SAP ABAP Message Class KK (KK)
Basic Data
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-CIC (Application Component) Interaction Center WinClient
⤷
KKEK (Package) Cost accounting unit costing
⤷
⤷
Attributes
| Message class | KK | |
| Short Description | ||
| Changed On | 19970723 | |
| Last Changed At | 135621 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | ********* Unit Costing Error Messages 000 - 999 *************** | |||
| 2 | Controlling area & does not exist | |||
| 3 | Base planning object & & already exists | Space: object requires documentation | ||
| 4 | Base planning object & & does not exist | Space: object requires documentation | ||
| 5 | No texts for cost estimate & & in language & | |||
| 6 | Base planning object &1 &2 does not exist | Space: object requires documentation | ||
| 7 | No texts for reference & & in language & | |||
| 8 | Base planning object &1 &2 does not exist | Space: object requires documentation | ||
| 9 | Base planning object & may already have been archived | Space: object requires documentation | ||
| 10 | Cost element & in CO area & does not exist for & | |||
| 11 | Company code & is not assigned to controlling area & | |||
| 12 | Plant & is not assigned to company code & | |||
| 13 | Cost estimate & & for object destroyed (saving not possible) | |||
| 14 | Data for base planning object & & was saved | Space: object requires documentation | ||
| 15 | Import of cost estimate failed (notify system administrator) | |||
| 16 | Cost estimate & & already exists (no saving allowed) | |||
| 17 | Base planning object & & was saved | Space: object requires documentation | ||
| 18 | Base planning object & is locked by user & | Space: object requires documentation | ||
| 19 | System error: Lock table overflow | |||
| 20 | Internal error: & is not a valid activity type | |||
| 21 | Transaction & cannot be processed in base object costing | Space: object requires documentation | ||
| 22 | Base planning object name contains invalid characters | Space: object requires documentation | ||
| 23 | Reference order & does not exist | |||
| 24 | Enter one reference object | Space: object requires documentation | ||
| 25 | Reference order & is not assigned to controlling area & | |||
| 26 | Reference project & does not exist | |||
| 27 | Reference project & is not assigned to controlling area & | |||
| 28 | No cost estimate exists for reference order & for & | |||
| 29 | No cost estimate exists for reference project & for & | |||
| 30 | No unit cost estimate exists for reference & | Space: object requires documentation | ||
| 31 | Plant & does not exist | |||
| 32 | Company code & does not exist | |||
| 33 | No total value cost estimate exists for reference order & | |||
| 34 | No total value cost estimate exists for reference project & | |||
| 35 | Cost element & has an invalid cost element category | |||
| 36 | No cost estimate exists for the reference material | |||
| 37 | Enter company code or plant | Space: object requires documentation | ||
| 38 | Internal error: Update not possible | |||
| 39 | Reference cost estimate not allowed | |||
| 40 | Cost object & to be copied does not exist | |||
| 41 | Cost object & to be copied is not assigned to CO area & | |||
| 42 | No cost estimate exists for cost object & to be copied | |||
| 43 | No cost estimate exists for material & to be copied | |||
| 44 | Enter valid costing date and/or version | Space: object requires documentation | ||
| 45 | No cost estimate exists for sales document &, item & | |||
| 46 | Sales document & item & does not exist | |||
| 47 | Costing sheet not available for base planning objects or ad hoc cost est | Space: object requires documentation | ||
| 48 | First enter the costing sheet | Space: object requires documentation | ||
| 49 | Enter costing sheet | Space: object requires documentation | ||
| 50 | Costing reference object & not allowed | |||
| 51 | No entry in table & | |||
| 52 | The source and target tables have different numbers of entries | |||
| 53 | The keys of the source and target tables are the same | |||
| 54 | Cost estimate with key: & does not exist | |||
| 55 | Internal program error: & | |||
| 56 | Overhead key & not available in costing sheet & | |||
| 57 | Cost estimate could not be selected | |||
| 58 | More than one cost estimate has the key & | |||
| 59 | Data relevant to costing was changed. Adjust cost estimate | |||
| 60 | No overhead key exists for costing sheet & | |||
| 61 | No authorization to create base planning obj. in controlling area & | Space: object requires documentation | ||
| 62 | No authorization to change base planning obj. in controlling area & | Space: object requires documentation | ||
| 63 | No authorization to display base planning obj. in controlling area & | Space: object requires documentation | ||
| 64 | No authorization for authorization object &, activity &, CO area & | |||
| 65 | Object &1 / &2 does not exist | Space: object requires documentation | ||
| 66 | Profit center &1 does not exist in controlling area &2 | Space: object requires documentation | ||
| 67 | Unit cost estimate &1 does not exist | Space: object requires documentation | ||
