SAP ABAP Message Class AJ Message Number 891 (Consumption information for negative consumption difference)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20 (Package) IS-U: Billing
Attribute
Message class AJ  
Short Description Billing program    
Message Number 891  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
Consumption information for negative consumption difference
Help Document

Diagnosis

As described in the previous message AH-653, the total consumption from the secondary meter is larger than the consumption from the primary meter for a specific period.

  • Consumption from primary meter:
  • Consumption from secondary meter:

Procedure

When prorations in the billing period cause consumption from secondary meters to be distributed differently to the consumption from the primary meter, it can be useful if you enter an interim meter reading for the primary meter on the proration date. This message helps you find the appropriate interim meter reading.

Procedure for System Administration

History
Last changed on/by 20110810  SAP 
SAP Release Created in