Hierarchy

⤷

⤷

⤷

Attribute
Message class | ![]() |
C+ | |
Short Description | ![]() |
Material ledger messages | |
Message Number | ![]() |
811 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20130531 |
Message Text
Help Document
Diagnosis
You want to change the price or release planned prices for material with valuation type in valuation area . You have, however, already entered actual data or performed a single-level price determination in the period concerned. The status of the material in the period is .
Price determination indicator 3 assumes that the standard price remains constant throughout the period, so that all movements can be valuated preliminarily with the same standard price. Therefore, you can only change the standard price at the beginning of a period (i.e. as long as no actual data was entered).
System Response
The system does not allow the price changes or the release of planned prices for this material in this period.
Procedure for System Administration
In the future, to automatically release your planned prices upon creation of new actual data you can allow dynamic price release in Customizing for Actual Costing/Material Ledger.
History
Last changed on/by | ![]() |
20140121 | SAP |
SAP Release Created in |