SAP ABAP Message Class KK (KK)
Basic Data
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKEK (Package) Cost accounting unit costing
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKEK (Package) Cost accounting unit costing
Attributes
Message class | KK | |
Short Description | ||
Changed On | 19970723 | |
Last Changed At | 135621 |
Messages
# | Message | Message Short Text | Documentation status | Authorization check |
---|---|---|---|---|
1 | 000 | ********* Unit Costing Error Messages 000 - 999 *************** | ||
2 | 001 | Controlling area & does not exist | ||
3 | 002 | Base planning object & & already exists | Space: object requires documentation | |
4 | 003 | Base planning object & & does not exist | Space: object requires documentation | |
5 | 004 | No texts for cost estimate & & in language & | ||
6 | 005 | Base planning object &1 &2 does not exist | Space: object requires documentation | |
7 | 006 | No texts for reference & & in language & | ||
8 | 007 | Base planning object &1 &2 does not exist | Space: object requires documentation | |
9 | 009 | Base planning object & may already have been archived | Space: object requires documentation | |
10 | 010 | Cost element & in CO area & does not exist for & | ||
11 | 011 | Company code & is not assigned to controlling area & | ||
12 | 012 | Plant & is not assigned to company code & | ||
13 | 013 | Cost estimate & & for object destroyed (saving not possible) | ||
14 | 014 | Data for base planning object & & was saved | Space: object requires documentation | |
15 | 015 | Import of cost estimate failed (notify system administrator) | ||
16 | 016 | Cost estimate & & already exists (no saving allowed) | ||
17 | 017 | Base planning object & & was saved | Space: object requires documentation | |
18 | 018 | Base planning object & is locked by user & | Space: object requires documentation | |
19 | 019 | System error: Lock table overflow | ||
20 | 020 | Internal error: & is not a valid activity type | ||
21 | 021 | Transaction & cannot be processed in base object costing | Space: object requires documentation | |
22 | 022 | Base planning object name contains invalid characters | Space: object requires documentation | |
23 | 023 | Reference order & does not exist | ||
24 | 024 | Enter one reference object | Space: object requires documentation | |
25 | 025 | Reference order & is not assigned to controlling area & | ||
26 | 026 | Reference project & does not exist | ||
27 | 027 | Reference project & is not assigned to controlling area & | ||
28 | 028 | No cost estimate exists for reference order & for & | ||
29 | 029 | No cost estimate exists for reference project & for & | ||
30 | 030 | No unit cost estimate exists for reference & | Space: object requires documentation | |
31 | 031 | Plant & does not exist | ||
32 | 032 | Company code & does not exist | ||
33 | 033 | No total value cost estimate exists for reference order & | ||
34 | 034 | No total value cost estimate exists for reference project & | ||
35 | 035 | Cost element & has an invalid cost element category | ||
36 | 036 | No cost estimate exists for the reference material | ||
37 | 037 | Enter company code or plant | Space: object requires documentation | |
38 | 038 | Internal error: Update not possible | ||
39 | 039 | Reference cost estimate not allowed | ||
40 | 040 | Cost object & to be copied does not exist | ||
41 | 041 | Cost object & to be copied is not assigned to CO area & | ||
42 | 042 | No cost estimate exists for cost object & to be copied | ||
43 | 043 | No cost estimate exists for material & to be copied | ||
44 | 044 | Enter valid costing date and/or version | Space: object requires documentation | |
45 | 045 | No cost estimate exists for sales document &, item & | ||
46 | 046 | Sales document & item & does not exist | ||
47 | 047 | Costing sheet not available for base planning objects or ad hoc cost est | Space: object requires documentation | |
48 | 048 | First enter the costing sheet | Space: object requires documentation | |
49 | 049 | Enter costing sheet | Space: object requires documentation | |
50 | 050 | Costing reference object & not allowed | ||
51 | 051 | No entry in table & | ||
52 | 052 | The source and target tables have different numbers of entries | ||
53 | 053 | The keys of the source and target tables are the same | ||
54 | 054 | Cost estimate with key: & does not exist | ||
55 | 055 | Internal program error: & | ||
56 | 056 | Overhead key & not available in costing sheet & | ||
57 | 057 | Cost estimate could not be selected | ||
58 | 058 | More than one cost estimate has the key & | ||
59 | 059 | Data relevant to costing was changed. Adjust cost estimate | ||
60 | 060 | No overhead key exists for costing sheet & | ||
61 | 061 | No authorization to create base planning obj. in controlling area & | Space: object requires documentation | |
62 | 062 | No authorization to change base planning obj. in controlling area & | Space: object requires documentation | |
63 | 063 | No authorization to display base planning obj. in controlling area & | Space: object requires documentation | |
64 | 064 | No authorization for authorization object &, activity &, CO area & | ||
65 | 065 | Object &1 / &2 does not exist | Space: object requires documentation | |
66 | 066 | Profit center &1 does not exist in controlling area &2 | Space: object requires documentation | |
