SAP ABAP Data Element WERKS_PA_ACT (Plant Used for Reading Cost Estimate)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KE (Package) Profitability Analysis
Basic Data
Data Element WERKS_PA_ACT
Short Description Plant Used for Reading Cost Estimate  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERKS    
Data Type CHAR   Character String 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table T001W    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plant 
Medium 16 Cost est. plant 
Long 40 Plant used for reading cost estimate 
Heading 40 Plant used for reading cost estimate 
Documentation

Definition

With the "Plant used for reading cost estimate", you specify which plant should be used to find a valid cost estimate for a given material using the costing keys assigned to that material.

By default, the system always accesses cost estimates in Product Cost Controlling on the basis of the plant quoted in the CO-PA line item. There are two ways of changing this default setting:

  • In "Costing Key Definition" (in Customizing for valuation, under "Define Keys for Accessing Material Cost Estimates"), you can enter a plant explicitly.

    If a plant is specified as a fixed entry in the costing key definition, the system always uses that plant when accessing costing data.

  • With the "Assign Costing Keys to Any Characteristics" activity, it is possible to include the "Plant used for reading cost estimate" field in the definition of your assignment table.

    If costing keys are accessed using "flexible assignment" during valuation with a material cost estimate and the relevant assignment table also contains a designated valuation plant, then the costing data for any costing keys without an explicitly designated plant is read using the plant entered in the assignment table as opposed to the plant stored in the CO-PA line item.

History
Last changed by/on SAP  20000119 
SAP Release Created in 46C