SAP ABAP Interface IF_KPC_SE_COMMITMENTPERTOTAL (Interface for BAdI: KPC_SE_COMMITMENTPERTOTAL)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
CO (Application Component) Controlling
⤷
KPC_XI_PROXY (Package) Project Costing

⤷

⤷

Properties
Interface | IF_KPC_SE_COMMITMENTPERTOTAL | |
Short Description | Interface for BAdI: KPC_SE_COMMITMENTPERTOTAL |
General Data
Package | KPC_XI_PROXY | Project Costing |
Created | 20090612 | SAP |
Last changed | 20100310 | SAP |
Unicode checks active |
Forward declarations
Interface IF_KPC_SE_COMMITMENTPERTOTAL has no forward declaration.
Interfaces
# | Interface | Abstract | Final | Description | Created on |
---|---|---|---|---|---|
1 | IF_BADI_INTERFACE | Tag Interface for BAdIs | 20090612 |
Friends
Interface IF_KPC_SE_COMMITMENTPERTOTAL has no friend.
Attributes
Interface IF_KPC_SE_COMMITMENTPERTOTAL has no attribute.
Methods
# | Method | Level | Visibility | Method type | Description | Created on |
---|---|---|---|---|---|---|
1 | ![]() |
Instance method | Public | Method | 20090612 | |
2 | ![]() |
Instance method | Public | Method | 20090612 |
Events
Interface IF_KPC_SE_COMMITMENTPERTOTAL has no event.
Types
Interface IF_KPC_SE_COMMITMENTPERTOTAL has no local type.
Method Signatures
Method INBOUND_PROCESSING Signature
# | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
C_INPUT_BADI_INBOUND | Call by reference | Type reference (TYPE) | KPC_PROJECT_COMMITMENT_LEDGER2 | ProjectCommitmentLedgerAccountERPPeriodTotalByElementsQuery | 20090612 |
# | Exception | Resumable | Description | Created on |
---|---|---|---|---|
1 | ![]() |
Error in BAdI Processing in Proxy | 20090612 |
Method OUTBOUND_PROCESSING Signature
# | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
C_OUTPUT_BADI_OUTBOUND | Call by reference | Type reference (TYPE) | KPC_PROJECT_COMMITMENT_LEDGER3 | ProjectCommitmentLedgerAccountERPPeriodTotalByElementsRespon | 20090612 | ||
2 | ![]() |
IT_RETURN | Call by reference | Type reference (TYPE) | KPC_BAPIRET2_T | Table Type for BAPIRET2 | 20090615 | ||
3 | ![]() |
LT_PERIOD_TOTAL | Call by reference | Type reference (TYPE) | KPC_PERIOD_TOTAL_T | Table Type KPC_PERIOD_TOTAL | 20090615 |
# | Exception | Resumable | Description | Created on |
---|---|---|---|---|
1 | ![]() |
Error in BAdI Processing in Proxy | 20090612 |
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 605 |