SAP ABAP Data Element WERT_GES_BWAEHR (Total value in company code currency)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-IS (Application Component) Product Cost Controlling Information System
     KKB (Package) Reporting for Costing
Basic Data
Data Element WERT_GES_BWAEHR
Short Description Total value in company code currency  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Val.in CCC 
Medium 15 Val.in CoCdCur 
Long 20 Val.in CoCdCur 
Heading 15 Val.in CoCdCur 
Documentation

Definition

Total value of a period in the currency of the object.

Planning

Procedure

If you want to plan costs in the cost center currency or in the order currency, you must define the corresponding field in the planning layout and enter a plan value in primary cost planning.

Use

If the appropriate field has been defined in the planning layout, the costs are automatically calculated in controlling area currency.
However, if you also want to manually plan costs in the transaction currency, the costs are calculated in the controlling area currency from the costs in the transaction currency.
If the costs are also manually planned in the controlling area currency, no conversion takes place.

If the field in the planning layout is not defined, the costs are automatically calculated in the cost center currency from the costs in the controlling area currency.

Note

  • You can only plan costs in a foreign currency if you specified in configuration with the "All currencies" indicator that these update the controlling area and fiscal year. You receive a warning message if this is not the case. If you ignore the warning, the planning parameters entered are used, but you can only plan the costs in the CO area currency.
  • You should make sure that entries are defined in the exchange rate table for any exchange rates that may be needed.

    Maintain Exchange Rates

  • If an update in a particular foreign currency is allowed, you can display all the currency field groups irrespective whether these are planned manually or not.

History
Last changed by/on SAP  19970812 
SAP Release Created in