| 68 | Base planning object group &2 is not valid in controlling area &1 | Space: object requires documentation | ||
| 69 | *** Messages for Table Control ***************************************** | |||
| 70 | Width of selected columns changed | |||
| 71 | Column width setting canceled | |||
| 72 | Shifted columns cannot be fixed | |||
| 73 | Select column(s) | Space: object requires documentation | ||
| 74 | Characteristic & has already been assigned | Space: object requires documentation | ||
| 75 | Feature & does not exist | Space: object requires documentation | ||
| 76 | & is not a valid characteristic name | Space: object requires documentation | ||
| 77 | Internal error: no HTML template has been found for model & | Space: object requires documentation | ||
| 78 | Object & is not in the Web Repository | Space: object requires documentation | ||
| 79 | No HTML template has yet been saved for this costing model | Space: object requires documentation | ||
| 80 | ********* Error messages for multilevel unit costing ******************** | Space: object requires documentation | ||
| 81 | Multilevel unit costing is at the pilot stage | Space: object requires documentation | ||
| 82 | Index &1 for table &2 does not yet exist | Space: object requires documentation | ||
| 83 | Index is already available. | Space: object requires documentation | ||
| 84 | Index was sucessfully created. | Space: object requires documentation | ||
| 85 | An item cannot be deleted from an automatic cost estimate | Space: object requires documentation | ||
| 86 | The objects selected cannot be inserted inside each other | Space: object requires documentation | ||
| 87 | Multilevel unit costing requires a WIN32 frontend | Space: object requires documentation | ||
| 88 | A tree control could not be generated. | Space: object requires documentation | ||
| 89 | The Drag and Drop function could not be initialized. | Space: object requires documentation | ||
| 90 | Program inconsistency: Node &1 does not exist. | Space: object requires documentation | ||
| 91 | Error when communicating with a tree control. | Space: object requires documentation | ||
| 92 | No materials/material cost estimates found | Space: object requires documentation | ||
| 93 | Material cost estimate for material &1 is locked by user &2 | Space: object requires documentation | ||
| 94 | Inconsistent internal node type | Space: object requires documentation | ||
| 95 | Error messages have been issued. Please look in the log. | Space: object requires documentation | ||
| 96 | Cyclic structures cannot be costed | Space: object requires documentation | ||
| 97 | Base planning object & not found | Space: object requires documentation | ||
| 98 | Cost estimate already exists | Space: object requires documentation | ||
| 99 | Position the cursor on a valid line | Space: object requires documentation | ||
| 100 | Reference cost estimate has errors (see long text) -> no copy created | Space: object requires documentation | ||
| 101 | Material of reference cost estimate is configurable -> no copy created | Space: object requires documentation | ||
| 102 | Base planning object &1 contains base planning object &2 without item | Space: object requires documentation | ||
| 103 | Base planning object &1 does not have a costing item | Space: object requires documentation | ||
| 104 | Plant &1 is not in controlling area &2; no selection for this plant | Space: object requires documentation | ||
| 105 | No corresponding plant exists in controlling area &1 | Space: object requires documentation | ||
| 106 | No base planning object found for the selection criteria | Space: object requires documentation | ||
| 107 | No activity types in co. code &1 for the selection criteria entered | Space: object requires documentation | ||
| 108 | Mixed cost estimate not allowed as reference -> no copy | Space: object requires documentation | ||
| 109 | Cost est. for proc. alternatives not allowed as reference -> no copy | Space: object requires documentation | ||
| 110 | Cost ests for co-products not allowed as reference -> no copy | Space: object requires documentation | ||
| 111 | Reference cost estimate contains cycles and will not be copied | Space: object requires documentation | ||
| 112 | Costing variant &1 not allowed when creating cost estimate | Space: object requires documentation | ||
| 113 | Set a filter first in the unit costing list screen | Space: object requires documentation | ||
| 114 | Copying was canceled - data has not been changed | Space: object requires documentation | ||
| 115 | There is no suitable container in the worklist | Space: object requires documentation | ||
| 116 | Object was not inserted as it already exists in the structure | Space: object requires documentation | ||
| 117 | Container is item category-dependent - enter item category | Space: object requires documentation | ||
| 118 | Item category &1 is not permitted for container | Space: object requires documentation | ||
| 119 | Access to worklist &1 denied | Space: object requires documentation | ||
| 120 | Worklist &1 does not exist | Space: object requires documentation | ||
| 121 | Worklist(s) could not be saved | Space: object requires documentation | ||
