SAP ABAP Message Class AJ Message Number 576 (Backbilling group &1 in step &2 is inconsistent)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing

⤷

⤷

Attribute
Message class | ![]() |
AJ | |
Short Description | ![]() |
Billing program | |
Message Number | ![]() |
576 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Backbilling group &1 in step &2 is inconsistent
Help Document
Diagnosis
The following error is in schema step :
- You use dynamic backbilling group for an indicator to execute dynamic period control. However, there are no schema steps for this group that need to be backbilled.
- You use group for an assignment indicator or a reversal indicator. However, there is no schema step that triggers this backbilling. ,
System Response
The schema inconsistent and cannot be saved.
Procedure
Proceed as follows, depending on the reason for error:
- Use a different group in step or assign at least one more schema step to this group.
- Use a different group in step or insert a schema step that triggers the backbilling of this group.
History
Last changed on/by | ![]() |
20110810 | SAP |
SAP Release Created in |