SAP ABAP Message Class AJ Message Number 625 (An actual meter reading result must be followed by recalculation)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing

⤷

⤷

Attribute
Message class | ![]() |
AJ | |
Short Description | ![]() |
Billing program | |
Message Number | ![]() |
625 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
An actual meter reading result must be followed by recalculation
Help Document
Diagnosis
You are using schema with dynamic period control. The category of period to be created is included in the current billing. This means that an actual meter reading result was entered and you must correct the period since the last actual meter reading and then bill it. In Customizing of dynamic period control, you must enter at least one period to be created for categories 3000 and 4000 that bills a backbilling period.
System Response
Procedure
You must adjust the Customizing for dynamic period control for schema and category .
Procedure for System Administration
History
Last changed on/by | ![]() |
20110810 | SAP |
SAP Release Created in |