SAP ABAP Message Class C+ Message Number 818 (Multi-level price determination is not possible)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CKML (Package) Material ledger
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CKML (Package) Material ledger
Attribute
Message class | C+ | ||
Short Description | Material ledger messages | ||
Message Number | 818 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20130531 |
Message Text
Multi-level price determination is not possible
Help Document
Diagnosis
Material with valuation type in valuation area was used as an input material in the period. It appears in the same cycle as the output material to be costed.
You can perform multi-level price determination for the corresponding output material only if the input material has the status Price determined single-level or Closing entry reversed.
The input material, though, has status .
System Response
The system does not allow the multi-level price determination.
Procedure
Perform single-level price determination for the input material.
History
Last changed on/by | 20140121 | SAP | |
SAP Release Created in |