SAP ABAP Message Class AH Message Number 607 (Specify the difference between periodic billing and period-end billing)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing
⤷
⤷
Attribute
| Message class | AH | ||
| Short Description | IS-U billing (master data) | ||
| Message Number | |
607 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
Specify the difference between periodic billing and period-end billing
Help Document
Diagnosis
You have determined that a separate period-end billing is to be carried out. Therefore, you must specify the difference (in days) between the last periodic billing and the period-end billing.
System Response
Procedure
Specify the difference (in days) between the last periodic billing and the period-end billing.
History
| Last changed on/by | 20110810 | SAP | |
| SAP Release Created in |