SAP ABAP Message Class BK Message Number 125 (Posting date is not within validity period of run schedule &)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KBAS (Package) Overhead Cost Controlling
Attribute
Message class BK  
Short Description Create, Display, Reverse Controlling Document    
Message Number 125  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Posting date is not within validity period of run schedule &
Help Document

Diagnosis

You can only post run schedule headers if the posting date falls within its validity period.
Posting date of the cost accounting document is outside the validity period of run schedule header .

System Response

The run schedule header entered cannot be posted.

Procedure

  1. Enter a different run schedule header with a validity period that includes posting date .
  2. Alternately, delete your entries.

History
Last changed on/by 20100310  SAP 
SAP Release Created in