67 | 067 | Unit cost estimate &1 does not exist | Space: object requires documentation | |
68 | 068 | Base planning object group &2 is not valid in controlling area &1 | Space: object requires documentation | |
69 | 099 | *** Messages for Table Control ***************************************** | ||
70 | 100 | Width of selected columns changed | ||
71 | 101 | Column width setting canceled | ||
72 | 102 | Shifted columns cannot be fixed | ||
73 | 103 | Select column(s) | Space: object requires documentation | |
74 | 104 | Characteristic & has already been assigned | Space: object requires documentation | |
75 | 105 | Feature & does not exist | Space: object requires documentation | |
76 | 107 | & is not a valid characteristic name | Space: object requires documentation | |
77 | 120 | Internal error: no HTML template has been found for model & | Space: object requires documentation | |
78 | 121 | Object & is not in the Web Repository | Space: object requires documentation | |
79 | 122 | No HTML template has yet been saved for this costing model | Space: object requires documentation | |
80 | 150 | ********* Error messages for multilevel unit costing ******************** | Space: object requires documentation | |
81 | 151 | Multilevel unit costing is at the pilot stage | Space: object requires documentation | |
82 | 152 | Index &1 for table &2 does not yet exist | Space: object requires documentation | |
83 | 153 | Index is already available. | Space: object requires documentation | |
84 | 154 | Index was sucessfully created. | Space: object requires documentation | |
85 | 155 | An item cannot be deleted from an automatic cost estimate | Space: object requires documentation | |
86 | 156 | The objects selected cannot be inserted inside each other | Space: object requires documentation | |
87 | 157 | Multilevel unit costing requires a WIN32 frontend | Space: object requires documentation | |
88 | 158 | A tree control could not be generated. | Space: object requires documentation | |
89 | 159 | The Drag and Drop function could not be initialized. | Space: object requires documentation | |
90 | 160 | Program inconsistency: Node &1 does not exist. | Space: object requires documentation | |
91 | 161 | Error when communicating with a tree control. | Space: object requires documentation | |
92 | 162 | No materials/material cost estimates found | Space: object requires documentation | |
93 | 163 | Material cost estimate for material &1 is locked by user &2 | Space: object requires documentation | |
94 | 164 | Inconsistent internal node type | Space: object requires documentation | |
95 | 165 | Error messages have been issued. Please look in the log. | Space: object requires documentation | |
96 | 166 | Cyclic structures cannot be costed | Space: object requires documentation | |
97 | 167 | Base planning object & not found | Space: object requires documentation | |
98 | 168 | Cost estimate already exists | Space: object requires documentation | |
99 | 169 | Position the cursor on a valid line | Space: object requires documentation | |
100 | 170 | Reference cost estimate has errors (see long text) -> no copy created | Space: object requires documentation | |
101 | 171 | Material of reference cost estimate is configurable -> no copy created | Space: object requires documentation | |
102 | 172 | Base planning object &1 contains base planning object &2 without item | Space: object requires documentation | |
103 | 173 | Base planning object &1 does not have a costing item | Space: object requires documentation | |
104 | 174 | Plant &1 is not in controlling area &2; no selection for this plant | Space: object requires documentation | |
105 | 175 | No corresponding plant exists in controlling area &1 | Space: object requires documentation | |
106 | 176 | No base planning object found for the selection criteria | Space: object requires documentation | |
107 | 177 | No activity types in co. code &1 for the selection criteria entered | Space: object requires documentation | |
108 | 178 | Mixed cost estimate not allowed as reference -> no copy | Space: object requires documentation | |
109 | 179 | Cost est. for proc. alternatives not allowed as reference -> no copy | Space: object requires documentation | |
110 | 180 | Cost ests for co-products not allowed as reference -> no copy | Space: object requires documentation | |
111 | 181 | Reference cost estimate contains cycles and will not be copied | Space: object requires documentation | |
112 | 182 | Costing variant &1 not allowed when creating cost estimate | Space: object requires documentation | |
113 | 183 | Set a filter first in the unit costing list screen | Space: object requires documentation | |
114 | 184 | Copying was canceled - data has not been changed | Space: object requires documentation | |
115 | 185 | There is no suitable container in the worklist | Space: object requires documentation | |
116 | 186 | Object was not inserted as it already exists in the structure | Space: object requires documentation | |
117 | 198 | Container is item category-dependent - enter item category | Space: object requires documentation | |
118 | 199 | Item category &1 is not permitted for container | Space: object requires documentation | |
119 | 200 | Access to worklist &1 denied | Space: object requires documentation | |
120 | 201 | Worklist &1 does not exist | Space: object requires documentation | |
121 | 202 | Worklist(s) could not be saved | Space: object requires documentation | |
122 | 203 | Worklists not read successfully | Space: object requires documentation | |
123 | 204 | Contents of worklist &1 not read successfully -> default display | Space: object requires documentation | |
124 | 205 | No worklist exists for which authorization is provided | Space: object requires documentation | |
125 | 206 | Only &1 of the worklists specified can be deleted | Space: object requires documentation | |
126 | 207 | Worklist was not deleted | Space: object requires documentation | |
127 | 208 | Worklist(s) not found | Space: object requires documentation | |
128 | 209 | Creation of worklist not authorized | Space: object requires documentation | |
129 | 210 | Not all worklists were found | Space: object requires documentation | |
130 | 211 | Action canceled | Space: object requires documentation | |
131 | 212 | Worklist could not be created | Space: object requires documentation | |
132 | 213 | Worklist is emtpy and so cannot be edited | Space: object requires documentation | |
133 | 214 | Worklist was not renamed successfully | Space: object requires documentation | |
134 | 215 | Lock error for new worklist &1 occurred &2 | Space: object requires documentation | |
135 | 216 | Worklist &1 is currently locked for write access - saving not possible | Space: object requires documentation | |
136 | 217 | Worklist was saved | Space: object requires documentation | |
137 | 218 | Worklist created successfully | Space: object requires documentation | |
138 | 219 | Worklist copied successfully | Space: object requires documentation | |
139 | 220 | Worklist was renamed and saved under new name | Space: object requires documentation | |
140 | 221 | Enter a valid name for the worklist | Space: object requires documentation | |
141 | 222 | Content of worklist &1 was not read successfully | Space: object requires documentation | |
142 | 223 | Temporary worklists and worklists with free text (still) not allowed | Space: object requires documentation | |
143 | 224 | Worklist was deleted | Space: object requires documentation | |
144 | 225 | Worklist name either not entered or not allowed -> worklist not created | Space: object requires documentation | |
145 | 226 | Nothing deleted | Space: object requires documentation | |
146 | 227 | Worklist is empty and so cannot be saved | Space: object requires documentation | |
147 | 228 | Worklist is empty and so cannot be copied | Space: object requires documentation | |
148 | 229 | Worklist is empty and so cannot be renamed | Space: object requires documentation | |
149 | 230 | Worklist is empty and so cannot be deleted | Space: object requires documentation | |
150 | 231 | User configuration for worklist was saved | Space: object requires documentation | |
151 | 232 | Deletion not possible because container is not empty | Space: object requires documentation | |
152 | 233 | Worklist already in display | Space: object requires documentation | |
153 | 234 | Lock error has occurred for worklist &1 to be deleted | Space: object requires documentation | |
154 | 235 | The new and old names of the worklist are identical | Space: object requires documentation | |
155 | 236 | Worklist is empty and so cannot be converted | Space: object requires documentation | |
156 | 237 | Nothing copied | Space: object requires documentation | |
157 | 238 | Worklist &1 is locked by user &2 | Space: object requires documentation | |
158 | 239 | System was unable to lock worklist &1 - saving not possible | Space: object requires documentation | |
159 | 240 | Lock error occurred for worklist &1 - saving not possible | Space: object requires documentation | |
160 | 241 | Worklist has since been changed and is therefore being read again | Space: object requires documentation | |
161 | 242 | Place the cursor on a container in the worklist | Space: object requires documentation | |
162 | 243 | Enter a valid container name | Space: object requires documentation | |
163 | 244 | Container was deleted | Space: object requires documentation | |
164 | 245 | Container was inserted | Space: object requires documentation | |
165 | 246 | Enter a container name that does not already exist in the worklist | Space: object requires documentation | |
166 | 247 | Worklist has since been deleted from the database (see long text) | Space: object requires documentation | |
167 | 248 | Cost estimate for &1 was not saved -> cannot be saved in worklist | Space: object requires documentation | |
168 | 249 | The sole container of a worklist cannot be deleted | Space: object requires documentation | |
169 | 250 | **************** Error Messages for Unit Costing Conversion ************* | ||
170 | 251 | Enter either an order or a cost center | Space: object requires documentation | |
171 | 252 | No unit costing doucments were found for conversion | ||
172 | 253 | No year-dependent data exists for CO area & & | ||
173 | 254 | Conversion of the unit costing documents unnecessary | ||
174 | 255 | No annual values for plan version & in this controlling area | ||
175 | 256 | Fiscal year variant & does not exist | ||
176 | 257 | & entered differs from controlling area & of order | ||
177 | 258 | Order & does not exist | ||
178 | 259 | Cost center & in year & does not exist | ||
179 | 260 | Controlling area & of order is used for further processing | ||
180 | 261 | Error when translating currency: Costing number & | ||
181 | 262 | Unit costing document & has been converted | ||
182 | 263 | Unit costing document &: Error when updating | ||
183 | 264 | Conversion of unit costing document & unnecessary | ||
184 | 265 | Unit costing document & (number from COKP file) does not exist | ||
185 | 300 | ***** Error Messages RK70K_RC ********* | ||
186 | 301 | Costing variant & is invalid | ||
187 | 302 | Internal error: Transaction type & invalid | ||
188 | 303 | Internal error: Input parameter combination invalid | ||
189 | 304 | Cost estimate & already exists | ||
190 | 305 | Cost estimate & does not exist | ||
191 | 306 | You have exceeded the maximum number of periods (16) | ||
192 | 307 | Costing variant & not in table TCK03 | ||
193 | 308 | Error in costing control table TCK01 | ||
194 | 309 | Error in costing control table TCK02 | ||
195 | 310 | Error in costing control table TCK03 | ||
196 | 311 | Error in costing control table TCK04 | ||
197 | 312 | Error in costing control table TCK05 | ||
198 | 313 | Error in costing control table TCK06 | ||
199 | 314 | Error in costing control table TCK12 | ||
200 | 315 | Error in costing control table TCK07 | Space: object requires documentation | |
201 | 316 | Valuation variant in cost estimate does not match control table | ||
202 | 317 | Costing variant & does not exist for the reference object | ||
203 | 318 | Costing type & is not in table TCK01 | ||
204 | 319 | Planning currency does not exist | ||
205 | 320 | No cost estimate exists for base planning object & | Space: object requires documentation | |
206 | 326 | Error when determining partner number | Space: object requires documentation | |
207 | 328 | Additional conditions for object selection will be ignored | Space: object requires documentation | |
208 | 329 | Only the first object value is included in each case | Space: object requires documentation | |
209 | 330 | Decimal places (relevant for rounding) changed for unit of measure &1 | Space: object requires documentation | |
210 | 331 | Process &1 relates to controlling area &2 | Space: object requires documentation | |
211 | 332 | Cost center / activity type does not exist in controlling area &3 | Space: object requires documentation | |
212 | 342 | Characteristic cannot be deleted | Space: object requires documentation | |
213 | 343 | Characteristic to be deleted might still be used in cost ests -> check | Space: object requires documentation | |
214 | 344 | Customer enhancement is not active | Space: object requires documentation | |
215 | 345 | No function entries exist -> Check template customizing if required | Space: object requires documentation | |
216 | 346 | Model used in cost estimate -> characteristic cannot be deleted | Space: object requires documentation | |
217 | 347 | Incomplete resource - contact person responsible for planning form | Space: object requires documentation | |
218 | 348 | Characteristic &1 could not be interpreted | Space: object requires documentation | |
219 | 349 | You must enter a value for characteristic &1 | Space: object requires documentation | |
220 | 350 | Model &1 is not available | Space: object requires documentation | |
221 | 351 | Model &1 is being processed by user &2 | Space: object requires documentation | |
222 | 352 | Characteristic &1 is multiple value and cannot be assigned to a model | Space: object requires documentation | |
223 | 353 | Model &1 is either not available or inconsistent | Space: object requires documentation | |
224 | 354 | Either enter reference cost estimate or costing model | Space: object requires documentation | |
225 | 355 | First enter a costing model and then restart action | Space: object requires documentation | |
226 | 356 | New model | Space: object requires documentation | |
227 | 357 | First enter model description then restart action | Space: object requires documentation | |
228 | 358 | First enter a costing model | Space: object requires documentation | |
229 | 359 | Costing model & contains invalid characters | Space: object requires documentation | |
230 | 360 | Easy Cost Planning environment - you cannot access template directly | Space: object requires documentation | |
231 | 361 | Characteristic &1 has user-defined data cat: use in model not possible | Space: object requires documentation | |
232 | 362 | Cost element &1 in controlling area &2 does not exist | Space: object requires documentation | |
233 | 363 | Characteristic &1 allows interval value entry: use in model not possible | Space: object requires documentation | |
234 | 364 | You cannot use characteristic &1 in a template | Space: object requires documentation | |
235 | 365 | Inserted model & leads to cyclic use | Space: object requires documentation | |
236 | 366 | Enter the name of a costing model to be used as reference | Space: object requires documentation | |
237 | 367 | Model &1 has been deleted | Space: object requires documentation | |
238 | 368 | Model &1 is still being used and cannot be deleted | Space: object requires documentation | |
239 | 369 | Model &1 has been saved | Space: object requires documentation | |
240 | 370 | Model used in costings -> cannot be deleted or overwritten | Space: object requires documentation | |
241 | 371 | Derivation rules for model exist: model cannot be overwritten | Space: object requires documentation | |
242 | 372 | The name of the costing model must not begin with a number | Space: object requires documentation | |
243 | 373 | The status &2 for characteristic &1 is not available | Space: object requires documentation | |
244 | 374 | Characteristic &1 has not been released | Space: object requires documentation | |
245 | 375 | Characteristic &1 must not be used in costing models | Space: object requires documentation | |
246 | 376 | Model &1 exists already | Space: object requires documentation | |
247 | 377 | Either make or correct the necessary entry: &1 | Space: object requires documentation | |
248 | 378 | The cost estimate has been transferred | Space: object requires documentation | |
249 | 379 | Internal error: characteristic &1 is not assigned to class type 051 | Space: object requires documentation | |
250 | 380 | There is an inconsistency between the costing model and class | Space: object requires documentation | |
251 | 381 | Characteristic value &1 cannot be interpreted as a quantity | Space: object requires documentation | |
252 | 382 | Template &1 does not exist | Space: object requires documentation | |
253 | 383 | There is no external activity &1 in plant &2, purchasing organization &3 | Space: object requires documentation | |
254 | 384 | There is no subcontracting &1 in plant &2, purchasing organization &3 | Space: object requires documentation | |
255 | 385 | Choose a name for the target model other than that in the template | Space: object requires documentation | |
256 | 386 | Costing model &3 is currently being used for a costing by user &4 | Space: object requires documentation | |
257 | 387 | Ensure the derivation rules and entry screen are current | Space: object requires documentation | |
258 | 388 | Costing model is not allowed for this template environment | Space: object requires documentation | |
259 | 389 | Maintain the classification status for class type 051 | Space: object requires documentation | |
260 | 390 | Model has been created | Space: object requires documentation | |
261 | 391 | Model &1 relates to controlling area &2 | Space: object requires documentation | |
262 | 392 | Internal error; there is no model valuation & | Space: object requires documentation | |
263 | 393 | Cost estimate too large for Microsoft Excel | ||
264 | 394 | You need Microsoft Windows to cost using Microsoft Excel | ||
265 | 395 | Costing using Microsoft Excel is not allowed | ||
266 | 396 | Reference cost estimate was created using Microsoft Excel | ||
267 | 397 | Cost estimate was created using Microsoft Excel | ||
268 | 398 | The link to Microsoft Excel was unsuccessful | ||
269 | 399 | ***** Error messages SAPMK70D ********* | ||
270 | 400 | Enter a foreign currency (header) | Space: object requires documentation | |
271 | 401 | Currency & cannot be translated into & | ||
272 | 402 | Item category & not allowed | ||
273 | 403 | The cursor is not within a valid area | ||
274 | 404 | Cost estimate closed by user & | ||
275 | 405 | System error: RK70K-AKTYP not in internal control table | ||
276 | 406 | Text for reference object not defined in table TKKEX | ||
277 | 407 | Unit of measure & cannot be converted into & | ||
278 | 408 | Text for costing header & & & does not exist | ||
279 | 409 | Cost estimate already closed | ||
280 | 410 | No costing items exist | ||
281 | 411 | Texts for costing items incomplete | ||
282 | 412 | Controlling area & does not exist | ||
283 | 413 | Select an item | Space: object requires documentation | |
284 | 414 | Select end of block | Space: object requires documentation | |
285 | 415 | No text exists in language & | ||
286 | 416 | Base planning object &/& does not exist | Space: object requires documentation | |
287 | 417 | No text exists for base planning object &/& in language & | Space: object requires documentation | |
288 | 418 | Entry & & not in price table | ||
289 | 419 | No text for price component & & | ||
290 | 420 | Distribution not possible for item category & | ||
291 | 421 | Cost estimate closed by & | ||
292 | 422 | Lot size was not changed | ||
293 | 423 | Lot size changed | ||
294 | 424 | No items exist | ||
295 | 425 | No items were cut | ||
296 | 426 | & item(s) inserted | ||
297 | 427 | & item(s) deleted | ||
298 | 428 | & item(s) pasted from the clipboard | ||
299 | 429 | & item(s) copied into the clipboard | ||
300 | 430 | & item(s) moved to the clipboard | ||
301 | 431 | Enter unit of measure | Space: object requires documentation | |
302 | 432 | Base planning obj. has no unit of measure | ||
303 | 433 | Cost estimate saved temporarily | ||
304 | 434 | Costing item has no cost element | ||
305 | 435 | All cost elements were successfully determined | ||
306 | 436 | Not all cost elements could be determined | ||
307 | 437 | Cost elements were already maintained for all the relevant items | ||
308 | 438 | Cost elements were not fully maintained | ||
309 | 439 | Item &: Cost element cannot be maintained manually | ||
310 | 440 | Enter a consistent foreign currency for the items | Space: object requires documentation | |
311 | 441 | Enter foreign currency (header) | Space: object requires documentation | |
312 | 442 | No items were copied into the clipboard | ||
313 | 443 | Cost estimate was saved | ||
314 | 444 | You cannot use function & here | ||
315 | 445 | Base planning object cannot be saved - no unit of measure | Space: object requires documentation | |
316 | 446 | Units of measure not fully maintained | ||
317 | 447 | All item quantities will be deleted for lot size & | ||
318 | 448 | Costing quantity & not allowed | ||
319 | 449 | Exch. rate cannot be changed: Foreign cur. same as local cur. | ||
320 | 450 | No manual changes to price or price unit of items with structure allowed | Space: object requires documentation | |
321 | 451 | Unit price of cost estimate too large by & & | ||
322 | 452 | First item reached | ||
323 | 453 | Last item reached | ||
324 | 454 | Enter item category first | Space: object requires documentation | |
325 | 455 | You cannot display possible entries for this item category | ||
326 | 456 | Closing for cost estimate was reset | ||
327 | 457 | Item category & not allowed on this list screen | ||
328 | 458 | Base planning object &1/&2 is flagged for deletion | Space: object requires documentation | |
329 | 459 | Reducing the price unit may cause rounding errors | ||
330 | 460 | Item &: Origin group cannot be maintained manually | Space: object requires documentation | |
331 | 461 | Item &: Cost comp no. cannot be maintained manually | Space: object requires documentation | |
332 | 462 | Item &: Cost component no. was adapted to cost element | Space: object requires documentation | |
333 | 463 | Cost estimate marked | Space: object requires documentation | |
334 | 464 | Item &: Quantity cannot be maintained manually | Space: object requires documentation | |
335 | 465 | Item &: Unit of measure cannot be maintained manually | Space: object requires documentation | |
336 | 466 | Item &: Price cannot be maintained manually | Space: object requires documentation | |
337 | 467 | Item &: Resource cannot be maintained manually | Space: object requires documentation | |
338 | 468 | & item(s) copied into clipboard. Please note warnings in log | Space: object requires documentation | |
339 | 469 | Item &1: Error in assignment between cost element and cost component | Space: object requires documentation | |
340 | 470 | Item &1 cannot be changed. Cost element &2 is cost element for overhead. | Space: object requires documentation | |
341 | 471 | Item &1: Manual price change, item was not revaluated | Space: object requires documentation | |
342 | 472 | Item &1: Manual price change was reset | Space: object requires documentation | |
343 | 473 | Warning messages have been issued - see log | Space: object requires documentation | |
344 | 474 | Fixed costs invalid - entry deleted | Space: object requires documentation | |
345 | 475 | Fixed costs invalid - entry deleted | Space: object requires documentation | |
346 | 476 | Fixed costs invalid - entry deleted | Space: object requires documentation | |
347 | 477 | Fixed costs invalid - entry deleted | Space: object requires documentation | |
348 | 478 | Cost element not valid here - cost component deleted | Space: object requires documentation | |
349 | 479 | In line &1, the technical field &2 was deleted | Space: object requires documentation | |
350 | 480 | Costing items of type I (raw material costing) cannot be changed | Space: object requires documentation | |
351 | 481 | Cost element &1 predefined in base planning object &2/&3 | Space: object requires documentation | |
352 | 482 | Cost element &1 specified in resource | Space: object requires documentation | |
353 | 496 | No price exists in the planning currency | ||
354 | 497 | No price exists in the transaction currency | ||
355 | 498 | Exchange rate type & does not exist | ||
356 | 499 | Currency & does not exist | ||
357 | 500 | Currency & cannot be converted into currency & | ||
358 | 501 | Material & does not exist | ||
359 | 502 | Material & does not exist in plant & | ||
360 | 503 | Plant & is not assigned to company code & | ||
361 | 504 | Plant & is not assigned to controlling area & | ||
362 | 505 | Specify plant | Space: object requires documentation | |
363 | 506 | Process material & from plant & not allowed | ||
364 | 507 | No items carrying costs exist - graphic cannot be displayed | Space: object requires documentation | |
365 | 508 | Entry of resource for item category &1 is not sufficient | Space: object requires documentation | |
366 | 509 | Not all entries from the selected data record have been transferred | Space: object requires documentation | |
367 | 550 | Total value too high - please correct your entries | Space: object requires documentation | |
368 | 551 | Error in percentage calculation - total percentage set to 0 | Space: object requires documentation | |
369 | 552 | Target values copied | Space: object requires documentation | |
370 | 553 | Target values NOT copied | Space: object requires documentation | |
371 | 554 | Unit of measure was not changed | Space: object requires documentation | |
372 | 555 | Unit of measure was changed | Space: object requires documentation | |
373 | 556 | Value could not be calculated from percentage | Space: object requires documentation | |
374 | 557 | Target value could not be calculated | Space: object requires documentation | |
375 | 558 | Unit of measure NOT changed due to & | Space: object requires documentation | |
376 | 559 | Total value cannot be displayed (too high) | Space: object requires documentation | |
377 | 560 | Double entry: percentage entry ignored | Space: object requires documentation | |
378 | 561 | Formula contains errors | Space: object requires documentation | |