| 122 | Worklists not read successfully | Space: object requires documentation | ||
| 123 | Contents of worklist &1 not read successfully -> default display | Space: object requires documentation | ||
| 124 | No worklist exists for which authorization is provided | Space: object requires documentation | ||
| 125 | Only &1 of the worklists specified can be deleted | Space: object requires documentation | ||
| 126 | Worklist was not deleted | Space: object requires documentation | ||
| 127 | Worklist(s) not found | Space: object requires documentation | ||
| 128 | Creation of worklist not authorized | Space: object requires documentation | ||
| 129 | Not all worklists were found | Space: object requires documentation | ||
| 130 | Action canceled | Space: object requires documentation | ||
| 131 | Worklist could not be created | Space: object requires documentation | ||
| 132 | Worklist is emtpy and so cannot be edited | Space: object requires documentation | ||
| 133 | Worklist was not renamed successfully | Space: object requires documentation | ||
| 134 | Lock error for new worklist &1 occurred &2 | Space: object requires documentation | ||
| 135 | Worklist &1 is currently locked for write access - saving not possible | Space: object requires documentation | ||
| 136 | Worklist was saved | Space: object requires documentation | ||
| 137 | Worklist created successfully | Space: object requires documentation | ||
| 138 | Worklist copied successfully | Space: object requires documentation | ||
| 139 | Worklist was renamed and saved under new name | Space: object requires documentation | ||
| 140 | Enter a valid name for the worklist | Space: object requires documentation | ||
| 141 | Content of worklist &1 was not read successfully | Space: object requires documentation | ||
| 142 | Temporary worklists and worklists with free text (still) not allowed | Space: object requires documentation | ||
| 143 | Worklist was deleted | Space: object requires documentation | ||
| 144 | Worklist name either not entered or not allowed -> worklist not created | Space: object requires documentation | ||
| 145 | Nothing deleted | Space: object requires documentation | ||
| 146 | Worklist is empty and so cannot be saved | Space: object requires documentation | ||
| 147 | Worklist is empty and so cannot be copied | Space: object requires documentation | ||
| 148 | Worklist is empty and so cannot be renamed | Space: object requires documentation | ||
| 149 | Worklist is empty and so cannot be deleted | Space: object requires documentation | ||
| 150 | User configuration for worklist was saved | Space: object requires documentation | ||
| 151 | Deletion not possible because container is not empty | Space: object requires documentation | ||
| 152 | Worklist already in display | Space: object requires documentation | ||
| 153 | Lock error has occurred for worklist &1 to be deleted | Space: object requires documentation | ||
| 154 | The new and old names of the worklist are identical | Space: object requires documentation | ||
| 155 | Worklist is empty and so cannot be converted | Space: object requires documentation | ||
| 156 | Nothing copied | Space: object requires documentation | ||
| 157 | Worklist &1 is locked by user &2 | Space: object requires documentation | ||
| 158 | System was unable to lock worklist &1 - saving not possible | Space: object requires documentation | ||
| 159 | Lock error occurred for worklist &1 - saving not possible | Space: object requires documentation | ||
| 160 | Worklist has since been changed and is therefore being read again | Space: object requires documentation | ||
| 161 | Place the cursor on a container in the worklist | Space: object requires documentation | ||
| 162 | Enter a valid container name | Space: object requires documentation | ||
| 163 | Container was deleted | Space: object requires documentation | ||
| 164 | Container was inserted | Space: object requires documentation | ||
| 165 | Enter a container name that does not already exist in the worklist | Space: object requires documentation | ||
| 166 | Worklist has since been deleted from the database (see long text) | Space: object requires documentation | ||
| 167 | Cost estimate for &1 was not saved -> cannot be saved in worklist | Space: object requires documentation | ||
| 168 | The sole container of a worklist cannot be deleted | Space: object requires documentation | ||
| 169 | **************** Error Messages for Unit Costing Conversion ************* | |||
| 170 | Enter either an order or a cost center | Space: object requires documentation | ||
| 171 | No unit costing doucments were found for conversion | |||
| 172 | No year-dependent data exists for CO area & & | |||
| 173 | Conversion of the unit costing documents unnecessary | |||
| 174 | No annual values for plan version & in this controlling area | |||
| 175 | Fiscal year variant & does not exist | |||
| 176 | & entered differs from controlling area & of order | |||
| 177 | Order & does not exist | |||
| 178 | Cost center & in year & does not exist | |||
| 179 | Controlling area & of order is used for further processing | |||
| 180 | Error when translating currency: Costing number & | |||
| 181 | Unit costing document & has been converted | |||
| 182 | Unit costing document &: Error when updating | |||
| 183 | Conversion of unit costing document & unnecessary | |||
| 184 | Unit costing document & (number from COKP file) does not exist | |||
| 185 | ***** Error Messages RK70K_RC ********* | |||
| 186 | Costing variant & is invalid | |||
| 187 | Internal error: Transaction type & invalid | |||
| 188 | Internal error: Input parameter combination invalid | |||
| 189 | Cost estimate & already exists | |||
| 190 | Cost estimate & does not exist | |||
| 191 | You have exceeded the maximum number of periods (16) | |||
| 192 | Costing variant & not in table TCK03 | |||
| 193 | Error in costing control table TCK01 | |||
| 194 | Error in costing control table TCK02 | |||
| 195 | Error in costing control table TCK03 | |||
| 196 | Error in costing control table TCK04 | |||
| 197 | Error in costing control table TCK05 | |||
| 198 | Error in costing control table TCK06 | |||
| 199 | Error in costing control table TCK12 | |||
| 200 | Error in costing control table TCK07 | Space: object requires documentation | ||
| 201 | Valuation variant in cost estimate does not match control table | |||
| 202 | Costing variant & does not exist for the reference object | |||
| 203 | Costing type & is not in table TCK01 | |||
| 204 | Planning currency does not exist | |||
| 205 | No cost estimate exists for base planning object & | Space: object requires documentation | ||
| 206 | Error when determining partner number | Space: object requires documentation | ||
| 207 | Additional conditions for object selection will be ignored | Space: object requires documentation | ||
| 208 | Only the first object value is included in each case | Space: object requires documentation | ||
| 209 | Decimal places (relevant for rounding) changed for unit of measure &1 | Space: object requires documentation | ||
| 210 | Process &1 relates to controlling area &2 | Space: object requires documentation | ||
| 211 | Cost center / activity type does not exist in controlling area &3 | Space: object requires documentation | ||
| 212 | Characteristic cannot be deleted | Space: object requires documentation | ||
| 213 | Characteristic to be deleted might still be used in cost ests -> check | Space: object requires documentation | ||
| 214 | Customer enhancement is not active | Space: object requires documentation | ||
| 215 | No function entries exist -> Check template customizing if required | Space: object requires documentation | ||
| 216 | Model used in cost estimate -> characteristic cannot be deleted | Space: object requires documentation | ||
| 217 | Incomplete resource - contact person responsible for planning form | Space: object requires documentation | ||
| 218 | Characteristic &1 could not be interpreted | Space: object requires documentation | ||
| 219 | You must enter a value for characteristic &1 | Space: object requires documentation | ||
| 220 | Model &1 is not available | Space: object requires documentation | ||
| 221 | Model &1 is being processed by user &2 | Space: object requires documentation | ||
| 222 | Characteristic &1 is multiple value and cannot be assigned to a model | Space: object requires documentation | ||
| 223 | Model &1 is either not available or inconsistent | Space: object requires documentation | ||
| 224 | Either enter reference cost estimate or costing model | Space: object requires documentation | ||
| 225 | First enter a costing model and then restart action | Space: object requires documentation | ||
| 226 | New model | Space: object requires documentation | ||
| 227 | First enter model description then restart action | Space: object requires documentation | ||
| 228 | First enter a costing model | Space: object requires documentation | ||
| 229 | Costing model & contains invalid characters | Space: object requires documentation | ||
| 230 | Easy Cost Planning environment - you cannot access template directly | Space: object requires documentation | ||
| 231 | Characteristic &1 has user-defined data cat: use in model not possible | Space: object requires documentation | ||
| 232 | Cost element &1 in controlling area &2 does not exist | Space: object requires documentation | ||
| 233 | Characteristic &1 allows interval value entry: use in model not possible | Space: object requires documentation | ||
| 234 | You cannot use characteristic &1 in a template | Space: object requires documentation | ||
| 235 | Inserted model & leads to cyclic use | Space: object requires documentation | ||
| 236 | Enter the name of a costing model to be used as reference | Space: object requires documentation | ||
| 237 | Model &1 has been deleted | Space: object requires documentation | ||
| 238 | Model &1 is still being used and cannot be deleted | Space: object requires documentation | ||
| 239 | Model &1 has been saved | Space: object requires documentation | ||
| 240 | Model used in costings -> cannot be deleted or overwritten | Space: object requires documentation | ||
| 241 | Derivation rules for model exist: model cannot be overwritten | Space: object requires documentation | ||
| 242 | The name of the costing model must not begin with a number | Space: object requires documentation | ||
| 243 | The status &2 for characteristic &1 is not available | Space: object requires documentation | ||
| 244 | Characteristic &1 has not been released | Space: object requires documentation | ||
| 245 | Characteristic &1 must not be used in costing models | Space: object requires documentation | ||
| 246 | Model &1 exists already | Space: object requires documentation | ||
| 247 | Either make or correct the necessary entry: &1 | Space: object requires documentation | ||
| 248 | The cost estimate has been transferred | Space: object requires documentation | ||
| 249 | Internal error: characteristic &1 is not assigned to class type 051 | Space: object requires documentation | ||
| 250 | There is an inconsistency between the costing model and class | Space: object requires documentation | ||
| 251 | Characteristic value &1 cannot be interpreted as a quantity | Space: object requires documentation | ||
| 252 | Template &1 does not exist | Space: object requires documentation | ||
| 253 | There is no external activity &1 in plant &2, purchasing organization &3 | Space: object requires documentation | ||
| 254 | There is no subcontracting &1 in plant &2, purchasing organization &3 | Space: object requires documentation | ||
| 255 | Choose a name for the target model other than that in the template | Space: object requires documentation | ||
| 256 | Costing model &3 is currently being used for a costing by user &4 | Space: object requires documentation | ||
| 257 | Ensure the derivation rules and entry screen are current | Space: object requires documentation | ||
| 258 | Costing model is not allowed for this template environment | Space: object requires documentation | ||
| 259 | Maintain the classification status for class type 051 | Space: object requires documentation | ||
| 260 | Model has been created | Space: object requires documentation | ||
| 261 | Model &1 relates to controlling area &2 | Space: object requires documentation | ||
| 262 | Internal error; there is no model valuation & | Space: object requires documentation | ||
| 263 | Cost estimate too large for Microsoft Excel | |||
| 264 | You need Microsoft Windows to cost using Microsoft Excel | |||
| 265 | Costing using Microsoft Excel is not allowed | |||
| 266 | Reference cost estimate was created using Microsoft Excel | |||
| 267 | Cost estimate was created using Microsoft Excel | |||
| 268 | The link to Microsoft Excel was unsuccessful | |||
| 269 | ***** Error messages SAPMK70D ********* | |||
| 270 | Enter a foreign currency (header) | Space: object requires documentation | ||
| 271 | Currency & cannot be translated into & | |||
| 272 | Item category & not allowed | |||
| 273 | The cursor is not within a valid area | |||
| 274 | Cost estimate closed by user & | |||
| 275 | System error: RK70K-AKTYP not in internal control table | |||
| 276 | Text for reference object not defined in table TKKEX | |||
| 277 | Unit of measure & cannot be converted into & | |||
| 278 | Text for costing header & & & does not exist | |||
| 279 | Cost estimate already closed | |||
| 280 | No costing items exist | |||
| 281 | Texts for costing items incomplete | |||
| 282 | Controlling area & does not exist | |||
| 283 | Select an item | Space: object requires documentation | ||
| 284 | Select end of block | Space: object requires documentation | ||
| 285 | No text exists in language & | |||
| 286 | Base planning object &/& does not exist | Space: object requires documentation | ||
| 287 | No text exists for base planning object &/& in language & | Space: object requires documentation | ||
| 288 | Entry & & not in price table | |||
| 289 | No text for price component & & | |||
| 290 | Distribution not possible for item category & | |||
| 291 | Cost estimate closed by & | |||
| 292 | Lot size was not changed | |||
| 293 | Lot size changed | |||
| 294 | No items exist | |||
| 295 | No items were cut | |||
| 296 | & item(s) inserted | |||
| 297 | & item(s) deleted | |||
| 298 | & item(s) pasted from the clipboard | |||
| 299 | & item(s) copied into the clipboard | |||
| 300 | & item(s) moved to the clipboard | |||
| 301 | Enter unit of measure | Space: object requires documentation | ||
| 302 | Base planning obj. has no unit of measure | |||
| 303 | Cost estimate saved temporarily | |||
| 304 | Costing item has no cost element | |||
| 305 | All cost elements were successfully determined | |||
| 306 | Not all cost elements could be determined | |||
| 307 | Cost elements were already maintained for all the relevant items | |||
| 308 | Cost elements were not fully maintained | |||
| 309 | Item &: Cost element cannot be maintained manually | |||
| 310 | Enter a consistent foreign currency for the items | Space: object requires documentation | ||
| 311 | Enter foreign currency (header) | Space: object requires documentation | ||
| 312 | No items were copied into the clipboard | |||
| 313 | Cost estimate was saved | |||
| 314 | You cannot use function & here | |||
| 315 | Base planning object cannot be saved - no unit of measure | Space: object requires documentation | ||
| 316 | Units of measure not fully maintained | |||
| 317 | All item quantities will be deleted for lot size & | |||
| 318 | Costing quantity & not allowed | |||
| 319 | Exch. rate cannot be changed: Foreign cur. same as local cur. | |||
| 320 | No manual changes to price or price unit of items with structure allowed | Space: object requires documentation | ||
| 321 | Unit price of cost estimate too large by & & | |||
| 322 | First item reached | |||
| 323 | Last item reached | |||
| 324 | Enter item category first | Space: object requires documentation | ||
| 325 | You cannot display possible entries for this item category | |||
| 326 | Closing for cost estimate was reset | |||
| 327 | Item category & not allowed on this list screen | |||
| 328 | Base planning object &1/&2 is flagged for deletion | Space: object requires documentation | ||
| 329 | Reducing the price unit may cause rounding errors | |||
| 330 | Item &: Origin group cannot be maintained manually | Space: object requires documentation | ||
| 331 | Item &: Cost comp no. cannot be maintained manually | Space: object requires documentation | ||
| 332 | Item &: Cost component no. was adapted to cost element | Space: object requires documentation | ||
| 333 | Cost estimate marked | Space: object requires documentation | ||
| 334 | Item &: Quantity cannot be maintained manually | Space: object requires documentation | ||
| 335 | Item &: Unit of measure cannot be maintained manually | Space: object requires documentation | ||
| 336 | Item &: Price cannot be maintained manually | Space: object requires documentation | ||
| 337 | Item &: Resource cannot be maintained manually | Space: object requires documentation | ||
| 338 | & item(s) copied into clipboard. Please note warnings in log | Space: object requires documentation | ||
| 339 | Item &1: Error in assignment between cost element and cost component | Space: object requires documentation | ||
| 340 | Item &1 cannot be changed. Cost element &2 is cost element for overhead. | Space: object requires documentation | ||
| 341 | Item &1: Manual price change, item was not revaluated | Space: object requires documentation | ||
| 342 | Item &1: Manual price change was reset | Space: object requires documentation | ||
| 343 | Warning messages have been issued - see log | Space: object requires documentation | ||
| 344 | Fixed costs invalid - entry deleted | Space: object requires documentation | ||
| 345 | Fixed costs invalid - entry deleted | Space: object requires documentation | ||
| 346 | Fixed costs invalid - entry deleted | Space: object requires documentation | ||
| 347 | Fixed costs invalid - entry deleted | Space: object requires documentation | ||
| 348 | Cost element not valid here - cost component deleted | Space: object requires documentation | ||
| 349 | In line &1, the technical field &2 was deleted | Space: object requires documentation | ||
| 350 | Costing items of type I (raw material costing) cannot be changed | Space: object requires documentation | ||
| 351 | Cost element &1 predefined in base planning object &2/&3 | Space: object requires documentation | ||
| 352 | Cost element &1 specified in resource | Space: object requires documentation | ||
| 353 | No price exists in the planning currency | |||
| 354 | No price exists in the transaction currency | |||
| 355 | Exchange rate type & does not exist | |||
| 356 | Currency & does not exist | |||
| 357 | Currency & cannot be converted into currency & | |||
| 358 | Material & does not exist | |||
| 359 | Material & does not exist in plant & | |||
| 360 | Plant & is not assigned to company code & | |||
| 361 | Plant & is not assigned to controlling area & | |||
| 362 | Specify plant | Space: object requires documentation | ||
| 363 | Process material & from plant & not allowed | |||
| 364 | No items carrying costs exist - graphic cannot be displayed | Space: object requires documentation | ||
| 365 | Entry of resource for item category &1 is not sufficient | Space: object requires documentation | ||
| 366 | Not all entries from the selected data record have been transferred | Space: object requires documentation | ||
| 367 | Total value too high - please correct your entries | Space: object requires documentation | ||
| 368 | Error in percentage calculation - total percentage set to 0 | Space: object requires documentation | ||
| 369 | Target values copied | Space: object requires documentation | ||
| 370 | Target values NOT copied | Space: object requires documentation | ||
| 371 | Unit of measure was not changed | Space: object requires documentation | ||
| 372 | Unit of measure was changed | Space: object requires documentation | ||
| 373 | Value could not be calculated from percentage | Space: object requires documentation | ||
| 374 | Target value could not be calculated | Space: object requires documentation | ||
| 375 | Unit of measure NOT changed due to & | Space: object requires documentation | ||
| 376 | Total value cannot be displayed (too high) | Space: object requires documentation | ||
| 377 | Double entry: percentage entry ignored | Space: object requires documentation | ||
| 378 | Formula contains errors | Space: object requires documentation | ||
