SAP ABAP Message Class C+ Message Number 819 (Price change not possible for material &1 &2 in the previous month)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CKML (Package) Material ledger
Attribute
Message class C+  
Short Description Material ledger messages    
Message Number 819  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20130531   
Message Text
Price change not possible for material &1 &2 in the previous month
Help Document

Diagnosis

You want to either change the price of material with valuation type in valuation area in the previous month or you want to release a planned price. This, however, is not possible for materials with price determination indicator 3.

Price determination indicator 3 requires the standard price to remain constant throughout the period, so that all movements are valuated preliminarily with the same price. Therefore, the standard price can only be changed at the beginning of a period, before any actual data can be created.

System Response

The system does not allow the price change or the release of the planned prices for this material in the previous period.

Procedure

Procedure for System Administration

In order to release your planned prices automatically upon the creation of new actual data, you can allow dynamic price release in Customising for the component Actual Costing/Material Ledger.

History
Last changed on/by 20140121  SAP 
SAP Release Created in