Hierarchy

⤷

⤷

Attribute
Message class | ![]() |
AJ | |
Short Description | ![]() |
Billing program | |
Message Number | ![]() |
885 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Help Document
Diagnosis
An interval check (interval of secondary installation before meter reading date, interval of secondary installation after meter reading date) was executed for the billing order with the key (installation, scheduled meter reading date, billing transaction). This is because the installation is a secondary installation of primary installation .
The comparative billing order in the primary installation with the allocation date has as the end of the billing period.
The meter readings from the secondary installation produce a billing period end that is outside of the interval.
System Response
Procedure
Check all meter readings for the secondary installation. Correct the meter reading dates, or use transaction EL60 or EL61 to allocate the meter readings to other installations.
Start the procedure again.
Procedure for System Administration
History
Last changed on/by | ![]() |
20110810 | SAP |
SAP Release Created in |