SAP ABAP Message Class AJ Message Number 625 (An actual meter reading result must be followed by recalculation)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20 (Package) IS-U: Billing
Attribute
Message class AJ  
Short Description Billing program    
Message Number 625  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
An actual meter reading result must be followed by recalculation
Help Document

Diagnosis

You are using schema with dynamic period control. The category of period to be created is included in the current billing. This means that an actual meter reading result was entered and you must correct the period since the last actual meter reading and then bill it. In Customizing of dynamic period control, you must enter at least one period to be created for categories 3000 and 4000 that bills a backbilling period.

System Response

Procedure

You must adjust the Customizing for dynamic period control for schema and category .

Procedure for System Administration

History
Last changed on/by 20110810  SAP 
SAP Release Created in