| 379 | Error when calculating formula | Space: object requires documentation | ||
| 380 | Conversion from & to & not possible | Space: object requires documentation | ||
| 381 | Formula cannot be entered due to internal error | Space: object requires documentation | ||
| 382 | Calculated value is to high and needs to be corrected | Space: object requires documentation | ||
| 383 | Internal error: & & & & | |||
| 384 | Internal error: Transaction type & invalid | |||
| 385 | Internal error: data combination (call) | Space: object requires documentation | ||
| 386 | Internal error: unexpected return code | Space: object requires documentation | ||
| 387 | Warnings issued for formula calculation - see error log | Space: object requires documentation | ||
| 388 | Formula refers to automatically generated item(s) | Space: object requires documentation | ||
| 389 | Syntax error in formula &1 | |||
| 390 | Formula too complex: &1 | |||
| 391 | Incorrect reference in formula &1 | |||
| 392 | Incorrect reference or cyclical reference in formula &1 | |||
| 393 | Formula not permissible for item category &1 | Space: object requires documentation | ||
| 394 | Division by zero in formula &1 | |||
| 395 | Error in formula &1 | |||
| 396 | Invalid use of constant values in formula &1 | Space: object requires documentation | ||
| 397 | Total not allowed with item category &1 | Space: object requires documentation | ||
| 398 | Cost center &1 transferred from work center | Space: object requires documentation | ||
| 399 | Enter work center and plant of the work center | Space: object requires documentation | ||
| 400 | No cost center assigned to work center &1 in plant &2 | Space: object requires documentation | ||
| 401 | Work center ID &1 in line &2 not found | Space: object requires documentation | ||
| 402 | Process costs were deleted | Space: object requires documentation | ||
| 403 | Error when determining process costs -> Error log | Space: object requires documentation | ||
| 404 | Process costs not determined -> Error log | Space: object requires documentation | ||
| 405 | Raw materials costs determined successfully | Space: object requires documentation | ||
| 406 | Raw materials costs were deleted | Space: object requires documentation | ||
| 407 | No raw materials costs determined | Space: object requires documentation | ||
| 408 | Error when determining raw materials costs -> Error log | Space: object requires documentation | ||
| 409 | Raw materials costs were deleted | Space: object requires documentation | ||
| 410 | No costing items were revaluated | |||
| 411 | Lot size was changed in sales document. Cost estimate is adjusted | |||
| 412 | Pricing date was changed in sales document. Adjust cost estimate | |||
| 413 | Fixed price/value exceeds total price/value | |||
| 414 | Item & : Invalid item category & | |||
| 415 | Item & : Value too large by & & | |||
| 416 | Item & : Value too small by & & | |||
| 417 | Item & : Subtotal too large by & & | |||
| 418 | Item & : Subtotal too small by & & | |||
| 419 | Grand total too large by & & | |||
| 420 | Grand total too small by & & | |||
| 421 | Item & : Quantity too large | |||
| 422 | Foreign cur. amount too large by & & | |||
| 423 | Costing foreign currency was changed | |||
| 424 | Foreign currency amount too small by & & | |||
| 425 | Item & : Price too large by & & | |||
| 426 | Item & : Price too small by & & | |||
| 427 | Costing header foreign currency was not changed | |||
| 428 | Item foreign currency was not changed | |||
| 429 | Cost element not allowed for costing variant & | Space: object requires documentation | ||
| 430 | Cost element was deleted | |||
| 431 | Cost estimate was revalued | |||
| 432 | Item foreign currency was changed | |||
| 433 | Overhead rate too large by & & | |||
| 434 | Overhead successfully calculated | |||
| 435 | Overhead rates deleted | |||
| 436 | No overhead rates calculated | |||
| 437 | Overhead cannot be applied | |||
| 438 | Item & : Cost element & does not exist in CO area & for & | |||
| 439 | Enter cost element | Space: object requires documentation | ||
| 440 | Ref. unit of measure & cannot be converted into unit of measure & | |||
| 441 | Qty does not meet requirements of the unit of measure | |||
| 442 | Item &: Cost element does not match planned cost element | |||
| 443 | Item & : Cost element & has an invalid cost element category | |||
| 444 | Item & : Item indicator & not allowed | |||
| 445 | Foreign currency (or currencies) successfully changed | |||
| 446 | Foreign currency (or currencies) not changed. See error log | |||
| 447 | Do not enter both an exchange rate and an exchange rate date/type | Space: object requires documentation | ||
| 448 | No foreign currency or currencies entered | |||
| 449 | Select the items relevant to processing | Space: object requires documentation | ||
| 450 | No costing variant was selected | |||
| 451 | Overflow. See error log | |||
| 452 | Lot size was not changed. See error log | |||
| 453 | You cannot currently exit after only temporarily saving. See error log | |||
| 454 | Costing header foreign currency was not changed. See error log | |||
| 455 | Item foreign currency was not changed. See error log | |||
| 456 | Cost estimate could not be revalued. See error log | |||
| 457 | No items were added. See error log | |||
| 458 | No overhead was calculated - see error log | Space: object requires documentation | ||
| 459 | Cost estimate could not be referenced. See error log | |||
| 460 | Cost estimate could not be adjusted. See error log | |||
| 461 | Total value of cost estimate changed. See error log | |||
| 462 | Base object explosion could not be carried out. See error log | Space: object requires documentation | ||
| 463 | Not all cost elements could be determined. See error log | |||
| 464 | Error while processing formulas. See error log | |||
| 465 | Function could not be executed. See error log | |||
| 466 | Function successfully executed. See log | |||
| 467 | Messages have been issued. Please refer to the error log. | Space: object requires documentation | ||
| 468 | Cost estimate successfully revaluated: Warnings -> Error log | Space: object requires documentation | ||
| 469 | **** Messages for Base Planning Object Overview *** | Space: object requires documentation | ||
| 470 | No base planning objects could be selected | Space: object requires documentation | ||
| 471 | Select a valid line | Space: object requires documentation | ||
| 472 | No cost estimate found for base planning object &1 | Space: object requires documentation | ||
| 473 | Place the cursor on the required base planning object | Space: object requires documentation | ||
| 474 | ***** Messages for Base Object Explosion / Material Explosion ******* | Space: object requires documentation | ||
| 475 | No cost estimate found for &1 &2 | |||
| 476 | No costing item found for &3 &1 | |||
| 477 | The price of base planning object &1 has changed | Space: object requires documentation | ||
| 478 | Error when reading &1 &2 explosion level: &3 | |||
| 479 | Cyclic use found for base planning object &1 | Space: object requires documentation | ||
| 480 | No base planning objects selected for explosion | Space: object requires documentation | ||
| 481 | No base planning objects exist for explosion | Space: object requires documentation | ||
| 482 | Base planning object &1: Overhead deleted | Space: object requires documentation | ||
| 483 | Enter a valid number of explosion levels | Space: object requires documentation | ||
| 484 | Item quantity was rounded | |||
| 485 | Base object explosion successfully executed | Space: object requires documentation | ||
| 486 | Base planning object &1 in CO area &2 does not exist | Space: object requires documentation | ||
| 487 | Costing variant &1 does not exist | |||
| 488 | Base planning object &1: Overflow | Space: object requires documentation | ||
| 489 | Item qty converted from &1 &2 to &3 &4 | |||
| 490 | No overhead costs were calculated | Space: object requires documentation | ||
| 491 | There is no plant &2 in controlling area &1 | Space: object requires documentation | ||
| 492 | Mixed cost estimate in explosion level &1 for material &2 plant &3 | Space: object requires documentation | ||
| 493 | Mixed cost estimate exists: maximum of &1 explosion level(s) possible | Space: object requires documentation | ||
| 494 | ***** Messages for Where-Used List of Base Planning Objects ****** | Space: object requires documentation | ||
| 495 | No usage found for base planning object & & | Space: object requires documentation | ||
| 496 | No selection made for where-used list | |||
| 497 | Controlling area has been changed | |||
| 498 | ***** End of Unit Costing Error Messages - Fuction Module *********** | |||
| 499 | ********** Error Messages for Unit Costing EXCEL Link *************** | |||
| 500 | Unit of measure & has not been created in language & | |||
| 501 | Cost element & has an invalid cost element category | |||
| 502 | Cost element & in CO area & does not exist for & | |||
| 503 | Item &: Invalid entries for item category & deleted | |||
| 504 | No possible entries available for this field | |||
| 505 | Item &: costing variant requires a cost element | |||
| 506 | Item &: costing variant does not allow a cost element | |||
| 507 | Material & is not assigned to a valid plant | |||
| 508 | Cost center & controlling area & on & not assiged to activity types | |||
| 509 | Enter a purchasing group | Space: object requires documentation | ||
| 510 | Enter the material group for a purchase requisition without material no. | Space: object requires documentation | ||
| 511 | Non-deletable items (J, G or X categories) were inserted again | The short text describes the object sufficiently | ||
| 512 | No information available for the selected item | The short text describes the object sufficiently | ||
| 513 | The data is either incomplete or inconsistent | Space: object requires documentation | ||
| 514 | Data is consistent | Space: object requires documentation | ||
| 515 | This function is not yet supported | |||
| 516 | & & & & | |||
| 517 | ****** End of Unit Costing Error Messages 000 - 899 *********** | |||
| 518 | *****Last of error messages for unit costing 000 - 999 ******** |
History
| Last changed on/by | 19970723 | SAP | |
| SAP Release Created in |