SAP ABAP Data Element VPERIOD (Maximum number of future periods in case of extension)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ WBON (Package) WWS: Bonus
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ WBON (Package) WWS: Bonus
Basic Data
Data Element | VPERIOD |
Short Description | Maximum number of future periods in case of extension |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT1 | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Max.period |
Medium | 15 | Maximum periods |
Long | 20 | Maximum periods |
Heading | 0 |
Documentation
Definition
Maximum number of validity periods for which the rebate arrangements can be extended into the future (starting from the current date).
Example
For the rebate arrangement calendar AJ (arrangements yearly), a value of 1 period means that a program run with a start date in 1997 can only generate rebate arrangements with a validity period of 01.01.1998 to 12.31.1998. It is not possible to create arrangements extending beyond 12.31.1998.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in |