SAP ABAP Data Element VSN_ABG_VW (Usage of Results Analysis Version)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Data Element | VSN_ABG_VW |
Short Description | Usage of Results Analysis Version |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | VSN_ABG_VW | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Usg RA ver |
Medium | 15 | Usage RA vrsn |
Long | 20 | Usage RA version |
Heading | 4 | Usg. |
Documentation
Definition
Determines whether results analysis is carried out using actual data or the revenue planned until the results analysis period.
Use
In the first case, results analysis is carried out using actual data. The actual costs are the costs that correspond to the actual revenue earned up to the results analysis period.
For information purposes, you can also simulate results analysis on the basis of the revenue planned up to the results analysis period.
In this case, the calculated costs are the costs that correspond to the revenue planned until the results analysis period. In the valuation method, you determine
- which version of revenue planning is used
- whether the profit is calculated on the basis of the revenue planned until the results analysis period
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |