documentation
635 635 Info structure has an invalid period indicator Space: object requires documentation
636 636 From-date is later than to-date Space: object requires documentation
637 637 Versions & and & have different posting periods Space: object requires documentation
638 638 Version &: the table does not contain any entries Space: object requires documentation
639 639 Please choose different versions and/or key figures Space: object requires documentation
640 640 No data maintained for material & plant & in transfer period Space: object requires documentation
641 641 No data maintained for material & in transfer period Space: object requires documentation
642 642 Please choose a valid key figure Space: object requires documentation
643 643 Info structure & has an unsuitable structure Space: object requires documentation
644 644 Characteristics assignment & not completely defined Space: object requires documentation
645 645 No info structure chosen for the update Space: object requires documentation
646 646 No fixed storage periodicity was maintained for info structure & Space: object requires documentation
647 647 No data maintained for material & plant & and & in transfer period Space: object requires documentation
648 648 Product group/material is not allowed as an aggregation level Space: object requires documentation
649 649 A maximum of 16 curves can be displayed Space: object requires documentation
650 650 Error in the period determination Space: object requires documentation
651 651 Forecast cannot be carried out using the weighting model Space: object requires documentation
652 652 Please enter forecast periods Space: object requires documentation
653 653 Forecast/historical period cannot be calculated Space: object requires documentation
654 654 Each selected entry needs a sequence number Space: object requires documentation
655 655 Please complete the number of chosen periods Space: object requires documentation
656 656 Period split & not found Space: object requires documentation
657 657 Historical horizon shortened due to technical period & Space: object requires documentation
658 658 Inconsistency between period units in & and the info structure Space: object requires documentation
659 659 Inconsistency between historical and future split with the same name Space: object requires documentation
660 660 Period split for past / future needs to be maintained Space: object requires documentation
661 661 Preiod unit & & not defined under planning period units Space: object requires documentation
662 662 Period & not found in period tables Space: object requires documentation
663 663 Please select the periods to be changed in the K column Space: object requires documentation
664 664 Selected periods corrected using average value Space: object requires documentation
665 665 Forecast period & & does not exist in the planning period units Space: object requires documentation
666 666 Planning object & cannot be saved Space: object requires documentation
667 667 No period split defined. You are planning in technical periods. Space: object requires documentation
668 668 No technical period generated for level-by-level planning Space: object requires documentation
669 669 Preiod unit & & is not possible under & Space: object requires documentation
670 670 Date of events & lies outside the planning period Space: object requires documentation
671 671 The technical periods used do not contain any posting periods Space: object requires documentation
672 672 Disag. only possible from the key fig. view - Members contain neg. values Space: object requires documentation
673 673 Function code & does not exist Space: object requires documentation
674 676 Only these characters (&) are permitted in version numbers Space: object requires documentation
675 677 No data records were transferred! Space: object requires documentation
676 680 Characteristic & contains selection values with no hierarchy entry. Space: object requires documentation
677 683 Planning method cannot be changed (planning versions already exist)  
678 690 Last unfixed member was reached - value cannot be fixed Space: object requires documentation
679 691 ALE not allowed for information structure & Space: object requires documentation
680 700 These planning figures result in a negative seasonal budget Space: object requires documentation
681 701 No historical values exist  
682 702 Not enough historical values for initialization  
683 703 Basic value will be zero  
684 710 OTB was exceeded for the following combinations of characteristics: Space: object requires documentation
685 711 & & Space: object requires documentation
686 720 The row is an event base row - it cannot be deleted Space: object requires documentation
687 730 No macros defined yet for this application  
688 731 Choose first line  
689 732 Choose an operation  
690 733 Choose second line  
691 734 Choose results line  
692 735 Choose owner line  
693 736 Choose member line  
694 737 Macro & already declared  
695 738 Macro not yet saved  
696 739 This unit value does not exist  
697 741 Specified fiscal year variant does not exist  
698 750 No key figure(s) available for selection  
699 751 Enter only positive period values  
700 752 Enter offset smaller than no. of historical values  
701 753 Error converting units  
702 754 Error occurred while transferring data to Demand Management Space: object requires documentation
703 755 Aggregated planning selected: Extended selection set  
704 760 Unit &1 is not created in language &2 Space: object requires documentation
705 770 Internal condition &1 &2 &3 &4 not fulfilled  
706 771 Internal condition &1 &2 &3 &4 not fulfilled Space: object requires documentation
707 777 Maintain a fiscal year variant for this info structure  
708 778 Error in periods for time-based disaggregation Space: object requires documentation
709 779 Info structure's data records exist, not possible to change period unit Space: object requires documentation
710 780 No technical period unit exists for info structure Space: object requires documentation
711 781 No period split defined for the planning types Space: object requires documentation
712 782 Error while aggregating events in Cols_index Space: object requires documentation
713 783 Error while disaggregating events in technical periods & Space: object requires documentation
714 784 Transfer of corrected values not possible, different period unit Space: object requires documentation
715 785 Please use your own maintenance transaction for & Space: object requires documentation
716 786 A technical period can only contain a maximum of 1 posting period Space: object requires documentation
717 790 You cannot perform activity & together with other activities Space: object requires documentation
718 791 Value missing for characteristic & Space: object requires documentation
719 792 Plant to be selected as aggregation level Space: object requires documentation
720 793 Info structure: use of user exits is not supported Space: object requires documentation
721 794 Transfer requirements for PG/material & plant & Seiban & to reqts plng Space: object requires documentation
722 795 There is no point entering a comb. key w/o a combinat. of characteristics Space: object requires documentation
723 800 Not possible to format date for output  
724 801 Invalid date (contains characters other than 0-9)  
725 802 Fiscal year variant is obligatory for period indicator 'P'  
726 803 Not possible to load calendar  
727 804 Invalid correction option for calendar  
728 805 Date comes after end of factory calendar  
729 806 Date comes before start of factory calendar  
730 807 Invalid date  
731 808 Factory calendar ID not found  
732 809 Factory calendar day comes after end of factory calendar  
733 810 Factory calendar day comes before start of factory calendar  
734 811 Invalid factory calendar day  
735 812 Factory calendar ID missing  
736 813 Factory calendar missing  
737 814 Invalid week  
738 815 Error determining last day of a period (period indicator P)  
739 816 Error determining period (period ind. P) for a date  
740 817 Date specification from... and to... not in ascending order  
741 818 Error setting up historical values table  
742 819 Error setting up periods table: from... greater than to...  
743 820 Invalid period (contains characters other than 0-9)  
744 821 Specified forecast profile not maintained in the system  
745 822 Not possible to convert 7-character period to 6-character period  
746 823 Forecast start date comes before original start date (&)  
747 824 Historical data present in unit & - conversion impossible  
748 825 >$< is not a units field in information structure >$<  
749 826 Planning method "K" not allowed - info structure >$< contains prod.groups  
750 827 Assignment(s) flagged for saving  
751 828 Choose at least ONE key figure  
752 829 Specify at least ONE assignment date  
753 830 Original historical period (& - &) was smaller  
754 831 No. of forecast periods does not equal no. of periods to be copied  
755 832 Enter a valid forecast profile  
756 833 No valid history number entered  
757 834 Choose at least 1 version  
758 835 Assignment flag(s) created and existing flag(s) changed  
759 836 Existing assignment flag(s) changed  
760 837 Identical assignment flag(s) exist(s) already - no change made  
761 838 Not currently possible to lock/unlock  
762 839 Source structure and target structure must be different  
763 840 Values smaller than 0.1 are not allowed in a rough-cut planning profile  
764 841 More than one decimal place is not possible  
765 842 No forecast object found for the combination Space: object requires documentation
766 843 No forecast object found for the parameter numbers Space: object requires documentation
767 844 Please enter an info structure Space: object requires documentation
768 845 Caution: all material forecasts will be deleted in all plants Space: object requires documentation
769 846 Fiscal year variant & is not maintained Space: object requires documentation
770 847 Period & of fiscal year variant & in year & is not maintained Space: object requires documentation
771 848 Technical fiscal year variant & is not maintained Space: object requires documentation
772 849 Calendar & not maintained for a sufficient period of time Space: object requires documentation
773 850 Different technical periods found Space: object requires documentation
774 851 This function is not possible in combination with period unit "Day" Space: object requires documentation
775 852 Data input not complete Space: object requires documentation
776 853 Remainder indicator not set for the last period Space: object requires documentation
777 854 No. of periods greater than the number defined in the planning type info Space: object requires documentation
778 855 No planning period unit selected Space: object requires documentation
779 856 This function not possible for period indicator & Space: object requires documentation
780 857 Period split is defined for longer period of time than technical periods Space: object requires documentation
781 858 Change not permitted in this client Space: object requires documentation
782 859 Period unit 'day' is used as planning period unit Space: object requires documentation
783 860 Fiscal year variant & already exists Space: object requires documentation
784 861 Period unit & & is not valid for original technical periods Space: object requires documentation
785 862 Enter a name of your choice for the technical fiscal year variant Space: object requires documentation
786 863 Enter the years to which the technical fiscal year variant is to apply Space: object requires documentation
787 864 Enter at least one period unit Space: object requires documentation
788 865 Enter fiscal year variant for posting period Space: object requires documentation
789 866 No technical period generated for period unit 'day' Space: object requires documentation
790 867 Fiscal year variant & generated for technical periods Space: object requires documentation
791 868 Fiscal year variant & cannot be generated Space: object requires documentation
792 869 Existing fiscal year variant & copied Space: object requires documentation
793 870 Year &: fiscal year variant & not maintained Space: object requires documentation
794 871 The time bar & already exists Space: object requires documentation
795 872 Period indicator & not possible Space: object requires documentation
796 873 No generated technical periods exist, change not possible Space: object requires documentation
797 874 Please enter information for the new generation Space: object requires documentation
798 875 Use the 'Save' function for generating Space: object requires documentation
799 876 Incorrect horizon: 'To year' earlier than 'From year' Space: object requires documentation
800 877 Fiscal year variant & not possible for & Space: object requires documentation
801 878 Fiscal year variant & extended for new horizon Space: object requires documentation
802 879 No generated technical planning period unit exists for & Space: object requires documentation
803 880 Actual data version (version 000) not supported Space: object requires documentation
804 881 Error occurred during key figure assignment Space: object requires documentation
805 882 Error in CO/PA <-> LIS assignment Space: object requires documentation
806 883 Error in characteristic assignment Space: object requires documentation
807 884 No planning settings exist for info structure & Space: object requires documentation
808 885 Unit missing for key figure & Space: object requires documentation
809 886 No exchange rate type maintained for info structure & Space: object requires documentation
810 887 Period missing for key figure & Space: object requires documentation
811 888 Period indicator missing Space: object requires documentation
812 889 Fiscal year variant missing Space: object requires documentation
813 890 Error occurred during period conversion Space: object requires documentation
814 891 Error occurred while saving the planning data Space: object requires documentation
815 892 No type of planning maintained for info structure & Space: object requires documentation
816 893 Error while reading factory calendar ID & Space: object requires documentation
817 894 Planning type & could not be defined Space: object requires documentation
818 895 Last / first day of period & could not be calculated Space: object requires documentation
819 896 Error occurred while reading the planning data Space: object requires documentation
820 897 Error occurred while reading the units table Space: object requires documentation
821 898 Please compare the aggregation level with the characteristic assignment Space: object requires documentation
822 899 Error when processing the planning data Space: object requires documentation
History
Last changed on/by 20110908  SAP 
SAP Release Created in