SAP ABAP Message Class AH Message Number 710 (Period control and specification of billing period are inconsistent)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing
⤷
⤷
Attribute
| Message class | AH | ||
| Short Description | IS-U billing (master data) | ||
| Message Number | |
710 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20050224 |
Message Text
Period control and specification of billing period are inconsistent
Help Document
Diagnosis
If you choose month-based using an interval as the period control for a rate step (rate = ), you must specify the billing period in months or years in the portion (portion = ).
System Response
Procedure
You have the following options:
- Use a different period control in the rate.
- Specify the billing period in months or years.
History
| Last changed on/by | 20110810 | SAP | |
| SAP Release Created in |