SAP ABAP Data Element WGRC_FRAMESIZE (Interval in Minutes for Next Assignment in RWGRC001)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-PUR (Application Component) Purchasing
⤷ WGRC (Package) Goods Receipt Capacity Check in Purchasing
⤷ MM-PUR (Application Component) Purchasing
⤷ WGRC (Package) Goods Receipt Capacity Check in Purchasing
Basic Data
Data Element | WGRC_FRAMESIZE |
Short Description | Interval in Minutes for Next Assignment in RWGRC001 |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Interval |
Medium | 20 | Interval in Minutes |
Long | 40 | Interval in Minutes for Next Assignment |
Heading | 55 | Interval in Minutes for Next Assignment |
Documentation
Definition
Interval in minutes for next assignment in function Vendor Assignment.
Use
If you assign times to the vendor, the actual content of the door or staging area is not known. You can therefore specify a temporal minimum interval for planning.
Note that this setting (interval in minutes) is overwritten if the "Double Assignment in Planning" indicator is set.
Dependencies
Example
Interval: 15 minutes
Vendor A is planned for 8:00 a.m.
Vendor B can be planned for 8:15 a.m. at the earliest.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |