SAP ABAP Message Class AJ Message Number 604 (No proration due to incorrect schema setup for dynamic period control)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20 (Package) IS-U: Billing
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20 (Package) IS-U: Billing
Attribute
Message class | AJ | ||
Short Description | Billing program | ||
Message Number | 604 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050224 |
Message Text
No proration due to incorrect schema setup for dynamic period control
Help Document
Diagnosis
You are using the dynamic period control.
The quantity cannot be consistently distributed because the underlying billing schema has been structured incorrectly.
The lowest from-date in distribution table does not match the lowest original from-date (schema step CSNO = ) of all schema steps to be considered together.
This is probably because during re-estimation for a certain period category, the period whose real meter reading results were to be used for the re-estimation was not structured at the same time.
This is generally a period of base period category 3.
System Response
Procedure
- Check your schema.
- If you cannot detect any errors, contact SAP.
Procedure for System Administration
History
Last changed on/by | 20110810 | SAP | |
SAP Release Created in |