379 | 562 | Error when calculating formula | Space: object requires documentation | |
380 | 563 | Conversion from & to & not possible | Space: object requires documentation | |
381 | 564 | Formula cannot be entered due to internal error | Space: object requires documentation | |
382 | 565 | Calculated value is to high and needs to be corrected | Space: object requires documentation | |
383 | 600 | Internal error: & & & & | ||
384 | 601 | Internal error: Transaction type & invalid | ||
385 | 602 | Internal error: data combination (call) | Space: object requires documentation | |
386 | 603 | Internal error: unexpected return code | Space: object requires documentation | |
387 | 618 | Warnings issued for formula calculation - see error log | Space: object requires documentation | |
388 | 619 | Formula refers to automatically generated item(s) | Space: object requires documentation | |
389 | 620 | Syntax error in formula &1 | ||
390 | 621 | Formula too complex: &1 | ||
391 | 622 | Incorrect reference in formula &1 | ||
392 | 623 | Incorrect reference or cyclical reference in formula &1 | ||
393 | 624 | Formula not permissible for item category &1 | Space: object requires documentation | |
394 | 625 | Division by zero in formula &1 | ||
395 | 626 | Error in formula &1 | ||
396 | 627 | Invalid use of constant values in formula &1 | Space: object requires documentation | |
397 | 628 | Total not allowed with item category &1 | Space: object requires documentation | |
398 | 630 | Cost center &1 transferred from work center | Space: object requires documentation | |
399 | 631 | Enter work center and plant of the work center | Space: object requires documentation | |
400 | 632 | No cost center assigned to work center &1 in plant &2 | Space: object requires documentation | |
401 | 633 | Work center ID &1 in line &2 not found | Space: object requires documentation | |
402 | 639 | Process costs were deleted | Space: object requires documentation | |
403 | 640 | Error when determining process costs -> Error log | Space: object requires documentation | |
404 | 641 | Process costs not determined -> Error log | Space: object requires documentation | |
405 | 650 | Raw materials costs determined successfully | Space: object requires documentation | |
406 | 651 | Raw materials costs were deleted | Space: object requires documentation | |
407 | 652 | No raw materials costs determined | Space: object requires documentation | |
408 | 653 | Error when determining raw materials costs -> Error log | Space: object requires documentation | |
409 | 654 | Raw materials costs were deleted | Space: object requires documentation | |
410 | 661 | No costing items were revaluated | ||
411 | 662 | Lot size was changed in sales document. Cost estimate is adjusted | ||
412 | 663 | Pricing date was changed in sales document. Adjust cost estimate | ||
413 | 664 | Fixed price/value exceeds total price/value | ||
414 | 665 | Item & : Invalid item category & | ||
415 | 666 | Item & : Value too large by & & | ||
416 | 667 | Item & : Value too small by & & | ||
417 | 668 | Item & : Subtotal too large by & & | ||
418 | 669 | Item & : Subtotal too small by & & | ||
419 | 670 | Grand total too large by & & | ||
420 | 671 | Grand total too small by & & | ||
421 | 672 | Item & : Quantity too large | ||
422 | 673 | Foreign cur. amount too large by & & | ||
423 | 674 | Costing foreign currency was changed | ||
424 | 675 | Foreign currency amount too small by & & | ||
425 | 676 | Item & : Price too large by & & | ||
426 | 677 | Item & : Price too small by & & | ||
427 | 678 | Costing header foreign currency was not changed | ||
428 | 679 | Item foreign currency was not changed | ||
429 | 680 | Cost element not allowed for costing variant & | Space: object requires documentation | |
430 | 681 | Cost element was deleted | ||
431 | 682 | Cost estimate was revalued | ||
432 | 683 | Item foreign currency was changed | ||
433 | 684 | Overhead rate too large by & & | ||
434 | 685 | Overhead successfully calculated | ||
435 | 686 | Overhead rates deleted | ||
436 | 687 | No overhead rates calculated | ||
437 | 688 | Overhead cannot be applied | ||
438 | 689 | Item & : Cost element & does not exist in CO area & for & | ||
439 | 690 | Enter cost element | Space: object requires documentation | |
440 | 691 | Ref. unit of measure & cannot be converted into unit of measure & | ||
441 | 692 | Qty does not meet requirements of the unit of measure | ||
442 | 693 | Item &: Cost element does not match planned cost element | ||
443 | 694 | Item & : Cost element & has an invalid cost element category | ||
444 | 695 | Item & : Item indicator & not allowed | ||
445 | 696 | Foreign currency (or currencies) successfully changed | ||
446 | 697 | Foreign currency (or currencies) not changed. See error log | ||
447 | 698 | Do not enter both an exchange rate and an exchange rate date/type | Space: object requires documentation | |
448 | 699 | No foreign currency or currencies entered | ||
449 | 700 | Select the items relevant to processing | Space: object requires documentation | |
450 | 701 | No costing variant was selected | ||
451 | 702 | Overflow. See error log | ||
452 | 703 | Lot size was not changed. See error log | ||
453 | 704 | You cannot currently exit after only temporarily saving. See error log | ||
454 | 705 | Costing header foreign currency was not changed. See error log | ||
455 | 706 | Item foreign currency was not changed. See error log | ||
456 | 707 | Cost estimate could not be revalued. See error log | ||
457 | 708 | No items were added. See error log | ||
458 | 709 | No overhead was calculated - see error log | Space: object requires documentation | |
459 | 710 | Cost estimate could not be referenced. See error log | ||
460 | 711 | Cost estimate could not be adjusted. See error log | ||
461 | 712 | Total value of cost estimate changed. See error log | ||
462 | 713 | Base object explosion could not be carried out. See error log | Space: object requires documentation | |
463 | 714 | Not all cost elements could be determined. See error log | ||
464 | 715 | Error while processing formulas. See error log | ||
465 | 716 | Function could not be executed. See error log | ||
466 | 717 | Function successfully executed. See log | ||
467 | 718 | Messages have been issued. Please refer to the error log. | Space: object requires documentation | |
468 | 719 | Cost estimate successfully revaluated: Warnings -> Error log | Space: object requires documentation | |
469 | 720 | **** Messages for Base Planning Object Overview *** | Space: object requires documentation | |
470 | 721 | No base planning objects could be selected | Space: object requires documentation | |
471 | 722 | Select a valid line | Space: object requires documentation | |
472 | 723 | No cost estimate found for base planning object &1 | Space: object requires documentation | |
473 | 724 | Place the cursor on the required base planning object | Space: object requires documentation | |
474 | 730 | ***** Messages for Base Object Explosion / Material Explosion ******* | Space: object requires documentation | |
475 | 731 | No cost estimate found for &1 &2 | ||
476 | 732 | No costing item found for &3 &1 | ||
477 | 733 | The price of base planning object &1 has changed | Space: object requires documentation | |
478 | 734 | Error when reading &1 &2 explosion level: &3 | ||
479 | 735 | Cyclic use found for base planning object &1 | Space: object requires documentation | |
480 | 736 | No base planning objects selected for explosion | Space: object requires documentation | |
481 | 737 | No base planning objects exist for explosion | Space: object requires documentation | |
482 | 738 | Base planning object &1: Overhead deleted | Space: object requires documentation | |
483 | 739 | Enter a valid number of explosion levels | Space: object requires documentation | |
484 | 740 | Item quantity was rounded | ||
485 | 741 | Base object explosion successfully executed | Space: object requires documentation | |
486 | 742 | Base planning object &1 in CO area &2 does not exist | Space: object requires documentation | |
487 | 743 | Costing variant &1 does not exist | ||
488 | 744 | Base planning object &1: Overflow | Space: object requires documentation | |
489 | 745 | Item qty converted from &1 &2 to &3 &4 | ||
490 | 746 | No overhead costs were calculated | Space: object requires documentation | |
491 | 747 | There is no plant &2 in controlling area &1 | Space: object requires documentation | |
492 | 748 | Mixed cost estimate in explosion level &1 for material &2 plant &3 | Space: object requires documentation | |
493 | 749 | Mixed cost estimate exists: maximum of &1 explosion level(s) possible | Space: object requires documentation | |
494 | 750 | ***** Messages for Where-Used List of Base Planning Objects ****** | Space: object requires documentation | |
495 | 751 | No usage found for base planning object & & | Space: object requires documentation | |
496 | 752 | No selection made for where-used list | ||
497 | 753 | Controlling area has been changed | ||
498 | 799 | ***** End of Unit Costing Error Messages - Fuction Module *********** | ||
499 | 800 | ********** Error Messages for Unit Costing EXCEL Link *************** | ||
500 | 801 | Unit of measure & has not been created in language & | ||
501 | 802 | Cost element & has an invalid cost element category | ||
502 | 803 | Cost element & in CO area & does not exist for & | ||
503 | 804 | Item &: Invalid entries for item category & deleted | ||
504 | 805 | No possible entries available for this field | ||
505 | 806 | Item &: costing variant requires a cost element | ||
506 | 807 | Item &: costing variant does not allow a cost element | ||
507 | 808 | Material & is not assigned to a valid plant | ||
508 | 809 | Cost center & controlling area & on & not assiged to activity types | ||
509 | 810 | Enter a purchasing group | Space: object requires documentation | |
510 | 811 | Enter the material group for a purchase requisition without material no. | Space: object requires documentation | |
511 | 812 | Non-deletable items (J, G or X categories) were inserted again | The short text describes the object sufficiently | |
512 | 813 | No information available for the selected item | The short text describes the object sufficiently | |
513 | 895 | The data is either incomplete or inconsistent | Space: object requires documentation | |
514 | 896 | Data is consistent | Space: object requires documentation | |
515 | 897 | This function is not yet supported | ||
516 | 898 | & & & & | ||
517 | 899 | ****** End of Unit Costing Error Messages 000 - 899 *********** | ||
518 | 999 | *****Last of error messages for unit costing 000 - 999 ******** |
History
Last changed on/by | 19970723 | SAP | |
SAP Release Created in |