SAP ABAP Message Class C+ Message Number 040 (Currency was not defined at production startup)
Hierarchy
☛ BBPCRM (Software Component) BBPCRM
   ⤷ CRM (Application Component) Customer Relationship Management
     ⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       ⤷ CKML (Package) Material ledger
Attribute
Message class C+  
Short Description Material ledger messages    
Message Number 040  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20130531   
Message Text
Currency was not defined at production startup
Help Document

Diagnosis

You have set the material ledger to productive in valuatione area . Nevertheless, information about the currency settings at the time of production startup are missing.

System Response

The system cannot ensure data consistency, since it is not possible to compare the current currency settings with those made at production startup.

Procedure

  1. Make sure that the currency settings have not been changed since material ledger production startup in valuation area .
  2. Inform your system administrator.

History
Last changed on/by 20140121  SAP 
SAP Release Created in