SAP ABAP Message Class AH Message Number 607 (Specify the difference between periodic billing and period-end billing)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20 (Package) IS-U: Billing
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20 (Package) IS-U: Billing
Attribute
Message class | AH | ||
Short Description | IS-U billing (master data) | ||
Message Number | 607 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Specify the difference between periodic billing and period-end billing
Help Document
Diagnosis
You have determined that a separate period-end billing is to be carried out. Therefore, you must specify the difference (in days) between the last periodic billing and the period-end billing.
System Response
Procedure
Specify the difference (in days) between the last periodic billing and the period-end billing.
History
Last changed on/by | 20110810 | SAP | |
SAP Release Created in |