SAP ABAP Message Class AJ Message Number 300 (More than one value was updated for operand &1)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing

⤷

⤷

Attribute
Message class | ![]() |
AJ | |
Short Description | ![]() |
Billing program | |
Message Number | ![]() |
300 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
More than one value was updated for operand &1
Help Document
Diagnosis
Operand is updated by means of update type 2. A value from the periodic billing period is updated to the correction periods.
The periodic billing period and the correction periods belong to different periods. Therefore, changes to the operand value in the periodic billing period cannot be transferred to the correction periods because of the time slices. For this reason the system checks during the update whether exactly one value is being updated.
This is not the case here: values were updated.
System Response
Procedure
- Ensure in the rate and schema structure that operand has only one value in this rate step.
- If the operand from the facts is provided with a value, use an access control that selects only one value in the billing period.
Procedure for System Administration
History
Last changed on/by | ![]() |
20110810 | SAP |
SAP Release Created in |