SAP ABAP Data Element XGBEGIN4 (X field for value domain GBEGIN)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
AC (Package) Application Development R/3 Assets: Customizing
⤷
⤷
⤷
Basic Data
| Data Element | XGBEGIN4 |
| Short Description | X field for value domain GBEGIN |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 0 | |
| Medium | 0 | |
| Long | 40 | FROM org.acq.date for asset under constr |
| Heading | 0 |
Documentation
Definition
Set this indicator, if you want the calculation of the cut-off dates for the defined asset percentage rates to begin after the acquisition date of the original asset under construction for the asset.
Example
Start of the calculation of cut-off dates: capitalization date
Period of validity: 5 years
Percentage rate: 5%
=> The cut-off value percentage of 5% is valid for assets that are not older than 5 years old (calculated from the capitalization date).
History
| Last changed by/on | SAP | 20010607 |
| SAP Release Created in | 470 |