SAP ABAP Message Class C+ Message Number 302 (Material ledger not active in plant &)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CKML (Package) Material ledger
Attribute
Message class C+  
Short Description Material ledger messages    
Message Number 302  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20130531   
Message Text
Material ledger not active in plant &
Help Document

Diagnosis

Data in plant can only be prepared for the material ledger if the material ledger is set as active.

System Response

No data will be prepared for the material ledger.

Procedure

If you want the material ledger to be active in plant and you want to prepare the data, use the Product Cost Controlling section of Customizing to activate the material ledger for this plant.

History
Last changed on/by 20140121  SAP 
SAP Release Created in